Total assessment
$44,592,800
Land use
Commercial (C)
Year built
2003
Last sale
Jun 27, 1990

Assessment

OwnerPROVIDENT BANK OF
Land useCommercial (C)
Total assessment$44,592,800 (cycle 2026)
Last saleJun 27, 1990
Year built2003
ZoningC-5DC
Vacant

Permits

22
TypeDescriptionCostIssued
BCCMDISCONNECT EXISTING FIRE PUMP CONTROLLER AND 50 HP FIRE PUMP. ONCE NEW IS INSTALLED WE WILL RECONNECT. DISCONNECT EXISITING JOCKEY PUMP AND RECONNECT ONCE NEW IS INSTALLED. This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal$15,000Jul 1, 2026
BCCMBFPE will replace the existing 750gpm horizontal split case fire pump that serves the Mercy Weinberg building with a pump of like-kind. The entire scope will also include the replacement of the jockey pump and both corresponding controllers for each. ALL ELECTRICAL WORK BY OTHERS. Planning department approved with comments: All mechanical, electrical, and plumbing need to be installed above the flood protection elevation of 21.3 FT NAVD88$81,735Mar 27, 2026
COM2024THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) OF 18.4 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (2.6 FT ABOVE THE FFE). INSTALL (10) # LOW VOLTAGE, (20) # LOW VOLTAGE AS PER CODE.$39,072Dec 2, 2024
COM2024INSTALL FIRE ALARM SYSTEM AS PER PLANS AS PER CODE.$2,220Sep 4, 2024
COM2024INSTALL (100) # LOW VOLTAGE AS PER CODE.*NOT FIRE ALARM RELATED******** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) IS 18.4 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (2.6 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$13,000Jul 26, 2024
COM2024SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------ THIS PROJECT CONSISTS OF THE RENOVATION OF AN EXISTING SPACE TO INCLUDE A RETAIL PHARMACY. PHARMACY DOES NOT DO ANY COMPOUNDING, ETC. AS PER PLANS AND AS PER CODE.$275,000Jun 10, 2024
COM2024RELOCATING ELEVEN (11) QUICK RESPONSE SPRINKLERS TO PROVIDE THE PROPER COVERAGE IN THE NEWLY RENOVATED LINAC VAULT AS PER PLANS AS PER CODE. $12,750May 7, 2024
COM2024INSTALL (15) # LOW VOLTAGE AS PER CODE. *NOT FIRE ALARM RELATED******** AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. THE ELEVATION CERTIFICATE ON FILE LISTS A FIRST FLOOR ELEVATION (FFE) IS 18.4 FT NAVD 88 AND THE FLOOD PROTECTION ELEVATION (FPE) IS 21 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (2.6 FT ABOVE THE FFE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS.$2,625Jan 24, 2024
COM2024AMEND PERMIT: ADD PLUMBING AND MECHANICAL CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-02936: ******* INCLUDES ALTERATION OF THE BASEMENT LEVEL OF THE EXISTING WEINBERG BUILDING. RENOVATE EXISTING RADIATION ONCOLOGY TREATMENT ROOM AND ADJACENT ASSOCIATED SPACES FOR EQUIPMENT REPLACEMENT. ****** SCOPE OF WORK:------ LEVEL II INTERIOR ALTERATIONS ----- INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, LOW VOLTAGE, AND MODIFICATIONS TO STRUCTURAL SLAB. ---- EXTERIOR ALTERATIONS ----- EXTERIOR WORK INCLUDES REPLACEMENT OF EXTERIOR ROOFTOP CHILLER AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-02936) ******* INCLUDES ALTERATION OF THE BASEMENT LEVEL OF THE EXISTING WEINBERG BUILDING. RENOVATE EXISTING RADIATION ONCOLOGY TREATMENT ROOM AND ADJACENT ASSOCIATED SPACES FOR EQUIPMENT REPLACEMENT. ****** SCOPE OF WORK:------ LEVEL II INTERIOR ALTERATIONS ----- INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, LOW VOLTAGE, AND MODIFICATIONS TO STRUCTURAL SLAB. ---- EXTERIOR ALTERATIONS ----- EXTERIOR WORK INCLUDES REPLACEMENT OF EXTERIOR ROOFTOP CHILLER AS PER PLANS AS PER CODE.Jan 8, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-02936: ******* INCLUDES ALTERATION OF THE BASEMENT LEVEL OF THE EXISTING WEINBERG BUILDING. RENOVATE EXISTING RADIATION ONCOLOGY TREATMENT ROOM AND ADJACENT ASSOCIATED SPACES FOR EQUIPMENT REPLACEMENT. ****** SCOPE OF WORK:------ LEVEL II INTERIOR ALTERATIONS ----- INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, LOW VOLTAGE, AND MODIFICATIONS TO STRUCTURAL SLAB. ---- EXTERIOR ALTERATIONS ----- EXTERIOR WORK INCLUDES REPLACEMENT OF EXTERIOR ROOFTOP CHILLER AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-02936) ******* INCLUDES ALTERATION OF THE BASEMENT LEVEL OF THE EXISTING WEINBERG BUILDING. RENOVATE EXISTING RADIATION ONCOLOGY TREATMENT ROOM AND ADJACENT ASSOCIATED SPACES FOR EQUIPMENT REPLACEMENT. ****** SCOPE OF WORK:------ LEVEL II INTERIOR ALTERATIONS ----- INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, LOW VOLTAGE, AND MODIFICATIONS TO STRUCTURAL SLAB. ---- EXTERIOR ALTERATIONS ----- EXTERIOR WORK INCLUDES REPLACEMENT OF EXTERIOR ROOFTOP CHILLER AS PER PLANS AS PER CODE.Jan 5, 2024
