600 N WOLFE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $89,434,100
- Land use
- Exempt Commercial (EC)
- Year built
- —
- Last sale
- Mar 27, 2008
Assessment
| Owner | JOHNS HOPKINS HOSPITAL, THE |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $89,434,100 (cycle 2026) |
| Last sale | Mar 27, 2008 |
| Year built | — |
| Zoning | H |
| Vacant | — |
Permits
showing 50 of 72| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | The project includes the removal of existing imaging equipment and the installation of new Siemens imaging equipment (Model CS14098) in Room ZB 316 (3251), along with associated Siemens control workstations located in the Control Room (3262). The work also includes widening the opening of Equipment Room (3249) to meet the clearance requirements necessary for the installation of the new Siemens equipment. A new Equipment Closet (3253) will be constructed to house the Karl Storz A/V equipment rack (NEO-IP). In addition, new wall-mounted control panels will be installed in the Control Room (3262) as required. The project scope further includes interior finish modifications in all affected areas, including adjustments to walls, flooring, and ceilings necessary to support the equipment installation and associated upgrades. | $2,500,000 | Jul 8, 2026 |
| BCCM | adding 1 device to existing system. as per plans as per code. | $2,500 | Jun 23, 2026 |
| BCCM | Provide and install six (6) flush mount 2-data locations Provide and install one (1) flush mount 1-data wall phone location Provide and install one (1) flush mount 2-data wireless access point Install one (1) customer-provided wireless access point | $11,500 | Jun 17, 2026 |
| BCCM | Install a low voltage security system to include: 8 readers, 8 contacts, 8 strikes, 8 rex, and 4 cameras | $21,000 | Jun 17, 2026 |
| BCCM | Disconnect and make safe existing electrical equipment, furnish and install a new electrical panel, and install new lighting and power circuits throughout the project area. Temporary power and temporary lighting will be provided as needed during construction to support ongoing work activities and maintain safe working conditions. | $50,000 | Jun 1, 2026 |
| BCCM | ********** AMENDMENT *********** SCOPE OF WORK: ------- INTERIOR ALTERATIONS --------- - This permit amendment addresses revisions to the office and laboratory layouts on several floors and wings of the project as requested by the owner to best support research efforts. - MEPF systems have been updated as required to support the revised floor plans and equipment. See provided narratives for additional information. AS PER PLANS AND AS PER CODE. | $19,500,000 | May 27, 2026 |
| BCCM | SCOPE OF WORK: PLEASE AMEND THIS PERMIT TO ADD ALL REQUIRE LICENSED PROFESSIONALS BEFORE ANY WORK CAN BEGIN ------- INTEROR ALTERATIONS (EQUIMENT INSTALLATION) -------- -THE PROJECT SCOPE CONSISTS OF REPLACING THE CURRENT IMAGING EQUIPMENT WITH A NEW SIEMENS XCITE SCANNER. - FINISHES IN THE ROOM WILL BE REFRESHED AS REQUIRED. - EQUIPMENT ROOM DOOR WILL BE REPLACED AND SIZE WILL BE MODIFIED. - THE ROOM WILL BE A CLASS 2 IMAGING ROOM. AS PER PLANS AND AS PER CODE | $50,000 | May 22, 2026 |
| BCCM | *THIRD PARTY PLAN REVIEWED* Reliance's work consists of modifying the existing wet pipe sprinkler system by relocating 6 sprinklers to accommodate new interior alterations. The design shall be per light hazard occupancy and follow the guidelines o NFPA 13, 2019 and Baltimore City. | $9,600 | May 21, 2026 |
| BCCM | The scope of work includes, BFPE removing the existing foam monitor nozzles and foam tanks that protect the existing helipads. BFPE will install a new one hundred and fifty gallon foam tank and twelve fixed nozzles to provide the proper foam protection for the existing helipads. | $212,800 | May 20, 2026 |
