Baltimore City · 21213

1804 N BOND ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$13,133
Land use
Residential (R)
Year built
1913
Last sale
Oct 28, 2020

This owner holds 2 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerBE MORE DEVELOPERS LLC
Land useResidential (R)
Total assessment$13,133 (cycle 2026)
Last saleOct 28, 2020 — $12,000
Year built1913
ZoningR-8
VacantYes

Permits

9
TypeDescriptionCostIssued
BRCMReconstruction of the water and waste and gas, for (14) plumbing fixtures- 4-toilets, 4-bathroom sinks, 2-bathtubs, 1-shower, 1-kitchen sink, 1-laundry box,1-electric water heater 1-80000 btu, 1-45000 Stove range btu units. As Per Code$252Jan 12, 2026
COM2024SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: INSTALLATION OF 400 SQ FT OF DRYWALL, 5 INTERIOR DOORS, 5 WINDOWS, 2 EXTERIOR DOORS, *WINDOWS AND DOORS IN THE SAME SIZE AND LOCATION, AS PER CODE*********** AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS AND DOORS SHALL COMPLY WITH THE REGULATIONS ON PAGE 40 OF THE OLIVER URBAN RENEWAL PLAN. THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY. "ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THEIR HISTORIC CONTEXT. SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. • REPLACEMENT WINDOWS MUST USE THE ENTIRE EXISTING OPENING. WOOD IS PREFERRED AS REPLACEMENT MATERIAL, VINYL IS ACCEPTABLE. • SELECTING CORRECT REPLACEMENT WINDOWS IS KEY TO MAINTAINING THE ARCHITECTURAL INTEGRITY OF THE NEIGHBORHOOD. REPLACEMENT WINDOWS SHOULD MATCH THE HISTORIC WINDOWS THEY ARE REPLACING, IN PATTERN, MULLION AND FRAME SIZE. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS. IF NECESSARY TO ENLARGE AN OPENING, THE ENTIRE MASONRY OPENING, DOOR AND TRANSOMS MUST BE ENLARGED. THE OPENING MUST BE CUT CLEANLY AND FINISHED AS APPROPRIATE. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARDED. • ENCLOSURES OR SECURITY GRILLES AND SCREENS SHOULD BE AS INCONSPICUOUS AS POSSIBLE AND COMPATIBLE WITH OTHER ELEMENTS OF THE FAÇADE. SOLID OR PERFORATED METAL SECURITY DEVICES ARE NOT PERMITTED. • DORMER WINDOWS ON ROOFS SLOPING TOWARD THE STREET SHALL BE RETAINED AND REPAIRED OR REPLACED IN AN APPROPRIATE MANNER TO PRESERVE THEIR ORIGINAL ARCHITECTURAL DESIGN. • SPECIAL WINDOWS, SUCH AS BAYS, BOXES AND DORMERS, SHOULD BE REFURBISHED WHEN POSSIBLE, AND WHEN NECESSARY REPLACED WITH QUALITY FACSIMILES. • HISTORIC WOOD FRONT DOORS MAY BE REPLACED WITH STEEL DOORS, BUT MUST HARMONIZE WITH THE HISTORIC CONTEXT. BOTH WOOD AND METAL DOORS SHOULD HAVE A PANELIZED APPEARANCE. GLAZING IS ENCOURAGED. "Jul 3, 2025
BRCMReconstruction of the water and waste for 3-toilets, 3-lav’s, 2-showers, 1-bathtubs, 1- Laundry box, 1-kitchen sink, 1-electric water heater as per code.$252Mar 12, 2025
COM2024INSTALL (24) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (40) # FIXTURES/DEVICES AS PER CODE.$2,000May 7, 2024
COM2023INSTALL (10) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION, NEW INTERIOR, (1) # WATER SERVICE PIPE, NEW INTERIOR AS PER CODE.$252Nov 3, 2023
COM2023INSTALL (1) 42000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS), (1) 100000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.$1,000Jan 25, 2023
COM2022INSTALL 12 WINDOWS AND 2 EXTERIOR DOORS SAME SIZE AND LOCATION AS PER CODE*** PER PLANNING DEPT: REPLACEMENT WINDOWS AND DOORS MUST COMPLY WITH OLIVER URBAN RENEWAL PLAN PAGE 38 ''ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THEIR HISTORIC CONTEXT. SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. • REPLACEMENT WINDOWS MUST USE THE ENTIRE EXISTING OPENING. WOOD IS PREFERRED AS REPLACEMENT MATERIAL, VINYL IS ACCEPTABLE. • SELECTING CORRECT REPLACEMENT WINDOWS IS KEY TO MAINTAINING THE ARCHITECTURAL INTEGRITY OF THE NEIGHBORHOOD. REPLACEMENT WINDOWS SHOULD MATCH THE HISTORIC WINDOWS THEY ARE REPLACING, IN PATTERN, MULLION AND FRAME SIZE. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS. IF NECESSARY TO ENLARGE AN OPENING, THE ENTIRE MASONRY OPENING, DOOR AND TRANSOMS MUST BE ENLARGED. THE OPENING MUST BE CUT CLEANLY AND FINISHED AS APPROPRIATE. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARD***$2,500Dec 30, 2022
COM2022INSTALL 200 SQ FT OF DRYWALL, INSTALL 12 WINDOWS, 6 INTERIOR DOORS, 2 EXTERIOR DOORS SAME SIZE AND LOCATION AS PER CODE$3,000Apr 22, 2022
COM2021SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF NON-STRUCTURAL WALLS AND CEILINGS AND REMOVAL OF ALL ASSOCIATED DEBRIS, FURRING (325 SQ FT) OF PERIMETER WALL (NO NEW PARTITION WALLS TO BE BUILT), INSTALL 10 INTERIOR DOORS SAME SIZE AND LOCATION, INSTALL NEW DRYWALL, TRIM, PAINT ENTIRE INTERIOR, NEW KITCHEN CABINETS AND COUNTER TOPS, NEW CERAMIC TILE FLOORING, 3/4 PLYWOOD FLOORING, AND WOOD FLOORING AND NEW CARPET, INSTALL 10 VINYL WINDOWS SAME SIZE AND LOCATION, INSTALL 2 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK$35,000May 19, 2021

Violations

1
KindCategoryStatusDate
vacant_building_noticeVacantopenFeb 8, 2021

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.