Baltimore City · 21201
216 W SARATOGA ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $424,067
- Land use
- Commercial (C)
- Year built
- 1900
- Last sale
- Feb 1, 1988
Assessment
| Owner | MARYLAND ART PLACE, INC. |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $424,067 (cycle 2026) |
| Last sale | Feb 1, 1988 — $350,000 |
| Year built | 1900 |
| Zoning | C-5HS |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2021-03183:SCOPE OF WORK:---INTERIOR ALTERATIONS----GENERAL SITE REQUIREMENTS: DISCONNECT ALL EXISTING BRACING SUPPORTING WORK. IN-PLACE TO REMAIN, INCLUDING, BUT NOT LIMITED TO EXISTING ELECTRICAL LINES, OUTLETS, ELECTRICAL EQUIPMENT, AND EXISTING SPRINKLER LINES, PROVIDE TEMPORARY SUPPORT OF THESE ITEMS AS NECESSARY FOR BRACING AND MOUNTING FROM NEW WORK, SHORE EXISTING STRUCTURAL MEMBERS BEING DISCONNECTED, BUT TO REMAIN. REF. S1. PROVIDE TEMPORARY PROTECTION OF EXISTING PLUMBING FIXTURES, HOT WATER HEATER, CONDENSER UNIT, SPRINKLER LINES, SPRINKLER MAIN, AND ELECTRICAL WIRING, ----PAVING---PROVIDE BARRICADE/FENCING/SIGNAGE FOR SIDEWALK CLOSURE AND PEDESTRIAN REROUTING, PROVIDE TEMPORARY COVERING OF DEMOLISHED SIDEWALK TO PROVIDE A SAFE JOBSITE AND SECURE BUILDING, PROVIDE TEMPORARY PROTECTION OF EXISTING STOREFRONT (NOTE TO G.C.S: (NEW GLASS STOREFRONT SYSTEM IS TO BE INSTALLED AT THE GALLERY AT A LATER DATE BY OTHERS AND NOT PART OF THIS SCOPE) ENTRY DOOR AND SIDELIGHTS WILL REMAIN, DEMOLITION: REMOVE AND DISPOSE OF ALL WORK ASSOCIATED WITH DEMOLITION ON SHEET A1. REMOVE EXISTING CONCRETE SIDEWALK, REMOVE EXISTING STEEL BEAMS INDICATED ON SHEET A1 AND EXISTING PAN DECK, CUT AND REMOVE EXISTING GROUT/MASONRY FOR NEW BEAM POCKETS, CONSTRUCTION (NEW SIDEWALK APPROX. 25’ X 12’) INSTALL (6) NEW STEEL BEAMS, PLATES, AND ANGLES, INSTALL NEW L4 X 4 X 3/8 STEEL SUPPORT ANGLES AT SOUTH WALL, INSTALL NEW 22 GA GALVANIZED METAL PAN DECK, INSTALL NEW WATERSTOP AT FULL PERIMETER OF NEW SLAB, INSTALL NEW 5” CONCRETE SLAB W/ REINFORCING REBAR, INSTALL ½” WIDE JOINT SEALANT AT FULL PERIMETER OF NEW SLAB, APPLY SEALER TO NEW CONCRETE SLAB AS SPECIFIED, INSTALL NEW SADDLES AND HANGERS FOR EXISTING SPRINKLER AND ELECTRICAL WORK PREVIOUSLY REMOVED FOR NEW WORK AS PER PLANS AS PER CODE.) Original Permit Description:(COM2021-03183) SCOPE OF WORK:---INTERIOR ALTERATIONS----GENERAL SITE REQUIREMENTS: DISCONNECT ALL EXISTING BRACING SUPPORTING WORK. IN-PLACE TO REMAIN, INCLUDING, BUT NOT LIMITED TO EXISTING ELECTRICAL LINES, OUTLETS, ELECTRICAL EQUIPMENT, AND EXISTING SPRINKLER LINES, PROVIDE TEMPORARY SUPPORT OF THESE ITEMS AS NECESSARY FOR BRACING AND MOUNTING FROM NEW WORK, SHORE EXISTING STRUCTURAL MEMBERS BEING DISCONNECTED, BUT TO REMAIN. REF. S1. PROVIDE TEMPORARY PROTECTION OF EXISTING PLUMBING FIXTURES, HOT WATER HEATER, CONDENSER UNIT, SPRINKLER LINES, SPRINKLER MAIN, AND ELECTRICAL WIRING, ----PAVING---PROVIDE BARRICADE/FENCING/SIGNAGE FOR SIDEWALK CLOSURE AND PEDESTRIAN REROUTING, PROVIDE TEMPORARY COVERING OF DEMOLISHED SIDEWALK TO PROVIDE A SAFE JOBSITE AND SECURE BUILDING, PROVIDE TEMPORARY PROTECTION OF EXISTING STOREFRONT (NOTE TO G.C.S: (NEW GLASS STOREFRONT SYSTEM IS TO BE INSTALLED AT THE GALLERY AT A LATER DATE BY OTHERS AND NOT PART OF THIS SCOPE) ENTRY DOOR AND SIDELIGHTS WILL REMAIN, DEMOLITION: REMOVE AND DISPOSE OF ALL WORK ASSOCIATED WITH DEMOLITION ON SHEET A1. REMOVE EXISTING CONCRETE SIDEWALK, REMOVE EXISTING STEEL BEAMS INDICATED ON SHEET A1 AND EXISTING PAN DECK, CUT AND REMOVE EXISTING GROUT/MASONRY FOR NEW BEAM POCKETS, CONSTRUCTION (NEW SIDEWALK APPROX. 25’ X 12’) INSTALL (6) NEW STEEL BEAMS, PLATES, AND ANGLES, INSTALL NEW L4 X 4 X 3/8 STEEL SUPPORT ANGLES AT SOUTH WALL, INSTALL NEW 22 GA GALVANIZED METAL PAN DECK, INSTALL NEW WATERSTOP AT FULL PERIMETER OF NEW SLAB, INSTALL NEW 5” CONCRETE SLAB W/ REINFORCING REBAR, INSTALL ½” WIDE JOINT SEALANT AT FULL PERIMETER OF NEW SLAB, APPLY SEALER TO NEW CONCRETE SLAB AS SPECIFIED, INSTALL NEW SADDLES AND HANGERS FOR EXISTING SPRINKLER AND ELECTRICAL WORK PREVIOUSLY REMOVED FOR NEW WORK AS PER PLANS AS PER CODE. | — | Apr 4, 2023 |
