Baltimore City · 21201

22 S GREENE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$730,858,367
Land use
Exempt Commercial (EC)
Year built
Last sale
Apr 3, 2009

This owner holds 6 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerUNIVERSITY OF MARYLAND MEDICAL
Land useExempt Commercial (EC)
Total assessment$730,858,367 (cycle 2026)
Last saleApr 3, 2009
Year built
ZoningC-5DC
Vacant

Permits

showing 50 of 307
TypeDescriptionCostIssued
BCCMSCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS (EQUIPMENT INSTALLATION) --------- - RENOVATION AND RECONFIGURATION OF AN EXISTING LAB AND ITS ASSOCIATED SUPPORT SPACES, SERVING THE HOSPITAL, AND - INCLUSION OF AN AUTOMATED PROCESSING LINE. AS PER PLANS AND AS PER CODE.$2,731,350Jul 6, 2026
BCCMInstallation of public safety DAS system as per plans as per code.$0Jun 30, 2026
BCCMInstallation of public safety DAS system as per plans as per code.$0Jun 24, 2026
BCCM***** THE EXISTING ADULT EMERGENCY DEPARTMENT ON THE GROUND FLOOR OF THE WEINBERGER BUILDING WILL UNDERGO A RENOVATION TO CONSTRUCT A NEW EXAM ROOM AND WAITING AREA. THE WORK WILL INCLUDE: ******** SCOPE OF WORK: ---- LEVEL II INTERIOR ALTERATIONS ----- - SELECTIVE DEMOLITION OF EXISTING WALLS AND CEILINGS. ----- TRADES ----- - MODIFICATIONS TO EXISTING MEP SYSTEM TO SUPPORT THE NEW FLOOR PLAN LAYOUT IS INCLUDED. AS PER PLANS AND AS PER CODE. AMEND PERMIT TO LIST ALL LICENSE PROFESSIONALS BEFORE ANY WORK CAN BEGIN. ***** SEPARATE PERMIT REQUIRED FOR SPRINKLER *****$350,000Jun 20, 2026
BCCMREPLACE 28 SPRINKLER HEADS ONE FOR ONE, ADD ONE SPRINKLER HEAD AND RLOCATE 3$20,345Jun 18, 2026
BCCMReplacement of existing interior generator. As per plans and as per code.$5,830,000Jun 18, 2026
BCCMModify existing sprinkler system, D-wing$20,000Jun 2, 2026
BCCM****** Amend approved / issued primary Permit COM2022-02411 to ****** SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS --------- - relocate proposed Fire Pump Room from the initially proposed 2nd floor location to the newly designed 3rd floor location, shown in currently submitted files for review (shown in amendment permit #COM#2024-01746 plans, due to Baltimore City Fire Marshall field input) ; - reverting 2nd floor are back to storage as originally approved in permit COM2022-02411. AS PER PLANS AND AS PER CODE.$250,000Jun 1, 2026
BCCMInstallation Of five smoke detectors, one pull station & 10 strobes. As per code.$60,000May 29, 2026
COM20245TH FLOOR NORTH HOSPITAL ROOM N5E. PROVIDING THREE TEMPORARY HEAT DETECTORS, TWO STROBE DEVICES, TWO SPEAKER/STROBE DEVICES WITH IAM RELAYS IN EXISTING FIRE ALARM PANEL AS PER PLANS AS PER CODE.May 29, 2026
BCCMBFPE will replace existing quick response pendent sprinklers with Tyco TY3531 concealed pendent sprinklers within two restroom areas. No existing sprinkler piping will be modified as part of this work. Bathroom WL1302, approximately 485 sq. ft., includes six sprinkler head replacements, and Bathroom WL1303, approximately 417 sq. ft., also includes six sprinkler head replacements. EXISTING SPRINKLER SYSTEM ADD AND RELOCATE 3RD PARTY REVIEW.$5,720May 1, 2026
BCCMMODIFY EXISTING SPRINKLER FOR TENANT WORK.$19,800Apr 24, 2026
BUSEThe partial occupancy permit for stocking and activation commencement for Levels, 4, 5, 6, 7, 8, 9 & 14 (split level penthouse) along with a portion of Level 1 lobby to access the stairwells and elevators. Occupancy will be EXCLUDED from levels portion of 1 and all 2, 3, 10-13 as construction will be ongoing.Apr 20, 2026
BCCMSCOPE OF WORK: --------- LEVEL II INTERIOR ALTERATIONS ------- - Renovations of 10th and 11th floors in existing hospital building and - fit out of 10th and 11th floors in newly constructed patient unit tower, in existing hospital. AS PER PLANS AND AS PER CODE.$32,000,000Apr 10, 2026
BCCMBFPE WILL ADD AND RELOCATE SPRINKLER PROTECTION TO MATCH NEW WALL AND CEILIG LAYOUT.$5,995Apr 9, 2026
