Baltimore City · 21205

624 N KENWOOD AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$40,000
Land use
Residential (R)
Year built
1915
Last sale
Sep 16, 2025

Assessment

OwnerHOPE DEVELOPMENT COMPANY INC
Land useResidential (R)
Total assessment$40,000 (cycle 2026)
Last saleSep 16, 2025 — $50,000
Year built1915
ZoningR-8
Vacant

Permits

5
TypeDescriptionCostIssued
BRCMREPLACE BRICK CORNICE IN KIND AS PER CODE$2,500May 8, 2026
BRCMComplete duct work, run vent for bath rooms and dryer vent, installl 80,000 BTU gas force air furnace and 3 ton air condition system.$9,000Mar 19, 2026
BRCMwater heater, 7 fixtures total- Full plumbing rehab 1.5 bathroom, waste and water and kitchen with gas for stove 30k, furnace 80k, gas test, and dryer$10,000Mar 13, 2026
BRCMUpgrade service to 150 amps. Rewire house to code. Install 14 new circuits. Install 65 new devices and fixtures. Install interconnected smoke / co2 detectors as per code.$8,500Feb 10, 2026
BRCMExterior (Total square footage 656, total cost $13,075) Remove and replace 9 windows with same size and in same locations (116 sq. ft., $4,275). At 1st floor front, rear & basement entries, replace doors with same size and in same locations (60 sq. ft., $5,800). At rear façade, replace existing aluminum siding with vinyl siding (480 sq. ft., $3,000). Interior (Total square footage 1,000, total cost $72,249) At 1st and 2nd floors, remove all interior partitions, wall and ceiling finishes (1,000 sq. ft. $9,800). At interior 1st & 2nd floor front and rear walls, frame with 2x4 framing and install R-21 insulation. At 2nd floor ceiling, install R-49 insulation. At 1st floor, frame out walls to create new 1/2 bath 48 lf. At 2nd floor, frame out new walls to create new front and rear bedrooms with closets, study & bath as per drawing and per code. Install 1/2" drywall at all 1st & 2nd floor walls and ceilings. Install 6-interior pre-hung doors with hardware. At all windows, install drywall returns with 1x sills & aprons and new 5 1/2" speed base at all walls. At 1st floor, install new vinyl plank flooring and carpet at steps to 2nd floor, bedrooms & hall. At 2nd floor bathroom, install ceramic tile at tub area & floor. At kitchen, install 13 linear feet of base cabinets & 14 linear feet. of wall cabinets with countertops. Separate permit will be required for electrical, mechanical, and plumbing work. As per plans and as per code. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.$85,324Feb 5, 2026

Violations

2
KindCategoryStatusDate
service_requestHCD-CCE Building InspectionsClosedMar 26, 2026
service_requestHCD-CCE Building Permit ComplaintClosedMar 26, 2026

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.