Baltimore City · 21213

1742 LLEWELYN AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$240,000
Land use
Residential (R)
Year built
1920
Last sale
Mar 8, 2019

This owner holds 2 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerFRANKLIN ALLEY BUILDERS, LLC
Land useResidential (R)
Total assessment$240,000 (cycle 2026)
Last saleMar 8, 2019 — $4,500
Year built1920
ZoningR-8
Vacant

Permits

13
TypeDescriptionCostIssued
BUSEUse as a single-family dwelling.Oct 6, 2025
COM2024AA CONV: Full Description Loaded as CommentSep 19, 2024
COM2024INSTALL (1) # ELECTRIC WATER HEATER, (1) 40000 BTU FUEL-BURNING EQUIP, (11) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (CAP OFF), (1) # WATER SERVICE PIPE (OTHER THAN 1-2 FAM. RES.), (1) # GAS TEST AS PER CODE.$4,000Sep 4, 2024
COM2024REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-80218:INSTALL (11) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-80218) INSTALL (11) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE.Jul 24, 2024
COM2024INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 75 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ), (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.$5,000Jun 13, 2024
COM2024INSTALL (1) 150 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (22) # BRANCH CIRCUITS/FEEDERS AS PER CODE.$3,500Jun 13, 2024
COM2024AA CONV: Full Description Loaded as CommentMar 14, 2024
COM2023SCOPE OF WORK: REISSUANCE OF PREVIOUS PERMITTED WORK: INTERIOR ALTERATIONS OF 900 SQUARE FEET OF LEVEL II ALTERATIONS IN THE FIRST AND SECOND FLOOR AND THE BASEMENT, AS PER PLANS. NEW FRAMINGS, DRYWALL, TRIMS, R-21 WALL INSULATION, NEW ROOF DECKING WITH R-49 INSULATION. INSTALL 2 EXTERIOR DOORS, REMOVE, AND REPLACE 8 INTERIOR DOORS, REMOVE, AND REPLACE 8 WINDOWS SAME SIZE AND LOCATION. UPDATE STAIRS TREADS AT 10 ¼”, RISERS AT 8” MAX, STRINGERS HANDRAILS AND BALUSTERS AT 4” OR LESS. UPGRADE KITCHEN & BATHROOMS. UPGRADE FLOORING WITH HARDWOOD, VCT - TILES, CARPETING; CEILING, PAINTING, AND CLEANING AS REQUIRED. INSTALLATION OF NEW ROOFING MATERIALS, GUTTERS, FINISHES, *NOT APPROVING FOR REPOINT OF BRICK SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORKS. ALL WORKS AS PER BUILDING CODE AND PER SUBMITTED PLANS. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES), *PLANS PREVIOUSLY APPROVED ON PERMIT COM2022-56549 ISSUED ON 04.26.2022***************** AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS AND DOORS SHALL COMPLY WITH BROADWAY EAST URBAN RENEWAL PLAN PAGE 21 ''ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THEIR HISTORIC CONTEXT. SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. • REPLACEMENT WINDOWS MUST USE THE ENTIRE EXISTING OPENING. WOOD IS PREFERRED AS REPLACEMENT MATERIAL, VINYL IS ACCEPTABLE. • SELECTING CORRECT REPLACEMENT WINDOWS IS KEY TO MAINTAINING THE ARCHITECTURAL INTEGRITY OF THE NEIGHBORHOOD. REPLACEMENT WINDOWS SHOULD MATCH THE HISTORIC WINDOWS THEY ARE REPLACING, IN PATTERN, MULLION AND FRAME SIZE. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS. IF NECESSARY TO ENLARGE AN OPENING, THE ENTIRE MASONRY OPENING, DOOR AND TRANSOMS MUST BE ENLARGED. THE OPENING MUST BE CUT CLEANLY AND FINISHED AS APPROPRIATE. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARDED. • ENCLOSURES OR SECURITY GRILLES AND SCREENS SHOULD BE AS INCONSPICUOUS AS POSSIBLE AND COMPATIBLE WITH OTHER ELEMENTS OF THE FAÇADE. SOLID OR PERFORATED METAL SECURITY DEVICES ARE NOT PERMITTED. • DORMER WINDOWS ON ROOFS SLOPING TOWARD THE STREET SHALL BE RETAINED AND REPAIRED OR REPLACED IN AN APPROPRIATE MANNER TO PRESERVE THEIR ORIGINAL ARCHITECTURAL DESIGN. • SPECIAL WINDOWS, SUCH AS BAYS, BOXES AND DORMERS, SHOULD BE REFURBISHED WHEN POSSIBLE, AND WHEN NECESSARY REPLACED WITH QUALITY FACSIMILES. • HISTORIC WOOD FRONT DOORS MAY BE REPLACED WITH STEEL DOORS, BUT MUST HARMONIZE WITH THE HISTORIC CONTEXT. BOTH WOOD AND METAL DOORS SHOULD HAVE A PANELIZED APPEARANCE. GLAZING IS ENCOURAGED. ''$100,000Sep 26, 2023
