Baltimore City · 21205
804 N MADEIRA ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $452,600
- Land use
- Exempt (E)
- Year built
- 1920
- Last sale
- Nov 28, 2022
Assessment
| Owner | MORRISON, KENNETH |
|---|---|
| Land use | Exempt (E) |
| Total assessment | $452,600 (cycle 2026) |
| Last sale | Nov 28, 2022 — $459,125 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2022 | USE AS A SINGLE FAMILY DWELLING. | — | Oct 26, 2022 |
| COM2022 | INSTALL (1) # LOW VOLTAGE, (16) # LOW VOLTAGE, (4) # LOW VOLTAGE, (27) # LOW VOLTAGE AS PER CODE. | $5,975 | Aug 24, 2022 |
| COM2022 | INSTALL (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 42000 BTU AIR-CON SYSTEM, HEAT PUMP AS PER CODE. | $8,000 | Aug 24, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-76963:SCOPE OF WORK:----INTERIOR ALTERATIONS----UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER’S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETING OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. WORK WILL BE DONE AS PER PLANS AND AS PER CODE.) Original Permit Description:(COM2021-76963) SCOPE OF WORK:----INTERIOR ALTERATIONS----UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER’S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETING OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. WORK WILL BE DONE AS PER PLANS AND AS PER CODE. | — | Jun 9, 2022 |
| COM2022 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $10,000 | May 18, 2022 |
| COM2022 | INSTALL (1) # ELECTRIC WATER HEATER, (18) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE, NEW INTERIOR, (1) # SANITARY CONNECTION, NEW INTERIOR, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE. | $5,000 | May 10, 2022 |
| COM2022 | SCOPE OF WORK INCLUDES: REMOVE EXISTING DETERIORATED ROOF AND FLOORS. NEW FLOOR FRAMING - 2X10 JOISTS, NEW ROOF FRAMING-2X8 RAFTERS, NEW INTERIOR WALLS WITH 1/2'' DRYWALL AND 2X4 FRAMING, NEW 3/4'' WOOD FLOOR SHEATHING, NEW STAIRS W/ 7 3/4'' MAX RISE AND 10'' DEEP TREADS, NEW ROOF WITH 5/8'' ROOF SHEATHING AND ROOF MEMBRANE, NEW WINDOWS AND EXTERIOR DOORS IN EXSITING OPENINGS, CONSTRUCT REAR 1 STORY ADDITION (16' X 11') WITH CMU FOUNDATION, CONCRETE FOOTING, 2X6 EXTERIOR WALLS WITH 16'X11' DECK OVER REAR ADDITION. INSTALL 36'' HIGH GUARD. INSTALL NEW CABINETS AND TRIM AND FINISHES THROUGHOUT. RESTORE CORNICE, REPOINT BRICK, GUTTERS AND DOWNSPOUTS, BASEMENT EXCAVATION AND UNDERPINNING BY OTHERS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL ADDITION AND DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | $175,000 | May 3, 2022 |
| COM2021 | SCOPE OF WORK:----INTERIOR ALTERATIONS----UNDERPINNING OF FOUNDATION WALLS AS PER ATTACHED ENGINEER’S PLANS AND CERTIFICATION. THE ENGINEER CERTIFICATION IS REQUIRED AT COMPLETING OF WORK AND WITH A REPORT OF THE EXACT DATES OF PERIODIC INSPECTIONS DURING THE CONSTRUCTION. WORK WILL BE DONE AS PER PLANS AND AS PER CODE. | $17,000 | Dec 1, 2021 |
