Baltimore City · 21231
340 S COLLINGTON AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $141,900
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Nov 6, 2014
Assessment
| Owner | EMMA AND ELIZABETH PETROVICH |
|---|---|
| Land use | Residential (R) |
| Total assessment | $141,900 (cycle 2026) |
| Last sale | Nov 6, 2014 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
14| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | REPLACE DRYWALL IN ENTIRE HOME, REPLACE ENTIRE KITCHEN DRYWALL, ALL CABINETS, COUNTERTOPS, REPLACE ANY JOISTS THAT ARE ROTTEN, REPLACE ENTIRE ROOF DUE TO LEAKING, REPLACE DOORS AND WINDOWS THAT ARE ROTTED AND MOLDY, REPLACE STAIRCASE DUE TO ROTTEN WOOD, REPAINT ENTIRE HOME, REPLACE ALL INTERIOR DOORS. SEPARATE PERMIT WILL BE REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING WORK. AS PER CODE. | $1,500 | Jul 26, 2024 |
| COM2023 | Extend Original Permit.(original permit:COM2021-77641:INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK) Original Permit Description:(COM2021-77641) INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | Apr 13, 2023 |
| COM2022 | AMEND PERMIT: CHANGE ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-68120:SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: INSTALLATION OF 200A SERVICE UPGRADE, BRANCH CIRCUITS (25) FOR LIGHT, OUTLETS, APPLIANCES, AND SMOKE DETECTORS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE) Original Permit Description:(COM2022-68120) SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: INSTALLATION OF 200A SERVICE UPGRADE, BRANCH CIRCUITS (25) FOR LIGHT, OUTLETS, APPLIANCES, AND SMOKE DETECTORS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | — | Oct 19, 2022 |
| COM2022 | INSTALL (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 80000 BTU FUEL PIPING (OTHER THAN 1 OR 2 FAMILY), (1) 35000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | $1,000 | Sep 25, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-77641:INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK) Original Permit Description:(COM2021-77641) INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | Sep 21, 2022 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-79259:INSTALL (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 80000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2021-79259) INSTALL (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 80000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jun 23, 2022 |
| COM2022 | SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: INSTALLATION OF 200A SERVICE UPGRADE, BRANCH CIRCUITS (25) FOR LIGHT, OUTLETS, APPLIANCES, AND SMOKE DETECTORS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $950 | May 23, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-77641:INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK) Original Permit Description:(COM2021-77641) INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | — | Mar 30, 2022 |
| COM2021 | INSTALL (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.), (1) 80000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP AS PER CODE. | $6,000 | Sep 27, 2021 |
| COM2021 | INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION CATEGORY III REMOVAL OF INTERIOR STRUCTURAL WALL AND NON STRUCTURAL WALLS. PLASTER, STAIRS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS WITHIN PROPERTY, INSTALL NEW INTERIOR STAIRCASE (STAIRCASE WILL MAINTAIN PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''), INSTALLATION OF NEW 2X10 FLOOR JOISTS SYSTEM WITHIN EXISTING POCKETS, INSTALL NEW DRYWALL, TRIM, NEW HANDRAIL, MINIMUM HEIGHT 36” MAX SPACING 4” INSTALL NEW INTERIOR DOORS, NEW WINDOWS, INSTALLATION OF WALL AND CEILING INSULATION WALL R20, R 13 IN BASEMENT, CEILING R49, INSTALL NEW WOOD HANDRAILS (MINIMUM HEIGHT OF 36''), CONSTRUCT 3 STORY REAR ADDITION PER BMZA 2021-120 AS PER DRAWINGS AND PER BALTIMORE CITY CODE MAX HEIGHT 35 FT. (NOTES: 1. ALL HABITABLE AREAS WILLL MAINTAIN MINIMUM CEILING OF HEIGHT OF 7 FT, 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36”, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ FT PER ONE OCCUPANCY OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ADDITION WILL MAINTAIN ALL PROPER SETBACKS AND ALL WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES). ALL APPROVED WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE. PROPERTY SITE WILL BE KEPT CLEAN OF DEBRIS AND TRASH AND MAINTAIN SECURITY AS PER CODE DURING CONSTRUCTION. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | $4,500 | Sep 22, 2021 |
| BMZ2021 | construct a two-story rear addition. construct a third floor addition. | — | May 12, 2021 |
| COM2020 | INSTALL (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (6) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # GAS TEST, (1) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | $5,000 | Oct 14, 2020 |
| COM2020 | INSTALL (10) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $2,500 | Oct 14, 2020 |
| COM2020 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALL EXTERIOR WALL FRAMING ONLY (NO NEW PARTITION WALLS TO BE BUILT/PERIMETER WALLS ONLY)/INSTALL 600 SQ FT OF DRYWALL/EXTERIOR ALTERATIONS TO INCLUDE: REPLACE 2 EXTERIOR DOORS (SAME SIZE SAME LOCATION), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $2,500 | Oct 14, 2020 |
Violations
2| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 305.7 | O | $50 | $150 | Jan 2, 2026 |
| citation | PM 305.1 | O | $50 | $150 | Jul 1, 2024 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 55 m · 310 S COLLINGTON AVE
- violation: HCD-Sanitation PropertyJul 8, 2026 · 87 m
- violation: HCD-Sanitation PropertyJul 8, 2026 · 136 m · 336 S PATTERSON PARK AVE
- permit: BRCMJul 7, 2026 · 131 m · 332 S PATTERSON PARK AVE
- violation: HCD-Maintenance StructureJul 5, 2026 · 125 m · 414 S MADEIRA ST
- permit: BRCMJul 2, 2026 · 94 m · 305 S CHESTER ST
- permit: BRCMJul 1, 2026 · 94 m · 305 S CHESTER ST
- violation: HCD-Sanitation PropertyJul 1, 2026 · 146 m · 230 S COLLINGTON AVE
- violation: HCD-CCE Building Permit ComplaintJun 27, 2026 · 143 m · 402 S PATTERSON PARK AVE
- violation: PM 305.2.2Jun 25, 2026 · 68 m · 2201 GOUGH ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.