Baltimore City · 21231
600 S BOND ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $5,591,000
- Land use
- Industrial (I)
- Year built
- 1920
- Last sale
- Jan 1, 1797
Assessment
| Owner | H & S PROPERTIES INC |
|---|---|
| Land use | Industrial (I) |
| Total assessment | $5,591,000 (cycle 2026) |
| Last sale | Jan 1, 1797 |
| Year built | 1920 |
| Zoning | I-1 |
| Vacant | — |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2020 | ADD 66 SPRINKLER HEADS AS PER PLANS AS PER CODE. | $13,350 | Apr 12, 2021 |
| COM2021 | AMEND PERMIT: ADD HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2020-00511:INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2020-00511) INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Jan 5, 2021 |
| COM2020 | AMEND PERMIT: ADD PLUMBER AND GAS CONTRACTOR . (ORIGINAL PERMIT:COM2020-00511:INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2020-00511) INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Oct 6, 2020 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2020-00511:INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS.) Original Permit Description:(COM2020-00511) INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | — | Oct 6, 2020 |
| COM2020 | INTERIOR ALTERATION TO AN EXISTING WAREHOUSE FACILITY. NEW ENTRY STAIR AND RAMP AND MODIFIED EXTERIOR WALLS. STRUCTURAL WORK INCLUDES PARTIAL DEMOLITION OF BEARING WALLS AND 2ND FLOOR FRAMING ELEMENTS. EXISTING COLUMNS SHALL REMAIN AND SHORING SHALL BE BY CONTRACTOR AND SHALL BE IN ACCORDANCE WITH THE STRUCTURAL “NOTES” ON SHEET 65.01. PROPOSED STRUCTURAL WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING: SLAB ON GRADE AT 1ST FLOOR, POURED CONCRETE ON METAL DECK AT 2ND FLOOR, TUBE STEEL COLUMNS, METAL JOISTS AND BEAMS, FRAMING AT EXISTING ROOF MEMBERS, LINTELS, AND CMU FOUNDATIONS AND CONCRETE FOOTINGS AS PER PLANS AS PER CODE. SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. | $1,400,000 | Oct 2, 2020 |
| COM2019 | scope of work: interior alterations to include: add and relocate sprinkler heads as necessary utilizing existing overhead sprinkler system to accommodate new walls and ceiling layouts. add (2) relocate (10) as per code. | $8,395 | Oct 17, 2019 |
| COM2019 | amend permit: add hvac contractor . (original permit:com2019-01800:interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. ) original permit description:(com2019-01800) interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. | — | Aug 27, 2019 |
| COM2019 | amend permit: add electrical contractor . (original permit:com2019-01800:interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. ) original permit description:(com2019-01800) interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. | — | Aug 19, 2019 |
| COM2019 | amend permit: add plumbing contractor . (original permit:com2019-01800:interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. ) | — | Aug 15, 2019 |
| COM2019 | amend permit: add (prime) contractor . (original permit:com2019-01800:interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. ) original permit description:(com2019-01800) interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. | — | Aug 14, 2019 |
| COM2019 | interior alterations to include demolition of 981 sqft and renovation of existing space including proposed offices, conference/ training room and hc toilet as per plans/as per code. | $150,000 | Aug 12, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 9, 2026 · 103 m · 622 S BETHEL ST
- violation: SW-HGWJun 30, 2026 · 148 m · 1421 FLEET ST
- violation: HCD-Sanitation PropertyJun 17, 2026 · 113 m
- permit: BUSEJun 17, 2026 · 147 m · 1630 ALICEANNA ST
- violation: HCD-Vacant BuildingJun 8, 2026 · 102 m · 520 S DALLAS ST
- violation: HCD-Maintenance StructureJun 5, 2026 · 129 m
- permit: BUSEMay 29, 2026 · 91 m · 701 S BOND ST
- permit: BUSEMay 27, 2026 · 142 m · 606 S BROADWAY
- violation: HCD-Illegal DumpingMay 19, 2026 · 141 m · 522 S BETHEL ST
- permit: BRCMApr 29, 2026 · 149 m · 1530 LANCASTER ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.