Baltimore City · 21224
500 S LINWOOD AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $7,900,400
- Land use
- Exempt Commercial (EC)
- Year built
- 1917
- Last sale
- May 2, 1988
Assessment
| Owner | MAYOR AND CITY COUNCIL OF |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $7,900,400 (cycle 2026) |
| Last sale | May 2, 1988 |
| Year built | 1917 |
| Zoning | R-8 |
| Vacant | — |
Permits
12| Type | Description | Cost | Issued |
|---|---|---|---|
| BUSE | USE PORTION OF EXISTING SCHOOL AS A gymnasium and classroom. | — | Aug 14, 2025 |
| COM2024 | ADD 74 NEW SPRINKLER HEADS AND PIPING TO AN EXISTING OVERHEAD SPRINKLER SYSTEM TO ACCOMMODATE A NEW ADDITION TO AN EXISTING FACILITY. ADDITIONAL SYSTEM TO BE PROVIDED WITH HYDRAULIC CALCULATIONS. AS PER PLANS AS PER CODE. | — | Mar 11, 2025 |
| COM2024 | PROVIDE FIRE ALARM DEVICES FOR HAMPSTEAD HILL ACADEMY SCHOOL. INSTALL 6 POOL STATIONS, 1 SMOKE DETECTOR, 1 SPEAKER, 12 A/V DEVICES AND 1 STROBE. AS PER PLANS AS PER CODE. | — | Feb 17, 2025 |
| COM2024 | INSTALL (30) # LOW VOLTAGE AS PER CODE. | $7,000 | Jan 8, 2025 |
| COM2024 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2022-02632:SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-02632) SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE. | — | Dec 18, 2024 |
| COM2024 | AMEND PERMIT: ADD ELECTRIC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-02632:SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-02632) SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE. | — | Mar 19, 2024 |
| COM2023 | AMEND PERMIT: ADD ONSITE CONTRACTOR .(ORIGINAL PERMIT:COM2022-02632:SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-02632) SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE. | — | Dec 20, 2023 |
| COM2023 | AMEND PERMIT: ADD PLUMBER , GAS AND HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2022-02632:SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-02632) SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE. | — | Dec 14, 2023 |
| COM2022 | SCOPE OF WORK:-----ADDITION----THE CONSTRUCTION OF A 3 STORY CLASSROOM ADDITION, GYMNASIUM AND ASSOCIATED CIRCULATION TO THE EXISTING STRUCTURE, THE GYMNASIUM WILL ALSO HAVE A ROOFTOP PLAY AREA AND A NEW SCREENED MECHANICAL ENCLOSURE, ----INTERIOR ALTERATIONS---IEBC ALTERATION LEVEL II WORK WITHIN THE EXISTING STRUCTURE WILL BE REQUIRED TO CONNECT THE ADDITION AND PROVIDE NECESSARY INFRASTRUCTURE, THE SUPERSTRUCTURE CONSISTS OF STRUCTURAL STEEL, THE FACADE IS COMPOSED PRIMARILY OF GLAZED ALUMINUM CURTAIN WALL/ STOREFRONT FRAMING, WITH AREAS OF BRICK VENEER WITH MASONRY BACKUP, THE ROOF ASSEMBLY CONSISTS OF A METAL DECK WITH CONCRETE TOPPING, INSULATION AND A THERMOPLASTIC POLYOLEFIN ROOF MEMBRANE, VERTICAL CIRCULATION INCLUDES TWO EGRESS STAIRS, ALSO INCLUDES VARIOUS MECHANICAL AND ELECTRICAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, DEDICATED OUTDOOR AIR SYSTEM UNITS AND DUCTWORK, NATURAL GAS, STORM DRAINAGE, SANITARY, LIGHTING, POWER, AND LIFE SAFETY DEVICES. -------GRADING-------SITE-RELATED SCOPE INCLUDES BURIED UTILITIES, SEDIMENT CONTROL, STORM WATER MANAGEMENT, AND LANDSCAPING,------PAVING-----PAVING, SURFACE PARKING, SITE LIGHTING, ADD ALTERNATE TO REHABILITATE THE EXISTING GYMNASIUM INTO A FUNCTIONAL AUDITORIUM WITH UPPER LEVEL TECH BOOTH AS PER PLANS AS PER CODE. | $10,000,000 | Dec 1, 2023 |
