Baltimore City · 21202

605 FALLSWAY

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$1,704,600
Land use
Commercial (C)
Year built
1940
Last sale
Oct 5, 2004

Assessment

OwnerSCMD HOLDINGS, LLC.
Land useCommercial (C)
Total assessment$1,704,600 (cycle 2026)
Last saleOct 5, 2004 — $1,700,000
Year built1940
ZoningC-5DC
Vacant

Permits

5
TypeDescriptionCostIssued
BCCMFURNISH AND INSTALL FIRE ALARM SYSTEM AS PER PLANS AS PER CODE$25,000Mar 19, 2026
BCCMREPLACE AND RELOCATE 85 AND NEW 4 TO EXISTING SPRINKLER FOR NEW WALL TENANT SPACE$65,000Feb 23, 2026
BCCMFIRST FLOOR: DEMO EXISTING LAYOUT. PREP FOR NEW LAYOUT AS PLANNED. STAIR TOWERS TO REMAIN. NEW INTERIOR STAIR AND WHEEL CHAIR LIFT. NEW KITCHEN EQUIPMENT, BATHROOMS, 2 BARS, AND NEW SEATING ON FIRST FLOOR. SECOND FLOOR: DEMO EXISTING LAYOUT. PREP FOR NEW LAYOUT AS PLANNED. DEMO ALL INTERIOR PARTITIONS AND REMOVE ALL FIXTURES, FINISHES, AND FITTINGS. NEW LAYOUT TO INCLUDE PRIVATE ROOMS, RESTROOMS, BAR, LOCKER ROOM, AND OPEN SEATING SPACE. THIRD FLOOR: AV ROOM ROOM FOR SOUND / LIGHTING EQUIPMENT. INTERIOR STAIR TO ACCESS AV ROOM FOR MAINTENANCE. UNOCCUPIED SPACE. FOURTH FLOOR: NOT IN SCOPE. UNOCCUPIED SPACE$200,000Oct 31, 2025
COM2023SCOPE OF WORK: ----- ADDITION ----- REMOVE ROOF TO EXISTING TWO STAIR TOWERS. PREPARE TO EXTEND FIRE STAIR TO THE FOURTH FLOOR. EXPAND STAIR TOWER ------ EXTERIOR ALTERATONS -------- REMOVE ALL ROOF EQUIPMENT AND PREPARE TO INSTALL NEW BALCONY WITH RAILING. EXTEND BOTH STAIR TOWERS UP TO THE ROOF. ----- LEVEL III INTERIOR ALTERATIONS ------- FIRST FLOOR: PARTIAL DEMOLITION OF INTERIOR PARTITIONS, DOORS, BENCHES, AND ALL FIXTURE, FINISHES/FITTINGS. CONSTRUCT NEW ELEVATOR, STAIR, AND STEP. MINOR LIGHTING INSTALLATION. SECOND FLOOR: PARTIAL DEMOLITION OF INTERIOR PARTITIONS, DOORS, AND ALL FIXTURE, FINISHES/FITTINGS. REMOVE EXISTING STAIRCASE. CONSTRUCT NEW ELEVATOR, STAIR, AND INTERIOR PARTITIONS. MINOR LIGHTING INSTALLATION. THIRD FLOOR: DEMOLISH ALL INTERIOR PARTITIONS AND REMOVE ALL FIXTURES, FINISHES, AND FITTINGS. REMOVE BOTH EXISTING STAIRCASES. CONSTRUCT NEW ELEVATOR AND STAIR. INSTALL NEW INTERIOR PARTITIONS. FOURTH FLOOR: REMOVE ALL FIXTURE, FINISHES, AND FITTINGS. REMOVE ALL INTERIOR PARTITIONS. REMOVE ALL LATERAL BRACING ON THE EXISTING COLUMNS. REINFORCE THE REMAINING BEAMS. REMOVE EXISTING STAIRCASE. CONSTRUCT NEW ELEVATOR AND STAIR. INSTALL NEW INTERIOR PARTITIONS. AS PER PLANS AS PER CODE. Sep 19, 2025
USE2022CONTINUE TO USE SECOND FLOOR FOR TAVERN/LOUNGE WITH RETAIL SALES AND USE UPPER FLOORS FOR OFFICES AND STORAGE FOR AN EXISTING ADULT ENTERTAINMENT BUSINESS PER BMZA 742-06(CHANGE OF OPERATOR,)Sep 28, 2022

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.