Baltimore City · 21213

1118 RUTLAND AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$90,800
Land use
Residential (R)
Year built
1890
Last sale
Jan 29, 2013

This owner holds 5 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerBAYLOR II, BENJAMIN
Land useResidential (R)
Total assessment$90,800 (cycle 2026)
Last saleJan 29, 2013
Year built1890
ZoningR-8
Vacant

Permits

9
TypeDescriptionCostIssued
USE2024USE AS A SINGLE-FAMILY DWELLING.Nov 20, 2024
COM2024 Extend Original Permit.(original permit:COM2024-55878:INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 70 CFM EXHAUST SYSTEMS , (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2024-55878) INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 70 CFM EXHAUST SYSTEMS , (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.Oct 13, 2024
COM2024 Extend Original Permit.(original permit:COM2024-52008:INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 150 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.) Original Permit Description:(COM2024-52008) INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 150 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.Oct 4, 2024
COM2024 Extend Original Permit.(original permit:COM2024-50868:INSTALL (13) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2024-50868) INSTALL (13) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.Oct 3, 2024
COM2024AA CONV: Full Description Loaded as CommentMay 6, 2024
COM2024INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 70 CFM EXHAUST SYSTEMS , (1) 70000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.$5,000Feb 23, 2024
COM2024INSTALL (25) # BRANCH CIRCUITS/FEEDERS , (1) 150 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.$500Jan 26, 2024
COM2024INSTALL (13) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.$4,700Jan 9, 2024
COM2023FRAME NEW PARTITION WALLS AS PER FLOOR PLANS. INTERIOR WALLS 2X4, EXTERIOR WALLS 2X6 WITH R21 INSULATION. REPLACE STAIRCASES, SAME SIZE AND LOCATION WITH RISE NO GREATER THAN 8'' AND RUN NO LESS THAN 9''. REPLACE FRAMING ON REAR AS NEEDED. REPLACE WINDOWS AND EXTERIOR DOORS, SAME SIZE AND LOCATION. PAD EXISTING ROOF FRAMING AS NEEDED FOR R-49 INSULATION WHERE IT MEETS BRICK PARTY WALLS OR WILL EXTEND OVER EXTERIOR WALLS AND R-49 WHERE IT CANNOT. USE EXISTING SUBFLOOR WHERE SUITABLE, REPLACE WITH 3/4'' TONGUE AND GROOVE SHEATHING AS NEEDED. INSTALL 1/2'' DRYWALL ON ALL FRAMED WALLS AND CEILINGS; INSTALL X INTERIOR DOORS, VANITY CABINETS, KITCHEN CABINETS AND COUNTERS AND NEW PAINT AND FLOORING THROUGHOUT****************** AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS AND DOORS SHALL COMPLY WITH THE REGULATIONS ON PAGE 20 OF THE MIDDLE EAST URBAN RENEWAL PLAN. THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY. ''• ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THE EXISTING STRUCTURE. • SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. ALL BROKEN AND MISSING WINDOWS SHALL BE REPLACED. ALL EXPOSED WOOD SHALL BE REPAIRED AND PAINTED. • REPLACEMENT WINDOWS AND DOORS MUST BE OF THE SAME SIZE AND SHAPE OF THE EXISTING OPENING AND FIT WITHIN THE STRUCTURE’S EXISTING, ORIGINAL OPENINGS. WINDOWS AND DOORS THAT ARE FABRICATED WITH DIMENSIONS LESSER THAN THE STRUCTURE’S EXISTING OPENINGS ARE NOT ALLOWED TO BE INSTALLED WITH PANEL SURROUNDS THAT SERVE TO ALTER EXISTING, ORIGINAL OPENINGS. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS OR UNLESS SUBMITTED CONSTRUCTION DOCUMENTS ILLUSTRATE THE NEW ENLARGED OPENINGS AS A COMPONENT OF THE COMPREHENSIVE DESIGN FOR THE STRUCTURE OR STRUCTURES. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARDED UNLESS OTHERWISE REQUIRED BY THE BALTIMORE CITY CODE • DORMER WINDOWS ON ROOFS SLOPING TOWARD THE STREET SHALL BE RETAINED AND REPAIRED OR REPLACED IN AN APPROPRIATE MANNER TO PRESERVE THEIR ORIGINAL ARCHITECTURAL DESIGN. • SPECIAL WINDOWS, SUCH AS BAYS, BOXES AND DORMERS, MUST BE REFURBISHED UNLESS THEIR CONDITION SHOWS THAT THEY ARE BEYOND REPAIR.'' $40,000Nov 16, 2023

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.