Baltimore City · 21224
257 S ELLWOOD AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $370,400
- Land use
- Residential (R)
- Year built
- 1906
- Last sale
- Jan 14, 2021
Assessment
| Owner | SHARMA, SIDDHARTH V |
|---|---|
| Land use | Residential (R) |
| Total assessment | $370,400 (cycle 2026) |
| Last sale | Jan 14, 2021 — $385,000 |
| Year built | 1906 |
| Zoning | R-8 |
| Vacant | — |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2019 | single family dwelling | — | Nov 22, 2019 |
| COM2019 | install (20) # branch circuits/feeders , (1) 200 amps electric service up to 600v (#amps) as per code. | $5,000 | Aug 13, 2019 |
| COM2019 | install (1) 30000 btu air-con system, condensor, (1) # new distribution system (1-2 family), (1) 72000 btu fuel-burning equip(furnace) as per code. | $6,000 | Jul 25, 2019 |
| COM2019 | interior work: category 2 demo of bearing & non-bearing stud walls, stairs, plaster, trim, insulation, flooring /roofing & debris. new floor joists as per plans. new interior work: framing (1,815 sf) w/ stud walls, new basement staircase (7-3/4"riser,11"tread, 3'wide) w/ hangers, drywall, trim, insulation (r-20 walls, r-49 roof). doors (15). new exterior work: new 2nd floor rear deck (14'-2"x10'-6") w/ staircase (tread: 9"min, rise: 8 1/4"max, and width: 36"min) to new rooftop deck. (14'-2"x16'). new exterior doors (4), windows (8). demo/repour existing rear concrete slab (14'-2"x25'-.5"')(355 sf) 3" gravel, 4" slab. as per plans, as per code. | $75,000 | Jul 10, 2019 |
| COM2019 | install (11) # plumbing fixtures, (1) # electric water heater, (1) # water service pipe (reconstruction), (1) # sanitary connection (reconstruction0, (1) 25000 btu fuel-burning equip, (1) 72000 btu fuel-burning equip as per code. | $2,000 | Jul 5, 2019 |
| COM2019 | underpinning of foundation walls as per attached engineer's plans and certification. the engineer certification is required at completion of work and with a report of the exact dates of periodic inspections during the construction. existing basement height = 6'-0", proposed height = 8'-0". new 4" concrete slab on 4" gravel. all work will be done according to baltimore city code and per submitted drawings. | $5,000 | Jun 14, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 9, 2026 · 124 m · 263 S EAST AVE
- violation: HCD-Sanitation PropertyJul 8, 2026 · 123 m · 200 S ROBINSON ST
- violation: SW-HGWJul 7, 2026 · 133 m · 320 S EAST AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 111 m · 206 S ROBINSON ST
- violation: HCD-CCE Building Permit ComplaintJun 21, 2026 · 103 m · 300 S EAST AVE
- permit: BRCMJun 14, 2026 · 138 m · 301 S EAST AVE
- violation: SW-HGWJun 8, 2026 · 133 m · 320 S EAST AVE
- violation: HCD-Sanitation PropertyMay 28, 2026 · 124 m
- permit: BRCMMay 28, 2026 · 127 m · 245 S EAST AVE
- violation: HCD-Vacant BuildingMay 21, 2026 · 131 m · 231 S EAST AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.