| COM2021 | SCOPE OF WORK:---INTERIOR ALTERATIONS----GENERAL SITE REQUIREMENTS: DISCONNECT ALL EXISTING BRACING SUPPORTING WORK. IN-PLACE TO REMAIN, INCLUDING, BUT NOT LIMITED TO EXISTING ELECTRICAL LINES, OUTLETS, ELECTRICAL EQUIPMENT, AND EXISTING SPRINKLER LINES, PROVIDE TEMPORARY SUPPORT OF THESE ITEMS AS NECESSARY FOR BRACING AND MOUNTING FROM NEW WORK, SHORE EXISTING STRUCTURAL MEMBERS BEING DISCONNECTED, BUT TO REMAIN. REF. S1. PROVIDE TEMPORARY PROTECTION OF EXISTING PLUMBING FIXTURES, HOT WATER HEATER, CONDENSER UNIT, SPRINKLER LINES, SPRINKLER MAIN, AND ELECTRICAL WIRING, ----PAVING---PROVIDE BARRICADE/FENCING/SIGNAGE FOR SIDEWALK CLOSURE AND PEDESTRIAN REROUTING, PROVIDE TEMPORARY COVERING OF DEMOLISHED SIDEWALK TO PROVIDE A SAFE JOBSITE AND SECURE BUILDING, PROVIDE TEMPORARY PROTECTION OF EXISTING STOREFRONT (NOTE TO G.C.S: (NEW GLASS STOREFRONT SYSTEM IS TO BE INSTALLED AT THE GALLERY AT A LATER DATE BY OTHERS AND NOT PART OF THIS SCOPE) ENTRY DOOR AND SIDELIGHTS WILL REMAIN, DEMOLITION: REMOVE AND DISPOSE OF ALL WORK ASSOCIATED WITH DEMOLITION ON SHEET A1. REMOVE EXISTING CONCRETE SIDEWALK, REMOVE EXISTING STEEL BEAMS INDICATED ON SHEET A1 AND EXISTING PAN DECK, CUT AND REMOVE EXISTING GROUT/MASONRY FOR NEW BEAM POCKETS, CONSTRUCTION (NEW SIDEWALK APPROX. 25’ X 12’) INSTALL (6) NEW STEEL BEAMS, PLATES, AND ANGLES, INSTALL NEW L4 X 4 X 3/8 STEEL SUPPORT ANGLES AT SOUTH WALL, INSTALL NEW 22 GA GALVANIZED METAL PAN DECK, INSTALL NEW WATERSTOP AT FULL PERIMETER OF NEW SLAB, INSTALL NEW 5” CONCRETE SLAB W/ REINFORCING REBAR, INSTALL ½” WIDE JOINT SEALANT AT FULL PERIMETER OF NEW SLAB, APPLY SEALER TO NEW CONCRETE SLAB AS SPECIFIED, INSTALL NEW SADDLES AND HANGERS FOR EXISTING SPRINKLER AND ELECTRICAL WORK PREVIOUSLY REMOVED FOR NEW WORK AS PER PLANS AS PER CODE. | $30,000 | Aug 10, 2022 |
| TMP2019 | music performance date of event 6/27/2019 to 6/28/2019, time : 7:00pm to 1:00am, area:1000(sf). indoor event liquor, beer or wine will be served. | — | Jun 27, 2019 |
| TMP2019 | maryland art place will host an art show and event. date of event 4/5/2019 time : 6pm to 12am, area:1500(sf). indoor event liquor, beer or wine will be served. fund will be raised. short term event. | — | Mar 21, 2019 |
| TMP2019 | concert-bmore beat club presented by maryland art place date of event 3/8/2019 to 3/8/2019, time : 8:00 pm to 12:00 am, area:1000(sf). indoor event liquor, beer or wine will be served. funds raised. | — | Mar 8, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BUSEJul 10, 2026 · 133 m · 111 W MULBERRY ST
- permit: BTEMPJun 30, 2026 · 115 m · 401 N HOWARD ST
- violation: SW-Dirty AlleyJun 27, 2026 · 79 m · 211 W MULBERRY ST
- violation: SW-HGWJun 25, 2026 · 43 m · 215 W SARATOGA ST
- violation: HCD-Sanitation PropertyJun 25, 2026 · 107 m
- permit: BDEMJun 22, 2026 · 86 m · 202 CLAY ST
- permit: BUSEJun 17, 2026 · 92 m · 235 PARK AVE
- permit: BCCMJun 17, 2026 · 109 m · 225 PARK AVE
- violation: HCD-Sanitation PropertyJun 17, 2026 · 120 m
- permit: BUSEJun 15, 2026 · 109 m · 225 PARK AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.