Baltimore City · 21202

924 E BALTIMORE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$867,400
Land use
Commercial (C)
Year built
1870
Last sale
May 9, 2013

Assessment

OwnerHARBOUR POINT, LLC
Land useCommercial (C)
Total assessment$867,400 (cycle 2026)
Last saleMay 9, 2013 — $170,000
Year built1870
ZoningTOD-2
Vacant

Permits

14
TypeDescriptionCostIssued
BUSETO USE 1ST AND 2ND FLOORs for office(s), 2nd floor conference and office spaces.Jul 31, 2025
COM2024SCOPE OF WORK: --------- REISSUE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2017-16260:*AUTHORIZATION TO PROCEED* REMOVE NON-ORIGINAL CORNICE AT FRONT FAÇADE ABOVE FIRST FLOOR AND INSTALL CANOPY ABOVE FIRST FLOOR WINDOWS AND DOORS SUPPORTED BY METAL TRUSSES AND METAL TIE BACKS. CANOPY TO BE 6’-0” DEEP AND EXTEND 42’-6” ALONG ENTIRE FRONT FAÇADE AND WRAP 6’-6” ALONG EAST (EXETER STREET) SIDE. CANOPY TO HAVE CEDAR SOFFIT AND RECESSED LIGHT AND TO BE COVERED IN BLACK METAL STANDING-SEAM ROOF WITH HALF-ROUND GUTTERS. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.) ORIGINAL PERMIT DESCRIPTION:(COM2017-16260) *AUTHORIZATION TO PROCEED* REMOVE NON-ORIGINAL CORNICE AT FRONT FAÇADE ABOVE FIRST FLOOR AND INSTALL CANOPY ABOVE FIRST FLOOR WINDOWS AND DOORS SUPPORTED BY METAL TRUSSES AND METAL TIE BACKS. CANOPY TO BE 6’-0” DEEP AND EXTEND 42’-6” ALONG ENTIRE FRONT FAÇADE AND WRAP 6’-6” ALONG EAST (EXETER STREET) SIDE. CANOPY TO HAVE CEDAR SOFFIT AND RECESSED LIGHT AND TO BE COVERED IN BLACK METAL STANDING-SEAM ROOF WITH HALF-ROUND GUTTERS. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ---------- 10 FIXTURES/DEVICES AS PER CODE.Apr 30, 2025
COM2024INSTALL (1) # BRANCH CIRCUITS/FEEDERS AS PER CODE.$500Oct 2, 2024
USE2023ADD 1ST FLOOR CONFERENCE ROOM TO EXISTING SUITES (SUITES 204, 205, & 206) FOR USE AS OFFICE SPACE-COUNSELING/ ADDICTION SERVICES.May 18, 2023
USE2022USE SUITE 306 FOR/AS A HEALTH-CARE CLINIC (MENTAL HEALTH COUNSELING SERVICES/PSYCHIATRIC REHABILITATION SERVICES)Dec 20, 2022
USE2022USE SUITES 303B AND 303C AS OFFICES FOR MENTAL HEALTH PROFESSIONAL.Jun 13, 2022
USE2022USE SUITES 303A AND 303B AS OFFICE FOR MENTAL HEALTH PROFESSIONAL.Mar 30, 2022
USE2022USE SUITE 301 AS A MENTAL HEALTH OFFICE. WE WILL SERVE ADULTS AND YOUTH.Mar 29, 2022
USE2019use 2nd floor (suites 204, 205, & 206)as office space-counseling/ addiction servicesAug 1, 2019
USE2019use entire premises for offices and commercial spaceAug 1, 2019
USE2019use portion of premises as office for wholesale auto dealer; no inventory kept on site. dealer to dealer sale. Aug 1, 2019
COM2019install (1) # new distribution system (1-2 family), (2) # plumbing fixtures, (1) 50000 btu fuel-burning equip, (1) # sanitary connection (reconstruction0, (1) # water service pipe (reconstruction), (1) # gas test as per code.$1,500Jul 31, 2019
COM2019replace in kind (same size & location) (6) two ton ac units and (2) gas furnaces (60k each) as per code. note to inspector: no plans are required since this was incorrectly filed with eplans instead of epermits.$10,000Jul 16, 2019
COM2019reinstate:: extend original permit.(original permit:com2017-16260:*authorization to proceed* remove non-original cornice at front façade above first floor and install canopy above first floor windows and doors supported by metal trusses and metal tie backs. canopy to be 6’-0” deep and extend 42’-6” along entire front façade and wrap 6’-6” along east (exeter street) side. canopy to have cedar soffit and recessed light and to be covered in black metal standing-seam roof with half-round gutters. all work to be completed as per information/plans/specs in chap files.) original permit description:(com2017-16260) *authorization to proceed* remove non-original cornice at front façade above first floor and install canopy above first floor windows and doors supported by metal trusses and metal tie backs. canopy to be 6’-0” deep and extend 42’-6” along entire front façade and wrap 6’-6” along east (exeter street) side. canopy to have cedar soffit and recessed light and to be covered in black metal standing-seam roof with half-round gutters. all work to be completed as per information/plans/specs in chap files.Jan 21, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.