| COM2022 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2022-01733:RELOCATION OF THE EXISTING TRANSFORMER LOCATED IN THE COURTYARD ON THE EAST SIDE OF THE EXISTING BUILDING, WORK IS BEING UNDERTAKEN PRIOR TO THE COMMENCEMENT OF CONSTRUCTION FOR THE FUTURE ADDITION TO THE BUILDING (WORK WILL ALLOW FOR THE SCHOOL TO REMAIN OPEN DURING THE SCHOOL YEAR) THE EXISTING TRANSFORMER ON THE EAST SIDE OF THE BUILDING WILL BE REMOVED ONCE THE NEW TRANSFORMER IS ENERGIZED, THE NEW TRANSFORMER AND SERVICE WILL BE LOCATED ON THE SOUTHWEST CORNER OF THE SITE ALONG FLEET STREET. THE EXTERIOR WORK IS LIMITED TO WORK REQUIRED TO RELOCATE THE TRANSFORMER ONLY. INSIDE THE BUILDING, A NEW ELECTRIC ROOM WILL BE CREATED WITH CONSTRUCTION LIMITED TO FURRING THE EXISTING WALL FOR THE ELECTRIC PANELS AND EQUIPMENT, ADDING A DOOR AT GRADE ALONG STREEPER STREET FOR CONTRACTOR ACCESS ONLY DURING CONSTRUCTION AND ALTERING THE EXISTING DOOR INTO THE NEW ELECTRIC ROOM TO PROVIDE PANIC HARDWARE COMPLIANT WITH NEC REQUIREMENTS AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-01733) RELOCATION OF THE EXISTING TRANSFORMER LOCATED IN THE COURTYARD ON THE EAST SIDE OF THE EXISTING BUILDING, WORK IS BEING UNDERTAKEN PRIOR TO THE COMMENCEMENT OF CONSTRUCTION FOR THE FUTURE ADDITION TO THE BUILDING (WORK WILL ALLOW FOR THE SCHOOL TO REMAIN OPEN DURING THE SCHOOL YEAR) THE EXISTING TRANSFORMER ON THE EAST SIDE OF THE BUILDING WILL BE REMOVED ONCE THE NEW TRANSFORMER IS ENERGIZED, THE NEW TRANSFORMER AND SERVICE WILL BE LOCATED ON THE SOUTHWEST CORNER OF THE SITE ALONG FLEET STREET. THE EXTERIOR WORK IS LIMITED TO WORK REQUIRED TO RELOCATE THE TRANSFORMER ONLY. INSIDE THE BUILDING, A NEW ELECTRIC ROOM WILL BE CREATED WITH CONSTRUCTION LIMITED TO FURRING THE EXISTING WALL FOR THE ELECTRIC PANELS AND EQUIPMENT, ADDING A DOOR AT GRADE ALONG STREEPER STREET FOR CONTRACTOR ACCESS ONLY DURING CONSTRUCTION AND ALTERING THE EXISTING DOOR INTO THE NEW ELECTRIC ROOM TO PROVIDE PANIC HARDWARE COMPLIANT WITH NEC REQUIREMENTS AS PER PLANS AS PER CODE. | — | Jul 25, 2022 |
| COM2022 | RELOCATION OF THE EXISTING TRANSFORMER LOCATED IN THE COURTYARD ON THE EAST SIDE OF THE EXISTING BUILDING, WORK IS BEING UNDERTAKEN PRIOR TO THE COMMENCEMENT OF CONSTRUCTION FOR THE FUTURE ADDITION TO THE BUILDING (WORK WILL ALLOW FOR THE SCHOOL TO REMAIN OPEN DURING THE SCHOOL YEAR) THE EXISTING TRANSFORMER ON THE EAST SIDE OF THE BUILDING WILL BE REMOVED ONCE THE NEW TRANSFORMER IS ENERGIZED, THE NEW TRANSFORMER AND SERVICE WILL BE LOCATED ON THE SOUTHWEST CORNER OF THE SITE ALONG FLEET STREET. THE EXTERIOR WORK IS LIMITED TO WORK REQUIRED TO RELOCATE THE TRANSFORMER ONLY. INSIDE THE BUILDING, A NEW ELECTRIC ROOM WILL BE CREATED WITH CONSTRUCTION LIMITED TO FURRING THE EXISTING WALL FOR THE ELECTRIC PANELS AND EQUIPMENT, ADDING A DOOR AT GRADE ALONG STREEPER STREET FOR CONTRACTOR ACCESS ONLY DURING CONSTRUCTION AND ALTERING THE EXISTING DOOR INTO THE NEW ELECTRIC ROOM TO PROVIDE PANIC HARDWARE COMPLIANT WITH NEC REQUIREMENTS AS PER PLANS AS PER CODE. | $480,000 | Jul 25, 2022 |
| BMZ2022 | construct a new building on the property for use as a gymnasium and playground, which will be relocated to the building's rooftop, which requires a variance to permit lot coverage greater than 70%, per the attached plans. | — | Mar 21, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-CCE Building Permit ComplaintJul 9, 2026 · 114 m · 617 S LINWOOD AVE
- violation: HCD-CCE Building Permit ComplaintJul 9, 2026 · 118 m · 619 S LINWOOD AVE
- violation: HCD-CCE Building Permit ComplaintJul 8, 2026 · 111 m · 615 S LINWOOD AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 83 m · 607 S STREEPER ST
- violation: SW-Dirty AlleyJul 5, 2026 · 101 m · 601 S KENWOOD AVE
- violation: PM 305.1Jul 2, 2026 · 93 m · 606 S STREEPER ST
- violation: 13 5-4Jul 2, 2026 · 112 m · 623 S STREEPER ST
- violation: SW-Dirty AlleyJun 30, 2026 · 142 m · 500 S POTOMAC ST
- violation: HCD-Sanitation PropertyJun 29, 2026 · 86 m · 531 S KENWOOD AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 91 m · 606 S STREEPER ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.