COM2022 Extend Original Permit.(original permit:COM2022-59814:SCOPE OF WORK:----INTERIOR ALTERATIONS---CONSTRUCTION RENOVATION AND UNDERPINNING TO REINFORCE THE EXISTING FOUNDATION STRUCTURE, BY EXTENDING THE DEPTH AND BREADTH TO INCREASE THE HEADROOM FROM 5 FEET TO 7 FEET AS WELL AS ENHANCE LIVING SPACE. AS PER PLANS AND AS PER CODE. ) Original Permit Description:(COM2022-59814) SCOPE OF WORK:----INTERIOR ALTERATIONS---CONSTRUCTION RENOVATION AND UNDERPINNING TO REINFORCE THE EXISTING FOUNDATION STRUCTURE, BY EXTENDING THE DEPTH AND BREADTH TO INCREASE THE HEADROOM FROM 5 FEET TO 7 FEET AS WELL AS ENHANCE LIVING SPACE. AS PER PLANS AND AS PER CODE. Nov 3, 2022
COM2022 Extend Original Permit.(original permit:COM2022-56549:INTERIOR ALTERATIONS OF 900 SQUARE FEET OF LEVEL II ALTERATIONS IN THE FIRST AND SECOND FLOOR AND THE BASEMENT, AS PER PLANS. NEW FRAMINGS, DRYWALL, TRIMS, R-21 WALL INSULATION, NEW ROOF DECKING WITH R-49 INSULATION. INSTALL 2 EXTERIOR DOORS, REMOVE, AND REPLACE 8 INTERIOR DOORS, REMOVE, AND REPLACE 8 WINDOWS SAME SIZE AND LOCATION. UPDATE STAIRS TREADS AT 10 ¼”, RISERS AT 8” MAX, STRINGERS HANDRAILS AND BALUSTERS AT 4” OR LESS. UPGRADE KITCHEN & BATHROOMS. UPGRADE FLOORING WITH HARDWOOD, VCT - TILES, CARPETING; CEILING, PAINTING, AND CLEANING AS REQUIRED. INSTALLATION OF NEW ROOFING MATERIALS, GUTTERS, FINISHES, *NOT APPROVING FOR REPOINT OF BRICK SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORKS. ALL WORKS AS PER BUILDING CODE AND PER SUBMITTED PLANS. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2022-56549) INTERIOR ALTERATIONS OF 900 SQUARE FEET OF LEVEL II ALTERATIONS IN THE FIRST AND SECOND FLOOR AND THE BASEMENT, AS PER PLANS. NEW FRAMINGS, DRYWALL, TRIMS, R-21 WALL INSULATION, NEW ROOF DECKING WITH R-49 INSULATION. INSTALL 2 EXTERIOR DOORS, REMOVE, AND REPLACE 8 INTERIOR DOORS, REMOVE, AND REPLACE 8 WINDOWS SAME SIZE AND LOCATION. UPDATE STAIRS TREADS AT 10 ¼”, RISERS AT 8” MAX, STRINGERS HANDRAILS AND BALUSTERS AT 4” OR LESS. UPGRADE KITCHEN & BATHROOMS. UPGRADE FLOORING WITH HARDWOOD, VCT - TILES, CARPETING; CEILING, PAINTING, AND CLEANING AS REQUIRED. INSTALLATION OF NEW ROOFING MATERIALS, GUTTERS, FINISHES, *NOT APPROVING FOR REPOINT OF BRICK SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORKS. ALL WORKS AS PER BUILDING CODE AND PER SUBMITTED PLANS. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)Nov 3, 2022
COM2022INSTALL (11) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 80000 BTU FUEL-BURNING EQUIP AS PER CODE.$1,100Sep 9, 2022
COM2022SCOPE OF WORK:----INTERIOR ALTERATIONS---CONSTRUCTION RENOVATION AND UNDERPINNING TO REINFORCE THE EXISTING FOUNDATION STRUCTURE, BY EXTENDING THE DEPTH AND BREADTH TO INCREASE THE HEADROOM FROM 5 FEET TO 7 FEET AS WELL AS ENHANCE LIVING SPACE. AS PER PLANS AND AS PER CODE. $12,000Apr 26, 2022
COM2022INTERIOR ALTERATIONS OF 900 SQUARE FEET OF LEVEL II ALTERATIONS IN THE FIRST AND SECOND FLOOR AND THE BASEMENT, AS PER PLANS. NEW FRAMINGS, DRYWALL, TRIMS, R-21 WALL INSULATION, NEW ROOF DECKING WITH R-49 INSULATION. INSTALL 2 EXTERIOR DOORS, REMOVE, AND REPLACE 8 INTERIOR DOORS, REMOVE, AND REPLACE 8 WINDOWS SAME SIZE AND LOCATION. UPDATE STAIRS TREADS AT 10 ¼”, RISERS AT 8” MAX, STRINGERS HANDRAILS AND BALUSTERS AT 4” OR LESS. UPGRADE KITCHEN & BATHROOMS. UPGRADE FLOORING WITH HARDWOOD, VCT - TILES, CARPETING; CEILING, PAINTING, AND CLEANING AS REQUIRED. INSTALLATION OF NEW ROOFING MATERIALS, GUTTERS, FINISHES, *NOT APPROVING FOR REPOINT OF BRICK SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORKS. ALL WORKS AS PER BUILDING CODE AND PER SUBMITTED PLANS. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)$100,000Apr 26, 2022

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.