Baltimore City · 21213
1711 E LANVALE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $27,000
- Land use
- Residential (R)
- Year built
- 1910
- Last sale
- Sep 10, 2020
Assessment
| Owner | LIBERTY BELL CAPITAL, LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $27,000 (cycle 2026) |
| Last sale | Sep 10, 2020 — $12,000 |
| Year built | 1910 |
| Zoning | R-8 |
| Vacant | Yes |
Permits
14| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | Install two hundred amp service and install twenty five electrical circuits | $3,000 | Jun 24, 2026 |
| BRCM | ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN) WITH RAILING SYSTEM (36"MIN HEIGHT/4" MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation | $30,000 | Mar 12, 2026 |
| COM2024 | Extend Original Permit.(original permit:COM2021-58677:APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN) WITH RAILING SYSTEM (36"MIN HEIGHT/4" MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36"MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING)) Original Permit Description:(COM2021-58677) APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9"MIN, RISE: 8 1/4"MAX AND WIDTH: 36"MIN) WITH RAILING SYSTEM (36"MIN HEIGHT/4" MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36"MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING) | — | Oct 22, 2024 |
| COM2024 | INSTALL (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (10) # PLUMBING FIXTURES AS PER CODE. | $3,000 | Sep 24, 2024 |
| COM2024 | AA CONV: Full Description Loaded as Comment | — | Apr 22, 2024 |
| COM2023 | AA CONV: Full Description Loaded as Comment | — | Oct 19, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2021-58677:APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING)) Original Permit Description:(COM2021-58677) APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING) | — | Mar 31, 2023 |
| COM2023 | INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $50,000 | Mar 29, 2023 |
| COM2022 | Extend Original Permit.(original permit:COM2021-58677:APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING)) Original Permit Description:(COM2021-58677) APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING) | — | Oct 5, 2022 |
| COM2022 | AA CONV: Full Description Loaded as Comment | — | Apr 1, 2022 |
| COM2021 | Extend Original Permit.(original permit:COM2021-58677:APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING)) Original Permit Description:(COM2021-58677) APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING) | — | Sep 24, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2021-52006:SCOPE OF WORK:----INTERIOR ALTERATIONS---INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL, INSTALL NEW INSULATION (IF INSTALLED IN THE WALLS-R20/IF INSTALLED IN THE CEILINGS-R49), INSTALL NEW FLOORS, INSTALL NEW BASEBOARDS, INSTALL, INSTALL NEW KITCHEN BATHROOM FRAMING (NO NEW PARTITION WALLS TO BE BUILT), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK TO BE DONE APPROVED FOR WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE) Original Permit Description:(COM2021-52006) SCOPE OF WORK:----INTERIOR ALTERATIONS---INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL, INSTALL NEW INSULATION (IF INSTALLED IN THE WALLS-R20/IF INSTALLED IN THE CEILINGS-R49), INSTALL NEW FLOORS, INSTALL NEW BASEBOARDS, INSTALL, INSTALL NEW KITCHEN BATHROOM FRAMING (NO NEW PARTITION WALLS TO BE BUILT), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK TO BE DONE APPROVED FOR WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE | — | Jul 26, 2021 |
| COM2021 | APWC: ALL REPLACEMENT WINDOWS, DOORS AND ROOF SHALL BE DONE IN ACCORDANCE WITH THE DESIGN GUIDELINES FOR RESIDENTIAL PROPERTY REHABILITATION IN THE BROADWAY EAST URP.SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY III): INSTALL 2X4 FRAMING AT 16 INCHES ON CENTER FOR INTERIOR PARTITION WALLS, INSTALL 2X10 FLOOR JOISTS @16 INCHES ON CENTER WITHIN EXISTING POCKETS, INSTALL NEW STAIRCASE (STAIRCASE PARAMETERS: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), INSTALL STRUCTURAL INFILL AT THE STAIRCASE WITH 3 FOOT HIGH HANDRAIL ON FIRST AND SECOND FLOOR, INSTALL DRYWALL, TRIM, 14 DOORS AND INSTALL NEW KITCHEN CABINETS, INSTALL 2X10 ROOF JOISTS @ 24 INCHES ON CENTER, INSTALL NEW FINISHES, INSTALL NEW INSULATION (R20WALLS/R49CEILINGS), EXTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW RUBBER ROOFING, INSTALL 8'X10' REAR DECK WITH STEPS (STAIRCASE: TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN) WITH RAILING SYSTEM (36''MIN HEIGHT/4'' MAX SPACING), REPLACE 12 WINDOWS SAME SIZE AND LOCATION AND 3 EXTERIOR DOORS SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN WIDTH OF 36''MINIMUM, 3. ALL BEDROOMS WILL MAINTAIN 70 SQ/FT FOR ONE OCCUPANT OR 50 SQ/FT PER OCCUPANT, 4. ALL DECK CONSTRUCTION WILL BE DONE WITHIN PRIVATE PROPERTY LINES AND DECK WILL BE PROPERLY SECURED TO THE BUILDING) | $18,000 | Mar 26, 2021 |
| COM2021 | SCOPE OF WORK:----INTERIOR ALTERATIONS---INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL, INSTALL NEW INSULATION (IF INSTALLED IN THE WALLS-R20/IF INSTALLED IN THE CEILINGS-R49), INSTALL NEW FLOORS, INSTALL NEW BASEBOARDS, INSTALL, INSTALL NEW KITCHEN BATHROOM FRAMING (NO NEW PARTITION WALLS TO BE BUILT), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK TO BE DONE APPROVED FOR WORK ONLY SUBJECT TO THE PERMITTED USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZONING ORDINANCE | $35,000 | Jan 26, 2021 |
Violations
1| Kind | Category | Status | Date |
|---|---|---|---|
| vacant_building_notice | Vacant | open | Dec 3, 2020 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 9, 2026 · 73 m · 1732 E LANVALE ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 118 m · 1612 N BROADWAY
- violation: SW-HGWJul 7, 2026 · 129 m · 1636 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 132 m · 1634 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 136 m · 1632 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 136 m · 1637 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 140 m · 1630 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 143 m · 1633 LANSING AVE
- violation: SW-HGWJul 7, 2026 · 143 m · 1628 LANSING AVE
- violation: HCD-Sanitation PropertyJul 7, 2026 · 147 m · 1513 N REGESTER ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.