Baltimore City · 21202
409 E FAYETTE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $32,393,167
- Land use
- Exempt Commercial (EC)
- Year built
- 1953
- Last sale
- Jan 9, 2019
Assessment
| Owner | MAYOR AND CITY COUNCIL OF |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $32,393,167 (cycle 2026) |
| Last sale | Jan 9, 2019 — $1,600,000 |
| Year built | 1953 |
| Zoning | C-5DC |
| Vacant | — |
Permits
15| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | **TEST** This is a test application | $15,000 | Feb 4, 2025 |
| COM2022 | INSTALL (1) # SANITARY CONNECTION (1-2 FAM. RES.), (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE.******* AS PER THE DEPARTMENT OF PLANNING: THE STRUCTURE IS LOCATED IN THE REGULATORY FLOODPLAIN. NATURAL GRADE NEAR THE SITE IS 18 FT AND THE FLOOD PROTECTION ELEVATION (FPE) IS 19 FT NAVD 88. ALL MEP COMPONENTS MUST BE LOCATED ABOVE THE FPE (1 FT ABOVE NATURAL GRADE), BE MADE WATER TIGHT ACCORDING TO ASCE 24, OR BE ELEVATED AS MUCH AS POSSIBLE TO AVOID DAMAGE BY FLOOD WATERS. | $5,000 | Aug 23, 2022 |
| COM2021 | ADD 6 AND RELOCATE 56 SPRINKLER HEADS TO MEET NFPA #13 FOR NEW WALL AND CEILING LOCATIONS AS PER PLANS AS PER CODE. | $7,000 | Sep 20, 2021 |
| COM2021 | FIRELINE WILL PROVIDE MECHANICAL LABOR, AND MATERIALS, TO RELOCATE 44 AND ADD 20 HEADS TO THE EXISTING SPRINKLER COVERAGE FOR THIS FIRST PHASE OF THE TENANT MODIFICATION PROJECT ON THE 4TH FLOOR, SCOPE INCLUDES ADDING AND RELOCATING SPRINKLER COVERAGE AS NEEDED TO MEET THE NEW FLOOR AND CEILING LAYOUTS AS PER PLANS AS PER CODE. | $11,000 | Mar 22, 2021 |
| COM2021 | THIS IS A TEST | $1,995 | Feb 25, 2021 |
| COM2020 | NON STRUCTURAL ALTERATIONS 18,000 SQFT 4TH FLOOR, RE-CONFIGURING OFFICES, BY USING NON COMBUSTIBLE MATERIAL, MAINTAINING EXISTING TYPE OF CONSTRUCTION AND NO CHANGES TO EGRESS PATTERNS, AS PER PLANS AS PER CODE. | $200,000 | Feb 10, 2021 |
| COM2021 | INSTALL (26) # FIXTURES/DEVICES, (125) # FIXTURES/DEVICES, (175) # FIXTURES/DEVICES, (10) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $500 | Jan 28, 2021 |
| COM2020 | NON STRUCTURAL ALTERATIONS 7300 SQFT 2ND FLOOR, RE-CONFIGURING OFFICES, BY USING NON COMBUSTIBLE MATERIAL, MAINTAINING EXISTING TYPE OF CONSTRUCTION AND NO CHANGES TO EGRESS PATTERNS AS PER CODE AND AS PER SUBMITTED PLANS. SEPARATE PERMIT WILL BE PULLED FOR MEP WORK. | $50,000 | Feb 7, 2020 |
| COM2020 | INSTALL (5) # BRANCH CIRCUITS/FEEDERS , (80) # FIXTURES/DEVICES, | $300 | Feb 6, 2020 |
| COM2019 | reinstate original permit.(original permit:com2018-84098:install (2) # branch circuits/feeders , (3) # branch circuits/feeders , (80) # low voltage, (4) # branch circuits/feeders as per code.) original permit description:(com2018-84098) install (2) # branch circuits/feeders , (3) # branch circuits/feeders , (80) # low voltage, (4) # branch circuits/feeders as per code. | — | Dec 3, 2019 |
| COM2019 | install (25) # fixtures/devices, (27) # low voltage as per code. (direct replacement in the same size, capacity, and location) | $500 | Aug 14, 2019 |
| COM2019 | non structural alterations 4950 sqft 5th floor, re configuring offices, by using non combustible material, maintaining existing type of construction and no changes to egress patterns as per plans as per code. separate permit will be required for sprinkler and fire alarm system. | $85,000 | Jul 18, 2019 |
| COM2019 | scope of work:--interior alterations--non structural alterations 2500 sqft 12 floor, re configuring offices, by using non combustible material, maintaining existing type of construction and no changes to egress patterns as per code. | $100,000 | Jun 21, 2019 |
| COM2019 | non structural alteration 11,000 sqft 14th floor, reconfiguring offices, by using non combustible material, maintaining existing type of construction and no changes to egress patterns as per code. | $400,000 | Jun 21, 2019 |
| COM2019 | scope of work:--interior alterations--non structural alterations 10407 sqft 13 floor, re configuring offices, by using non combustible material, maintaining existing type of construction and no changes to egress patterns as per code. | $400,000 | Jun 6, 2019 |
Violations
0No violations on record.
Inspections
28| Type | Status | Action | Date |
|---|---|---|---|
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 10, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jun 9, 2026 |
| Initial | Not Finished | — | Jan 6, 2026 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jan 6, 2026 |
| InitialSI | Not Finished | — | Jan 6, 2026 |
| InitialECB | Not Finished | WARNING NOTICE | Dec 29, 2025 |
| InitialSI | Not Finished | ISSUE NOTICE | Sep 20, 2025 |
| Initial | Not Finished | — | Sep 20, 2025 |
| Initial | Not Finished | ISSUE NOTICE | Sep 20, 2025 |
| InitialSI | Not Finished | ISSUE CITATION NOTICE | Apr 17, 2025 |
| InitialSI | Not Finished | ISSUE NOTICE | Feb 8, 2024 |
| InitialSI | Not Finished | ISSUE NOTICE | Nov 27, 2023 |
| Initial | Not Finished | ISSUE NOTICE | May 11, 2023 |
| ReInsp | Not Finished | FAIL INSPECTION | Oct 20, 2022 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Sep 9, 2022 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Apr 26, 2019 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Oct 1, 2018 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jan 26, 2016 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Mar 20, 2013 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Feb 11, 2011 |
| InitialZone | Not Finished | ISSUE NOTICE | Oct 6, 2010 |
| InitialECB | Not Finished | ISSUE CITATION NOTICE | Jul 15, 2010 |
Nearby recent activity
- permit: BCCMJun 23, 2026 · 80 m · 421 E BALTIMORE ST
- permit: BUSEJun 22, 2026 · 80 m · 423 E BALTIMORE ST
- permit: BCCMJun 18, 2026 · 128 m · 100 HOLLIDAY ST
- violation: SW-HGWJun 17, 2026 · 26 m
- violation: SW-HGWJun 17, 2026 · 26 m
- violation: SW-HGWJun 10, 2026 · 26 m
- violation: SW-HGWMay 12, 2026 · 26 m
- violation: SW-HGWMay 12, 2026 · 26 m
- violation: SW-HGWMay 12, 2026 · 26 m
- violation: SW-HGWMay 5, 2026 · 26 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.