Baltimore City · 21202

716 PRESIDENT ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$30,867,400
Land use
Commercial Condominium (CC)
Year built
2009
Last sale
Nov 30, 2009

This owner holds 27 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerHARBOR EAST PARCEL D -
Land useCommercial Condominium (CC)
Total assessment$30,867,400 (cycle 2026)
Last saleNov 30, 2009
Year built2009
ZoningC-5DC
Vacant

Permits

9
TypeDescriptionCostIssued
BCCMINSTALL FIRE ALARM DEVICES ON THE 14TH FLOOR AS PER PLANS AS PER CODE.$800,000May 12, 2026
BCCM******* 23rd Floor **** SCOPE OF WORK: ----- CAT I DEMO -------- DEMOLITION OF THE NONSTRUCTURAL INTERTIOR PARTITIONS, CEILING AND FINISHES OF THE PROJECT IN PREPARATION FOR NEW CONSTRUCTION TO BE PERMITTED SEPARATELY. AS PER PLAN AND AS PER CODE.$80,000Apr 28, 2026
BCCMSCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- 14TH FLR - MINOR DEMOLITION AND INTERIOR ALTERATION TO NON-LOAD-BEARING PARTITIONS IN EXISTING UNOCCUPIED SPACE (NO STRUCTURAL MODIFICATIONS REQUIRED) AS PER PLANS AS PER CODE.$1,300,000Apr 17, 2026
BCCM********** AN INTERIOR RENOVATION OF SELECT EXISTING SPACES, INCLUDING MEETING ROOMS, BALLROOMS, AND BOARDROOMS ON THE 2ND AND 4TH FLOORS OF THE FOUR SEASONS BALTIMORE HOTEL. THE EXISTING LIGHT FIXTURE DIMMING SYSTEM CONTROL COMPONENTS SHALL BE REPLACED WITH NEW. EXISTING 2ND AND 4TH FLOOR SELECT SPACES ARE TO BE RENOVATED TO INCLUDE THE FOLLOWING ************ SCOPE OF WORK: ---------- INTERIOR ALTERATIONS LEVEL I ----------- - NEW FLOORING, WALL FINISHES, AND CEILING FINISHES THROUGHOUT. - REPLACEMENT OF STONE AND WOOD THRESHOLDS WITH NEW STONE. - REPLACEMENT OF OPERABLE WALL FINISHES, AND REFINISHING OF EXISTING MILLWORK. - AN EXISTING 2ND FLOOR COAT CLOSET WILL BE REDUCED IN SIZE TO OPEN UP PRE-FUNCTION SPACE AROUND IT. - AN EXISTING 4TH FLOOR BUSINESS CENTER AND STORAGE CLOSET WILL BECOME A MEETING ROOM. --------- TRADES -------- - REPLACEMENT OF ALL FLOOR OUTLET BOXES IN MEETING ROOMS AND BALLROOM SPACES. - REPLACEMENT OF DECORATIIE LIGHTING IN CEILING AND WALLS ONE-FOR-ONE WITH NEW FIXTURES. AS PER PLANS AND AS PER CODE.$2,800,000Feb 3, 2026
BCCMScope of work is limited to small areas within the existing residential elevator lobbies on floors 19 through 27 of Four Seasons Residence. New 4" sanitary bypass drains from the Toilet Rooms located on the 29th floor and extend down to the 18th floor sanitary main. Also, new 4" sanitary bypass drain from the Kitchen located on the 29th floor and extend down to the 18th floor sanitary main. Provide new metal stud and gypsum board partition walls at each floor 19 through 27 to conceal vertical sanitary piping in corners where exposed to view. Relocate power, data, fire alarm and security cameras as required to accommodate new partitions.$75,000Dec 30, 2025
BTEMPHoliday season, 4th floor pool deck holiday, weather protecting cabana dining (with storage shed), by reservations only, event. Reservations for dining will available Wednesdays through Sundays, every week from December 3, 2025 - March 15th, 2026, and annually from the 1st Wednesday in December through the 3rd Sunday in March; from 5pm - 10pm daily. The number of temporary structures will be a maximum of 6 structures 8ft x 8ft, seating for 4 each (24 total) and 2 structures 12ft x 10ft, seating for 8 each (16 total). As per plans and as per code.$5,000Dec 3, 2025
BCCMInterior renovation of two guestrooms and corridor in the Four Seasons Hotel. The scope of work includes new flooring finishes, wall covering finishes, ceilings finishes, new furniture, and new hardwired lighting fixtures. The guest bathrooms are to receive new shower floor tile, new plumbing fixture brightwork, new water closet, and new accessories. The fixture count is to remain the same – there is no new plumbing load being added.$45,000Aug 20, 2025
TMP2020outdoor seating temporary use permit. permit allows for additional outdoor seating to promote social distancing in compliance with cdc guidelines. seating allowed as specified in the approved drawing. no live or amplified music, open flames or other heating devices in outdoor seating, or any exterior food and drink stations not currently existing under previously approved plans. permit expires june 30, 2021. ******* location:sidewalk, area(ft):1324, table count:15, chair count:60 as per code.$0Dec 4, 2020
COM2020INSTALL (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE.*****APPROVED WITH CONDITIONS PER PLANNING ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION OF 7.3 T NAVD 88, AND THE FLOOD PROTECTION ELEVATION (FPE) FOR THE AREA IS 9.4 FT NAVD 8. ELECTRICAL, MECHANICAL AND PLUMBING COMPONENTS MUST BE INSTALLED ABOVE THE FPE (1.1 FT ABOVE THE FIRST FLOOR ELEVATION) OR BE MADE WATER TIGHT ACCORDING TO ASCE 24.$1,200Mar 17, 2020

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.