| COM2021 | AMEND PERMIT: CHANGE PRIME CONTRACTOR .(ORIGINAL PERMIT:COM2021-69188:SCOPE OF WORK INCLUDES: REMOVE EXISTING DETERIORATED ROOF AND FLOORS. NEW FLOOR FRAMING - 2X10 JOISTS, NEW ROOF FRAMING-2X8 RAFTERS, NEW INTERIOR WALLS WITH 1/2'' DRYWALL AND 2X4 FRAMING, NEW 3/4'' WOOD FLOOR SHEATHING, NEW STAIRS W/ 7 3/4'' MAX RISE AND 10'' DEEP TREADS, NEW ROOF WITH 5/8'' ROOF SHEATHING AND ROOF MEMBRANE, NEW WINDOWS AND EXTERIOR DOORS IN EXSITING OPENINGS, CONSTRUCT REAR 1 STORY ADDITION (16' X 11') WITH CMU FOUNDATION, CONCRETE FOOTING, 2X6 EXTERIOR WALLS WITH 16'X11' DECK OVER REAR ADDITION. INSTALL 36'' HIGH GUARD. INSTALL NEW CABINETS AND TRIM AND FINISHES THROUGHOUT. RESTORE CORNICE, REPOINT BRICK, GUTTERS AND DOWNSPOUTS, BASEMENT EXCAVATION AND UNDERPINNING BY OTHERS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL ADDITION AND DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS)) Original Permit Description:(COM2021-69188) SCOPE OF WORK INCLUDES: REMOVE EXISTING DETERIORATED ROOF AND FLOORS. NEW FLOOR FRAMING - 2X10 JOISTS, NEW ROOF FRAMING-2X8 RAFTERS, NEW INTERIOR WALLS WITH 1/2'' DRYWALL AND 2X4 FRAMING, NEW 3/4'' WOOD FLOOR SHEATHING, NEW STAIRS W/ 7 3/4'' MAX RISE AND 10'' DEEP TREADS, NEW ROOF WITH 5/8'' ROOF SHEATHING AND ROOF MEMBRANE, NEW WINDOWS AND EXTERIOR DOORS IN EXSITING OPENINGS, CONSTRUCT REAR 1 STORY ADDITION (16' X 11') WITH CMU FOUNDATION, CONCRETE FOOTING, 2X6 EXTERIOR WALLS WITH 16'X11' DECK OVER REAR ADDITION. INSTALL 36'' HIGH GUARD. INSTALL NEW CABINETS AND TRIM AND FINISHES THROUGHOUT. RESTORE CORNICE, REPOINT BRICK, GUTTERS AND DOWNSPOUTS, BASEMENT EXCAVATION AND UNDERPINNING BY OTHERS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL ADDITION AND DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | — | Sep 17, 2021 |
| COM2021 | SCOPE OF WORK INCLUDES: REMOVE EXISTING DETERIORATED ROOF AND FLOORS. NEW FLOOR FRAMING - 2X10 JOISTS, NEW ROOF FRAMING-2X8 RAFTERS, NEW INTERIOR WALLS WITH 1/2'' DRYWALL AND 2X4 FRAMING, NEW 3/4'' WOOD FLOOR SHEATHING, NEW STAIRS W/ 7 3/4'' MAX RISE AND 10'' DEEP TREADS, NEW ROOF WITH 5/8'' ROOF SHEATHING AND ROOF MEMBRANE, NEW WINDOWS AND EXTERIOR DOORS IN EXSITING OPENINGS, CONSTRUCT REAR 1 STORY ADDITION (16' X 11') WITH CMU FOUNDATION, CONCRETE FOOTING, 2X6 EXTERIOR WALLS WITH 16'X11' DECK OVER REAR ADDITION. INSTALL 36'' HIGH GUARD. INSTALL NEW CABINETS AND TRIM AND FINISHES THROUGHOUT. RESTORE CORNICE, REPOINT BRICK, GUTTERS AND DOWNSPOUTS, BASEMENT EXCAVATION AND UNDERPINNING BY OTHERS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES, 5. ALL ADDITION AND DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND MAINTAIN ALL PROPER SETBACKS) | $175,000 | Jun 28, 2021 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 7, 2026 · 119 m · 701 N MADEIRA ST
- violation: SW-Dirty AlleyJul 6, 2026 · 130 m
- violation: SW-Dirty AlleyJul 6, 2026 · 134 m · 2301 ASHLAND AVE
- violation: HCD-Maintenance StructureJul 6, 2026 · 145 m · 2218 E MONUMENT ST
- violation: SW-Dirty AlleyJul 2, 2026 · 45 m · 803 N COLLINGTON AVE
- violation: HCD-Vacant BuildingJul 2, 2026 · 116 m · 712 N COLLINGTON AVE
- violation: HCD-Vacant BuildingJul 2, 2026 · 116 m · 712 N COLLINGTON AVE
- permit: BRCMJul 1, 2026 · 121 m · 845 N PATTERSON PARK AVE
- permit: BRCMJul 1, 2026 · 121 m · 845 N PATTERSON PARK AVE
- violation: HCD-CCE Building Permit ComplaintJul 1, 2026 · 137 m · 2306 E MADISON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.