BCCMPLEASE ADD YOUR LICENSED GC AND YOUR LICENSED ELECTRICAL CONTRACTORS BEFORE ANY WORK CAN BEGIN. Install (3) building-mounted signs: Sign A) "Team Member Entrance" illuminated 11" x 51" = 3.90 SF, Sign C3) "The Roslyn and Leonard Stoler Center For Advanced Medicine" Illuminated 22" x 58.16' = 106.62 SF, Sign C5) "North Entrance" non-illuminated 8" x 6'-4 3/4"= 2.94 SF. AS PER PLANS AS PER CODE.$6,000Apr 8, 2026
BCCM***** Renovation/upgrade of existing patient services kitchen consisting of***** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS (EQUIPMENT UPGRADE) ------ - existing and relocated food service equipment, new electrical and plumbing utilities, updated HVAC, and new/relocated exhaust hoods. AS PER PLANS AND AS PER CODE$1,035,076Apr 6, 2026
COM2024 ****** AMEND PERMIT COM2022-02411 PLANS 2022-2009 ISSUED 11/20/23 ****** SCOPE OF WORK: ------- GRADING ------ TO INCLUDE THE RELOCATION OF THE PROPOSED FIRE HYDRANT FROM ITS LOCATION ON GREENE STREET TO BALTIMORE STREET ------ ADDITION ----- CONSTRUCTION OF AN ADDITIONAL 5 STORIES ON TOP OF PREVIOUSLY APPROVED 10 STORY ADDITION. (LEVEL 14 IS DOUBLE HEIGHT MECHANICAL PENTHOUSE WITH MEZZANINE LEVEL 15) WITH JUST A SERVICE ELEVATOR MACHINE ROOM ON LEVEL 16 (ROOF OF ELEVATOR OVERRUN/MACHINE ROOM IS LEVEL 17); THE EXTERIOR SKIN IS TO BE EXTENDED TO ADAPT TO THE ADDED FLOORS; ------- INTERIOR ALTERATIONS ------ STAIR AND ELEVATOR CORES ARE ALSO MODIFIED TO CATER TO THE CONNECTIONS WITH THE EXISTING 14 STORY NORTH HOSPITAL; ADDITIONAL ROOF LIGHTS ARE ADDED TO ADDRESS THE PROXIMITY TO THE EXISTING ROOF HELIPAD ON THE EXISTING HOSPITAL AS PER PLANS AS PER CODE. Mar 13, 2026
BCCMLow Voltage Security Access Control as per code.$6,119Mar 11, 2026
BCCMCabling for Commercial DAS installation for floors 10-13 as per code.$0Mar 3, 2026
BCCMCabling for Commercial DAS installation floors 2-9 as per code.$0Mar 3, 2026
BCCMRevisions to issued fire alarm Permit #COM2024-01304, Plan #2024-1147$86,000Feb 27, 2026
BCCMCabling for new cancer center, install 2,132 data locations. as per code.$0Feb 18, 2026
BCCM3RD PARTY FIRE SPRINKLER REVIEW - Modify existing system to provide coverage for new layout. Add/relocate.$12,460Feb 17, 2026
BCCMFire alarm - COM2022-02411 - addition - 10 story, 239,723 SF cancer center, an addition to the University of Maryland Medical Center with some renovations to existing building. Via pending Permit Amendment COM2024-01746, construction of additional 5 stories on top of previously approved 10 story addition$33,000,000Feb 13, 2026
BCCM18235 - UMMC S12 D-Wing Renovation. Installing data cabling for office renovation.$0Feb 11, 2026
BCCMProvide and install ten (10) Cat 6 plenum flush mount 2-data locations. Provide and install one (1) Cat6A 2-data wireless access point location.$17,337Feb 11, 2026
BCCMLow voltage permit related to fire alarm at UMMC Stoler Center for Advanced Medicine$33,000,000Feb 2, 2026
BCCMBPE WILL MODIFY THE EXISTING SPRINKLER SYSTEM. ADD 3RD PARTY REVIEW$11,900Jan 29, 2026
BCCMSCOPE OF WORK: ------ LEVEL I INTERIOR ALTERATIONS ----- RENOVATION AND ALTERATIONS TO EXISTING UMMC SGA13 EVS SUITE AS PER PLANS AS PER CODE$63,750Dec 23, 2025
BCCMREPLACE THE COMMUNICATION NURSE CALL STAND-ALONE SYSTEM, WORK TO INCLUDE REPLACEMENT AND INSTALLATION 1211 DEVICES AS PER PLANS AS PER CODE.$1,668,680Dec 11, 2025
BCCMTHE EXISTING MATERIAL DISTRIBUTION CENTER ON THE WEST WING OF THE GROUND FLOOR IN THE NORTH BUILDING WILL UNDERGO A RENOVATION TO CONSTRUCT A NEW DE-CASING ROOM IN SUPPORT OF INCREASED INFECTION CONTROL MEASURES. THE WORK WILL INCLUDE SELECTIVE DEMOLITION OF EXISTING WALLS AND CEILINGS. MODIFICATION TO EXISTING MEP SYSTEMS TO SUPPORT THE NEW FLOOR PLAN LAYOUT IS INCLUDED;$225,000Dec 8, 2025
BCCMSCOPE OF WORK: ---------- CAT I DEMOLITION ------ - Interior non-structural demolition in preparation of future renovations. as per plans as per code. ************** Separate permit will be filed for interior fit-out. ***********$40,000Dec 1, 2025
