Baltimore City · 21201
328 N HOWARD ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $665,733
- Land use
- Exempt Commercial (EC)
- Year built
- 1920
- Last sale
- Mar 20, 2017
Assessment
| Owner | GREATER BALTIMORE CENTER FOR |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $665,733 (cycle 2026) |
| Last sale | Mar 20, 2017 — $94,500 |
| Year built | 1920 |
| Zoning | C-5HS |
| Vacant | — |
Permits
8| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2020 | USE 1ST FLOOR FOR WOMAN'S HEALTH CLINIC AND COUNSELLING CENTER | — | Nov 9, 2020 |
| COM2020 | INSTALLATION OF FIRE ALARM IN A RENOVATED TENANT SPACE AS PER PLANS AS PER CODE. | $5,000 | Nov 6, 2020 |
| COM2020 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: SIGN INSTALLATION, INSTALL 1 NON-ILLUMINATED WALL SIGN - OPTIONS 328 - 26'' X 83.2'' = 15.02 SQ FT, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED DRAWING, *CUSTOMER SHOULD NOT IMPEDE PUBLIC SIDEWALK ACCESS WHEN INSTALLING THE SIGN | $2,000 | Aug 25, 2020 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2019-04188:SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE.) Original Permit Description:(COM2019-04188) SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE. | — | Jun 5, 2020 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-04188:SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE.) Original Permit Description:(COM2019-04188) SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE. | — | May 12, 2020 |
| COM2020 | AMEND PERMIT: ADD HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2019-04188:SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE.) Original Permit Description:(COM2019-04188) SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE. | — | Apr 21, 2020 |
| COM2020 | AMEND PERMIT: ADD PLUMBER CONTRACTOR.(ORIGINAL PERMIT:COM2019-04188:SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE.) Original Permit Description:(COM2019-04188) SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE. | — | Apr 21, 2020 |
| COM2019 | SCOPE OF WORK:--LEVEL 2 INTERIOR ALTERATIONS-- 1- PARTIAL BASEMENT- INTERIOR DEMO, INSTALL NEW FLOORING, STAIRS, FRAMING, ELECTRICAL AND PLUMBING. 2- GROUND FLOOR- REMOVE AND REPLACE FLOORING AND FRAMING, INSTALL FLOORING OVER UNEXCAVATED REAR PORTION, INSTALL NEW STUD AND DRYWALL PARTITIONS AND MASONRY WALLS AND DOORS, REPLACE STAIRS TO 2ND FLOOR IN REAR, RELOCATE REAR EXIT, ADD NEW DOOR AND FRAME, INSTALL NEW ELECTRIC, PLUMBING, NEW CEILING AND LED LIGHTING, NEW FLOORING AND BASE THROUGHOUT, REPLACE STOREFRONT AND STEEL SECURITY CURTAIN WITH NEW BULLET-RESISTANT GLASS AND FRAMES AND SECURITY CURTAIN. 3- SECOND FLOOR- ADD 2 NEW HVAC AIR HANDLERS, REPLACE EXISTING REAR WINDOW WITH NEW SERVICE DOOR TO ROOF FOR ACCESS TO NEW ROOF TOP CONDENSING UNITS. 4- HOWARD STREET FAÇADE- REPLACE EXTERIOR 2ND FLOOR LOUVERS WITH NEW INSULATED GLASS WINDOWS IN MATCHING PAINT WOOD FRAMES AND ADD NEW PAINTED CORNICE TRIM ABOVE NEW STOREFRONT AND UPPER LEVEL BAY AS PER PLANS AS PER CODE. | $400,000 | Jan 21, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BTEMPJun 30, 2026 · 84 m · 401 N HOWARD ST
- violation: SW-Dirty AlleyJun 27, 2026 · 119 m · 211 W MULBERRY ST
- violation: SW-Dirty AlleyJun 22, 2026 · 80 m
- permit: BCCMJun 16, 2026 · 134 m · 300 N EUTAW ST
- violation: HCD-CCE Building Permit ComplaintJun 12, 2026 · 45 m · 400 N HOWARD ST
- violation: HCD-CCE Building Permit ComplaintJun 12, 2026 · 46 m
- permit: BCCMJun 1, 2026 · 87 m · 301 N HOWARD ST
- permit: BTEMPMay 8, 2026 · 84 m · 401 N HOWARD ST
- permit: BCCMMay 6, 2026 · 73 m · 410 N HOWARD ST
- violation: HCD-Illegal DumpingMay 6, 2026 · 94 m · 219 W MULBERRY ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.