Baltimore City · 21202
924 E BALTIMORE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $867,400
- Land use
- Commercial (C)
- Year built
- 1870
- Last sale
- May 9, 2013
Assessment
| Owner | HARBOUR POINT, LLC |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $867,400 (cycle 2026) |
| Last sale | May 9, 2013 — $170,000 |
| Year built | 1870 |
| Zoning | TOD-2 |
| Vacant | — |
Permits
14| Type | Description | Cost | Issued |
|---|---|---|---|
| BUSE | TO USE 1ST AND 2ND FLOORs for office(s), 2nd floor conference and office spaces. | — | Jul 31, 2025 |
| COM2024 | SCOPE OF WORK: --------- REISSUE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2017-16260:*AUTHORIZATION TO PROCEED* REMOVE NON-ORIGINAL CORNICE AT FRONT FAÇADE ABOVE FIRST FLOOR AND INSTALL CANOPY ABOVE FIRST FLOOR WINDOWS AND DOORS SUPPORTED BY METAL TRUSSES AND METAL TIE BACKS. CANOPY TO BE 6’-0” DEEP AND EXTEND 42’-6” ALONG ENTIRE FRONT FAÇADE AND WRAP 6’-6” ALONG EAST (EXETER STREET) SIDE. CANOPY TO HAVE CEDAR SOFFIT AND RECESSED LIGHT AND TO BE COVERED IN BLACK METAL STANDING-SEAM ROOF WITH HALF-ROUND GUTTERS. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.) ORIGINAL PERMIT DESCRIPTION:(COM2017-16260) *AUTHORIZATION TO PROCEED* REMOVE NON-ORIGINAL CORNICE AT FRONT FAÇADE ABOVE FIRST FLOOR AND INSTALL CANOPY ABOVE FIRST FLOOR WINDOWS AND DOORS SUPPORTED BY METAL TRUSSES AND METAL TIE BACKS. CANOPY TO BE 6’-0” DEEP AND EXTEND 42’-6” ALONG ENTIRE FRONT FAÇADE AND WRAP 6’-6” ALONG EAST (EXETER STREET) SIDE. CANOPY TO HAVE CEDAR SOFFIT AND RECESSED LIGHT AND TO BE COVERED IN BLACK METAL STANDING-SEAM ROOF WITH HALF-ROUND GUTTERS. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. ---------- 10 FIXTURES/DEVICES AS PER CODE. | — | Apr 30, 2025 |
| COM2024 | INSTALL (1) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $500 | Oct 2, 2024 |
| USE2023 | ADD 1ST FLOOR CONFERENCE ROOM TO EXISTING SUITES (SUITES 204, 205, & 206) FOR USE AS OFFICE SPACE-COUNSELING/ ADDICTION SERVICES. | — | May 18, 2023 |
| USE2022 | USE SUITE 306 FOR/AS A HEALTH-CARE CLINIC (MENTAL HEALTH COUNSELING SERVICES/PSYCHIATRIC REHABILITATION SERVICES) | — | Dec 20, 2022 |
| USE2022 | USE SUITES 303B AND 303C AS OFFICES FOR MENTAL HEALTH PROFESSIONAL. | — | Jun 13, 2022 |
| USE2022 | USE SUITES 303A AND 303B AS OFFICE FOR MENTAL HEALTH PROFESSIONAL. | — | Mar 30, 2022 |
| USE2022 | USE SUITE 301 AS A MENTAL HEALTH OFFICE. WE WILL SERVE ADULTS AND YOUTH. | — | Mar 29, 2022 |
| USE2019 | use 2nd floor (suites 204, 205, & 206)as office space-counseling/ addiction services | — | Aug 1, 2019 |
| USE2019 | use entire premises for offices and commercial space | — | Aug 1, 2019 |
| USE2019 | use portion of premises as office for wholesale auto dealer; no inventory kept on site. dealer to dealer sale. | — | Aug 1, 2019 |
| COM2019 | install (1) # new distribution system (1-2 family), (2) # plumbing fixtures, (1) 50000 btu fuel-burning equip, (1) # sanitary connection (reconstruction0, (1) # water service pipe (reconstruction), (1) # gas test as per code. | $1,500 | Jul 31, 2019 |
| COM2019 | replace in kind (same size & location) (6) two ton ac units and (2) gas furnaces (60k each) as per code. note to inspector: no plans are required since this was incorrectly filed with eplans instead of epermits. | $10,000 | Jul 16, 2019 |
| COM2019 | reinstate:: extend original permit.(original permit:com2017-16260:*authorization to proceed* remove non-original cornice at front façade above first floor and install canopy above first floor windows and doors supported by metal trusses and metal tie backs. canopy to be 6’-0” deep and extend 42’-6” along entire front façade and wrap 6’-6” along east (exeter street) side. canopy to have cedar soffit and recessed light and to be covered in black metal standing-seam roof with half-round gutters. all work to be completed as per information/plans/specs in chap files.) original permit description:(com2017-16260) *authorization to proceed* remove non-original cornice at front façade above first floor and install canopy above first floor windows and doors supported by metal trusses and metal tie backs. canopy to be 6’-0” deep and extend 42’-6” along entire front façade and wrap 6’-6” along east (exeter street) side. canopy to have cedar soffit and recessed light and to be covered in black metal standing-seam roof with half-round gutters. all work to be completed as per information/plans/specs in chap files. | — | Jan 21, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJun 25, 2026 · 104 m
- violation: BC 123.8.2May 19, 2026 · 108 m · 18 N HIGH ST
- violation: HCD-Sanitation PropertyMay 5, 2026 · 125 m
- violation: HCD-Vacant BuildingApr 10, 2026 · 129 m
- violation: HCD-Maintenance StructureFeb 24, 2026 · 117 m · 856 WATSON ST
- violation: BC 123.8.2Feb 20, 2026 · 108 m · 18 N HIGH ST
- violation: PM 305.1Jan 13, 2026 · 122 m · 820 E BALTIMORE ST
- violation: HE 7-702Jan 13, 2026 · 122 m · 820 E BALTIMORE ST
- violation: PM 306.1Jan 13, 2026 · 122 m · 820 E BALTIMORE ST
- violation: PM 306.4Jan 13, 2026 · 122 m · 820 E BALTIMORE ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.