Baltimore City · 21224
3115 O DONNELL ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $323,000
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Mar 5, 2019
Assessment
| Owner | CLARK, NICHOLAS A |
|---|---|
| Land use | Residential (R) |
| Total assessment | $323,000 (cycle 2026) |
| Last sale | Mar 5, 2019 — $319,000 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
7| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2019 | install (4) 225 btu fuel-burning equip as per code. | $2,500 | Jul 25, 2019 |
| COM2019 | install (10) # low voltage, (10) # branch circuits/feeders as per code. | $5,000 | May 6, 2019 |
| COM2019 | install (1) 52000 btu fuel-burning equip as per code. | $150 | Apr 30, 2019 |
| COM2019 | install (1) 30000 btu air-con system, condensor, (1) 70000 btu fuel-burning equip(furnace), (1) # new distribution system (1-2 family) as per code. | $5,294 | Apr 15, 2019 |
| COM2019 | finish basement with 2x4 walls, r13 insulation at all exterior locations, remove and replace (2) basement windows, drywall trim and paint through out. build new stair with 13 risers @ 8-3/16" and 9" tread runs as per drawing attached and as per baltimore city code electrical, plumbing and hvac permit by others | $25,000 | Mar 28, 2019 |
| COM2019 | install (6) # plumbing fixtures, (1) # drain tile, (1) # sanitary connection (reconstruction0, (1) # water service pipe (reconstruction) as per code. | $4,500 | Mar 20, 2019 |
| COM2019 | must be done under the direction of a structural engineer as indicated on the certification of the work filed with the approved plans. engineer's certification containing inspection dates and approvals must be filed with the building official within 10 days of the completion of this work. excavate to engineers detail with draintile and waterproofing. dig out basement from 6' to 8'-8" add 4" stone with 4" thick concrete slab for an 8' finished ceiling height as per plans as per code. excavation and placement of concrete must be done under the direction of a structural engineer as indicated on the certification of the work filed with the approved plans. engineer's certification containing inspection dates and approvals must be filed with the building official within 10 days of the completion of this work. all work will be done according to baltimore city code and per submitted drawings. | $15,000 | Mar 7, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 8, 2026 · 145 m · 3201 DILLON ST
- permit: BRCMJul 7, 2026 · 96 m · 1113 S DECKER AVE
- permit: BRCMJul 7, 2026 · 114 m · 3121 DILLON ST
- violation: HCD-Zoning InvestigationJul 6, 2026 · 126 m · 1000 S ELLWOOD AVE
- permit: BRCMJul 2, 2026 · 114 m · 3121 DILLON ST
- violation: HCD-Sanitation PropertyJul 1, 2026 · 119 m · 3121 DILLON ST
- permit: BRCMJun 25, 2026 · 149 m · 3008 O DONNELL ST
- violation: HCD-Sanitation PropertyJun 20, 2026 · 69 m · 1120 S EAST AVE
- violation: HCD-CCE Building Permit ComplaintJun 13, 2026 · 136 m · 3031 ELLIOTT ST
- violation: HCD-Sanitation PropertyJun 9, 2026 · 135 m · 3219 O DONNELL ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.