| BCCM | THIS IS A REVISION TO COM2022-03556 The clean agent system was expanded to protect Lab 3074A in addition to the Robotics Enclosure that is currently being protected with the first submission. Lab 3074A is being protected to ensure the fan test passes. The following equipment is being added: Four (4) photoelectric smoke detectors One (1) clean agent cylinder One (1) clean agent nozzle One (1) clean agent electric control head Associated wiring Associated pipes and fittings | $29,925 | May 14, 2026 |
| BCCM | ------ change to original scope (This permit scope is to amend issued permit bccm-25-001487.) ------- For Installation of two (2) underground vaults for the chill water loop valves. AS PER PLANS AND AS PER CODE. | $1,770,000 | May 13, 2026 |
| BUSE | Partial use and occupancy of renovated West Tower Level 2. Includes offices, elevator vestibules, and support spaces. In reference to original COM2021-00506 and extended COM2024-89155 | — | Apr 27, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 11. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 10. Includes offices, elevator vestibules, and support spaces. | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 9. Includes offices, elevator vestibules, and support spaces. | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 8. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 7. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 6. Includes offices, elevator vestibules, and support spaces. | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 5. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 4. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BUSE | Partial Use and Occupancy of renovated West Tower Level 3. Includes offices, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Apr 24, 2026 |
| BCCM | MODIFY EXISITNG SPRINKLER SYSTEM ADD AND RELOCATE 3RD PARTY REVIEW. | $14,638 | Apr 17, 2026 |
| BUSE | To use portion as a new Cafe at lobby level of new CMSC North Tower Addition. Includes Cafe and Cafe Storage space. | — | Apr 15, 2026 |
| BCCM | BFPE WILL RELOCATE SPRINKLER HEADS WHILE MAINTAINING PROPER COVERAGE IN THE AREA OF WORK | $10,235 | Apr 10, 2026 |
| BCCM | BFPE will add and relocate sprinkler heads in order to accommodate the renovations while still maintaining proper coverage. | $9,350 | Apr 6, 2026 |
| BCCM | 3RD PARTY REVIEW SOW - The scope of work includes BFPE removing the existing branchlines in the space. We will tie into the existing branchline in order to install new branchlines and sprinkler heads to provide t he proper coverage in the newly renovated Cath Lab 521. | $14,000 | Apr 6, 2026 |
| BCCM | This is a refile of BCCM-25-000007, which was previously filed and approved under an incorrect address. The scope of work and project have already been approved, and a permit has been issued. Per my phone conversation with David Lyons on 1/15/26, I was instructed to refile and request an expedited review. The previously approved permit and plans have been uploaded with this submission. Please review at your earliest convenience. Thank you. AT&T proposes to swap (3) existing antennas and (12) existing remote radio units with new. The proposed modification does not increase the height of the existing wireless facility. | $15,000 | Mar 19, 2026 |
| BCCM | BFPE WILL MODIFY EXISTING 4TH FLOOR SPRINKLER SYSTEM TO PROTECT NEW CEILING AND WALL LAYOUT. | $27,250 | Mar 9, 2026 |
| BUSE | Partial Use and Occupancy of new North Tower Addition Level 7. Includes offices, lab spaces, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BUSE | Partial Use and Occupancy of new North Tower Addition Level 6. Includes offices, lab spaces, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BUSE | Partial Use and Occupancy of new North Tower Addition Level 4. Includes offices, lab spaces, elevator vestibules, and support spaces. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BUSE | Partial Use and Occupancy of Renovated South Tower Level 9. Includes lab spaces, offices, support spaces, elevator lobbies, bathrooms and elevators numbered 1-8 and corridors. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BUSE | Partial Use and Occupancy of Renovated South Tower Level 8. Includes lab spaces, offices, support spaces, elevator lobbies, bathrooms and elevators numbered 1-8 and corridors. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BUSE | Partial Use and Occupancy of Renovated South Tower Level 7. Includes lab spaces, offices, support spaces, elevator lobbies, bathrooms and elevators numbered 1-8 and corridors. In reference to Original COM2021-00506 and extended COM2024-89155 | — | Feb 26, 2026 |
| BCCM | Fire alarm Revision of approved drawings for permit # BCCM-25-000286 | $312,134 | Feb 24, 2026 |
| BCCM | EXISTING SPRINKLER SYSTE RELOCAT 5 SPRINKLER HEADS 3RD PARTY REVIEW. | $11,620 | Feb 3, 2026 |
| BCCM | WORK CONSISTS OF MODIFYING EXISTING WET FIRE SPRINKLER SYSTEM BY ADDING / RELOCATING SPRINKLERS TO ACCOMODATE THE NEW INT. ALT. DESIGN AND INSTALLATION OF COMPONENTS SHALL BE IN ACCORDANCE WITH NFPA 13-2019 EDT. AND BALTIMORE CITY FIRE CODE. MATCH EXISTING HAZARD OCCUPANCY, EXISITNG MAXIMUM PROTECTION AREA BETWEEN SPRINKLERS, AND SYSTEM COMPOENTS ALREADY APPROVED / UTILIZED. | $9,900 | Feb 2, 2026 |
| BCCM | ********** PARENT PERMIT BCCM-25-001028 ************* SCOPE OF WORK: ------- TRADE WORK ------ Installation of new electrical ductbank for proposed building (on 600 North Broadway filed under permit #BCCM-25-001028), feeding from existing private JHH electrical manhole. AS PER PLANS AND AS PER CODE. | $4,290,000 | Jan 9, 2026 |
| BCCM | Provide and install thirteen (13) flush mount 2-data locations. Provide and install faceplates and modular jacks as required for the termination of the new 4-pair cables at the workstation location. Provide and install one (1) Category 6a 48-port patch panel with one (1) 2RU horizontal wire manager. These will be installed at the required closet location for termination of the data cables installed. Provide sixteen (16) Ortronics Category 6a patch cords, blue in color, 5’ in length and thirty-six (36) Ortronics Category 6a patch cords, blue in color, 7’ in length. | $18,820 | Dec 16, 2025 |
| BCCM | The scope of work includes BFPE adding and relocating quick response pendents to provide the proper coverage. | $15,645 | Dec 3, 2025 |
| BCCM | SCOPE OF WORK: -------- EXTERIOR ALTERATIONS ---------- On existing building, swap 3 antennas, add 6 antennas, swap 12 radios and remove 3 radios. There will be no structure height increase and no ground disturbance. AS PER PLANS AND AS PER CODE. | $21,000 | Nov 26, 2025 |
| BCCM | Install 13 Data locations | $22,190 | Nov 21, 2025 |
| BCCM | EXISTING FIRE ALARM SYSTEM ADDING 3 MONITORING MODULES TO MONITOR EXISTING FOAM SYSTEMS. 3RD PARTY REVEW as per plans as per code. | $9,750 | Nov 19, 2025 |
| BCCM | EXISTING SPRINKLER SYSTEM RELOCATING 2 SPRINKLER HEADS 3RD PARTY REVIEW. | $2,000 | Nov 18, 2025 |
| BCCM | Relocation two (2) outlet locations as per code. | $2,720 | Nov 10, 2025 |
| BCCM | Modifications to power and lighting required to accommodate the tenant improvement | $130,000 | Oct 8, 2025 |
| BCCM | Fire Alarm Installation in Pediatric Cardiac Cath/EP Hybrid Operating Room. | $1,140,700 | Oct 7, 2025 |
| BCCM | CT SCANNER EQUIPMENT REPLACEMENT AND INTERIOR FINISH UPGRADES | — | Sep 17, 2025 |
| BCCM | *********** Renovation of existing storage room within the Sheik Zayed tower of the Johns Hopkins Main Campus. *********** SCOPE OF WORK: -------- INTERIOR ALTERATIONS (equipment) ----------- includes the replacement of existing disinfection/sterilization cabinets and modifications to the existing electrical and mechanical systems to support the new cabinets. AS PER PLANS AND AS PER CODE. | $100,000 | Sep 8, 2025 |
| BCCM | Renovation of Existing Interior Space to alter the Existing Fire Alarm System as per plans, as per code | $0 | Sep 3, 2025 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.