COM2023 ******* INCLUDES ALTERATION OF THE BASEMENT LEVEL OF THE EXISTING WEINBERG BUILDING. RENOVATE EXISTING RADIATION ONCOLOGY TREATMENT ROOM AND ADJACENT ASSOCIATED SPACES FOR EQUIPMENT REPLACEMENT. ****** SCOPE OF WORK:------ LEVEL II INTERIOR ALTERATIONS ----- INTERIOR SCOPE OF WORK INCLUDES DEMOLITION AND RENOVATION OF WALLS, FINISHES, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, LOW VOLTAGE, AND MODIFICATIONS TO STRUCTURAL SLAB. ---- EXTERIOR ALTERATIONS ----- EXTERIOR WORK INCLUDES REPLACEMENT OF EXTERIOR ROOFTOP CHILLER AS PER PLANS AS PER CODE.$1,500,000Jan 4, 2024
COM2020SUPPLY AND REPLACE THE EXISTING FIRE ALARM SYSTEM PANEL ONLY. ALL INITIATING AND NOTIFICATION DEVICES ARE EXISTING TO REMAIN AS PER PLANS AS PER CODE.$10,000May 17, 2022
COM2020FACP UPGRADE AT MERCY HOSPITAL'S WEINBERG BUILDING, THE EXISTING INITIATING AND NOTIFICATION DEVICES WILL BE EXISTING TO REMAIN, ONLY THE HEAD END FACP PANEL AND TRANSPONDER PANELS WILL BE REPLACED, THE EXISTING SEQUENCE OF OPERATIONS WILL REMAIN THE SAME AS PREVIOUSLY INSTALLED, TESTED AND APPROVED AS PER PLANS AS PER CODE.$10,000Sep 30, 2020
COM2020PER PLANNING DEPT: USE STAINLESS STEEL SPRINKLER HEADS AND WATER PROOF CONDUITS FOR ANY RELATED ELECTRIC WORKINSTALL (2) # SPRINKLERS, RELOCATION ( # HEADS) AS PER CODE.$10,689Aug 31, 2020
COM2020INSTALL (13) # LOW VOLTAGE AS PER CODE.INSTALL ACCORDING TO NFPA 70 FOR WET LOCATIONS$19,450Mar 20, 2020
COM2020INSTALL (1) # NEW SPRINKLERS ( # HEADS), (2) # SPRINKLERS, RELOCATION ( # HEADS) AS PER CODE.$10,689Mar 12, 2020
COM2020AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-03555:THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. ) Original Permit Description:(COM2019-03555) THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. Feb 5, 2020
COM2020AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2019-03555:THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. ) Original Permit Description:(COM2019-03555) THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. Feb 4, 2020
COM2020AMEND PERMIT: ADD HVAC AND PLUMBER CONTRACTOR .(ORIGINAL PERMIT:COM2019-03555:THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. ) Original Permit Description:(COM2019-03555) THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. Feb 4, 2020
COM2019THIS PROJECT CONSISTS OF A 1,835 SQFT PHARMACY RENOVATION WHICH INCLUDES DEMOLITION OF SOME EXISTING WALLS AND LIGHTS, CONSTRUCTION OF NEW INTERIOR METAL-FRAMED WALLS, ELECTRICAL, MECHANICAL, PLUMBING, MILLWORK AND NEW FINISHES PER PLANS PER CODE. EPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. $350,000Feb 3, 2020
COM2019amend permit: add prime contractor . (original permit:com2019-01803:provide a new incidental use vestibule of 750 sf to control the amount of conditioned air lost through the entrance door, demolition for a new door opening and the construction of a new glass and drywall entrance vestibule with new doors to the hospital (work is intended correct the energy inefficiencies of the existing entrance to the hospital from the parking garage) as per plans as per code. separate permits are required for sprinkler, fire alarm, and detection systems’ alteration. ) original permit description:(com2019-01803) provide a new incidental use vestibule of 750 sf to control the amount of conditioned air lost through the entrance door, demolition for a new door opening and the construction of a new glass and drywall entrance vestibule with new doors to the hospital (work is intended correct the energy inefficiencies of the existing entrance to the hospital from the parking garage) as per plans as per code. separate permits are required for sprinkler, fire alarm, and detection systems’ alteration. Oct 29, 2019
COM2019provide a new incidental use vestibule of 750 sf to control the amount of conditioned air lost through the entrance door, demolition for a new door opening and the construction of a new glass and drywall entrance vestibule with new doors to the hospital (work is intended correct the energy inefficiencies of the existing entrance to the hospital from the parking garage) as per plans as per code. separate permits are required for sprinkler, fire alarm, and detection systems’ alteration. $150,000Jul 11, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.