BCCMAdd and relocate automatic sprinklers as necessary for new architectural modifications. Total sprinklers relocated = 4 Total sprinklers added = 1 Total sprinklers this project = 5$4,000Dec 1, 2025
BCCMInstall (4 signs in total, 3 are illuminated) building-mounted signs: Sign D3: "University of Maryland Medical Center w/logo" 10'-5" x 46'-9" = 487.13 SF, Sign D1: "logo" 52 5/8" x 125 1/4" = 45.77 SF, Sign C3: "The Roslyn and Leonard Stoler Center For Advanced Medicine" 22" x 58'-9" = 107.70 SF, Sign C5: "North Entrance" 8" x 6'-4 3/4" = 4.28 SF. As per plans as per code. Please amend this permit to add the required licensed professional(s) before work can begin.$25,000Nov 25, 2025
BCCMSCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------- - 9TH FLOOR FIT OUT WITHIN A NEWLY CONSTRUCTED PATIENT UNIT TOWER. AS PER PLANS AND AS PER CODE$6,000,000Nov 17, 2025
BCCMAmend com2022-02411 issued 11/20/2023 to modify scope of work to add installation of underslab piping for Plumbing (107 fixtures to coordinate with construction project phasing on site) above 8th floor ceiling (which is the base of the 9th floor) as per plans as per code.$500,000Nov 12, 2025
BCCM********* O RENOVATION OF EXISTING NON-SLEEPING PATIENT CARE SUITE FOR USE AS A UROLOGY CLINIC, ALONG WITH ADDITIONAL WORK SPACE FOR STAFF AND HEALTH CARE PROVIDERS. THIS RENOVATION WILL MAINTAIN MOST EXISTING PARTITION LAYOUTS WITH ********* SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------- SELECTED DEMOLITION/RECONFIGURATION OF NEW ROOMS, FINISHES, AND EQUPMENT. ALTERATION LEVEL II (PER IEBC). AS PER PLANS AND AS PER CODE. ********* NO CHANGE TO THE BUILDING'S EXISTING LIFE SAFETY CONFIGURATION. *********$800,000Nov 11, 2025
BCCMLEVEL II INTERIOR ALTERATIONS (EQUIPMENT) -------- THE OR-32 PROJECT INVOLVES A RENOVATION AND EQUIPMENT UPGRADE OF A 1,046-SQUARE-FOOT HYBRID OPERATING ROOM CONSISTING OF A CONTROL ROOM, EQUIPMENT ROOM, AND OPERATING ROOM ON THE SECOND FLOOR OF WEINBERG WITHIN THE UNIVERSITY OF MARYLAND MEDICAL CENTER (UMMC). THE UPGRADES WILL INCLUDE NEW STRYKER AND PHILIPS EQUIPMENT AND GENERAL FINISH UPGRADES. AS PER PLANS AND AS PER CODE.Oct 29, 2025
BCCM************ Amendment for Additional Scope; COM2024-02809. ************* SCOPE OF WORK: ----------- INTERIOR ALTERATIONS ---------- RENOVATION OF EXISTING PATIENT HOLDING. THIS INCLUDES MODIFICATIONS TO ARCHITECTURAL. ----- TRADES ---------- MECHANICAL, PLUMBING, ELECTRICAL, LIGHTING. AS PER PLANS AS PER CODE.$250,000Oct 17, 2025
BCCMLow Voltage Security Access Control as per code.$64,400Oct 15, 2025
BCCMAdd and relocate automatic sprinklers as necessary due to architectural modifications. Total Sprinklers Added = 3 Total Sprinklers Relocated =7. Total Sprinklers this project = 10$4,919Oct 15, 2025
BCCMCabling for new Cancer Center$1,779,090Oct 13, 2025
BCCMFire Alarm Permit$26,925Aug 25, 2025
BCCMAdd and relocate automatic sprinklers as necessary for new architectural modifications. DEMO old dry system and replace for like sizes with stainless steel pipe. Total sprinklers relocated - 43 Total sprinklers added - 2 Total sprinklers this project - 45$18,000Aug 21, 2025
BCCM74 Low Voltage Tempurature Control Devices$69,188Aug 20, 2025
BCCMSCOPE OF WORK: ------- INTEriOR ALTERAITONS (EQUIPMENT) --------- Interior renovation of approximately 880 sq. ft. of existing space on the third floor South Building at the UMMC campus to replace cath lab equipment, consisting of architectural, structural, mechanical, electrical, plumbing, fire alarm and low voltage work. AS PER PLANS AND AS PER CODE.Aug 13, 2025
BCCMLow Voltage Security Access Control$1,124,613Jul 15, 2025
BCCMLow Voltage Security Access Control$139,128Jul 8, 2025
BCCMLow Voltage Security Access Control$125,500Jul 8, 2025

Violations

1
KindCategoryStatusDate
service_requestHCD-CCE Building Permit ComplaintClosedFeb 18, 2026

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.