Baltimore City · 21224

2905 DILLON ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$557,400
Land use
Residential (R)
Year built
1910
Last sale
Feb 2, 2024

Assessment

OwnerHARMON, GENE
Land useResidential (R)
Total assessment$557,400 (cycle 2026)
Last saleFeb 2, 2024 — $575,000
Year built1910
ZoningR-8
Vacant

Permits

9
TypeDescriptionCostIssued
USE2023USE AS A SINGLE FAMILY DWELLINGDec 12, 2023
COM2023REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-57881:NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. REPLACE EXISTING FIRST FLOOR FRAMING AT THE REAR. NEW FIRST FLOOR ADDITION. (13’-0“X 2’-0” + 5’-0” X 11’-0”) SECOND FLOOR ADDITION. (13’-0“X 16’-0”) NEW ROOF TOP DECK (13’-0” X 18’-0) NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (8), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES)) Original Permit Description:(COM2023-57881) NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. REPLACE EXISTING FIRST FLOOR FRAMING AT THE REAR. NEW FIRST FLOOR ADDITION. (13’-0“X 2’-0” + 5’-0” X 11’-0”) SECOND FLOOR ADDITION. (13’-0“X 16’-0”) NEW ROOF TOP DECK (13’-0” X 18’-0) NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (8), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES)Nov 28, 2023
COM2023INSTALL (1) 150 AMPS ENLARGE ELECTRICAL METERS, (20) # BRANCH CIRCUITS/FEEDERS , (6) # LOW VOLTAGE AS PER CODE.$5,000Jun 21, 2023
COM2023INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (3) 100 CFM EXHAUST SYSTEMS , (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE.$12,400Jun 8, 2023
COM2023INSTALL (1) # BACKFLOW PREVENTION DEVICE (<2'' DIAMETER), (1) # ELECTRIC WATER HEATER, (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 60000 BTU FUEL-BURNING EQUIP AS PER CODE.$4,500Mar 24, 2023
COM2023NON-STRUCTURAL DEMO & REMOVAL OF PLASTER, DRYWALL, WINDOWS, DOORS, NON-BEARING WALLS, ROOFING & FLOOR MATERIAL, & REMOVAL OF DEBRIS AND EQUIP. REMOVE FLOOR JOISTS FOR NEW STAIRS’ FRAMING. REPLACE EXISTING FIRST FLOOR FRAMING AT THE REAR. NEW FIRST FLOOR ADDITION. (13’-0“X 2’-0” + 5’-0” X 11’-0”) SECOND FLOOR ADDITION. (13’-0“X 16’-0”) NEW ROOF TOP DECK (13’-0” X 18’-0) NEW INTERIOR FRAMING & DRYWALL (2X4STUDS AT 16''O.C.) FOR BASEMENT, 1ST & 2ND FLOOR. NEW 3'-0'' WIDE INTERIOR STAIRS (7.75''MAX RISERS & 10'' MIN. TREADS) AND HANGERS. NEW FLOOR FINISHING, NEW INTERIOR DOORS (8), NEW EXTERIOR DOORS(3), NEW WINDOWS(7), NEW SIDINGS AND NEW RUBBER ROOF OVER EXISTING ROOF. EXISTING WINDOWS AND DOORS SAME SIZES AND LOCATIONS. NEW CONCRETE PARKING PAD. NEW INSULATION (R49 FOR ROOF, R21 FOR EXTERIOR WALLS). (MECH., ELECT. AND PLUMBING PERMITS TO OBTAIN SEPARATELY.), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES)$95,000Mar 20, 2023
COM2023REMOVE FORMSTONE, CLEAN AND REPOINT EXISTING BRICK PER BALTIMORE CITY CODE$2,800Mar 2, 2023
COM2022SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER'S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETION OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. EXISTING BASEMENT HEIGHT = 6'-0'', PROPOSED HEIGHT = 8'-0''. NEW 4'' CONCRETE SLAB ON 4'' GRAVEL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS$5,000Feb 10, 2023
BMZ2023to construct two story rear addition with rooftop deckJan 30, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.