Baltimore City · 21224
514 S MILTON AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $488,500
- Land use
- Residential (R)
- Year built
- 1915
- Last sale
- Sep 3, 2024
Assessment
| Owner | FARLEY, GABRIELLA |
|---|---|
| Land use | Residential (R) |
| Total assessment | $488,500 (cycle 2026) |
| Last sale | Sep 3, 2024 — $500,000 |
| Year built | 1915 |
| Zoning | R-8 |
| Vacant | — |
Permits
8| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE-FAMILY DWELLING. | — | Aug 23, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-81092:INSTALL (1) # ELECTRIC WATER HEATER, (12) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 80 BTU FUEL-BURNING EQUIP, (1) 35 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-81092) INSTALL (1) # ELECTRIC WATER HEATER, (12) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 80 BTU FUEL-BURNING EQUIP, (1) 35 BTU FUEL-BURNING EQUIP AS PER CODE. | — | May 17, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-71419:DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (19). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (15' X 3'-6'') (52.5 SQFT), NEW INTERIOR STAIR TO NEW ROOFTOP DECK (15' X 16'), NEW BASEMENT REAR EGRESS WINDOW & WINDOW WELL. NEW EXTERIOR DOORS (3), WINDOWS (15). DEMO/REPOUR EXISTING REAR CONCRETE SLAB (15'X18'-6'')(277 SF). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) ) Original Permit Description:(COM2022-71419) DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (19). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (15' X 3'-6'') (52.5 SQFT), NEW INTERIOR STAIR TO NEW ROOFTOP DECK (15' X 16'), NEW BASEMENT REAR EGRESS WINDOW & WINDOW WELL. NEW EXTERIOR DOORS (3), WINDOWS (15). DEMO/REPOUR EXISTING REAR CONCRETE SLAB (15'X18'-6'')(277 SF). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | — | Feb 24, 2023 |
| COM2023 | INSTALL (16) # BRANCH CIRCUITS/FEEDERS , (15) # LOW VOLTAGE, (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $12,000 | Jan 18, 2023 |
| COM2023 | INSTALL (1) 24 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 60 BTU FUEL-BURNING EQUIP(FURNACE), (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY) AS PER CODE. | $10,000 | Jan 10, 2023 |
| COM2022 | INSTALL (1) # ELECTRIC WATER HEATER, (12) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 80 BTU FUEL-BURNING EQUIP, (1) 35 BTU FUEL-BURNING EQUIP AS PER CODE. | $9,500 | Sep 16, 2022 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS | $5,000 | Aug 23, 2022 |
| COM2022 | DEMO WORK: CATEGORY 2 DEMO (500 SF) OF BEARING & NON-BEARING STUD WALLS, STAIRS, PLASTER, TRIM, INSULATION, FLOORING / ROOFING & DEBRIS. DEMO EXISTING 2ND FLOOR REAR WALL. AS PER PLANS, AS PER CODE. NEW INTERIOR WORK: FRAMING (1,000 SF) W/ STUD WALLS, STAIRCASE (7-3/4''RISER,11''TREAD,3'WIDE) W/ HANGERS, DRYWALL, TRIM, INSULATION (R-20 WALLS, R-49 ROOF). DOORS (19). NEW EXTERIOR WORK: NEW 2ND FLOOR REAR ADDITION (15' X 3'-6'') (52.5 SQFT), NEW INTERIOR STAIR TO NEW ROOFTOP DECK (15' X 16'), NEW BASEMENT REAR EGRESS WINDOW & WINDOW WELL. NEW EXTERIOR DOORS (3), WINDOWS (15). DEMO/REPOUR EXISTING REAR CONCRETE SLAB (15'X18'-6'')(277 SF). AS PER PLANS, AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | $100,000 | Aug 23, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 4, 2026 · 46 m
- violation: HCD-Sanitation PropertyJul 1, 2026 · 129 m · 625 S PORT ST
- violation: HCD-Sanitation PropertyJun 29, 2026 · 128 m · 616 S PORT ST
- violation: PM 306.7Jun 26, 2026 · 81 m · 2501 FLEET ST
- violation: HCD-Sanitation PropertyJun 25, 2026 · 84 m · 621 S MILTON AVE
- violation: SW-Dirty AlleyJun 22, 2026 · 124 m · 502 S MONTFORD AVE
- violation: HCD-Illegal DumpingJun 19, 2026 · 143 m · 500 S LUZERNE AVE
- violation: HCD-Sanitation PropertyJun 17, 2026 · 77 m · 2501 FLEET ST
- permit: BRCMJun 16, 2026 · 119 m · 2529 FLEET ST
- violation: HCD-Maintenance StructureJun 15, 2026 · 37 m · 2438 FLEET ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.