Baltimore City · 21213
1411 N PATTERSON PARK AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $49,333
- Land use
- Residential (R)
- Year built
- 1910
- Last sale
- Jul 7, 2023
Assessment
| Owner | WASHINGTON HILL DESIGN ASSOCIATES |
|---|---|
| Land use | Residential (R) |
| Total assessment | $49,333 (cycle 2026) |
| Last sale | Jul 7, 2023 — $73,880 |
| Year built | 1910 |
| Zoning | R-8 |
| Vacant | — |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | AMEND PERMIT: CHANGE PLUMBER AND GAS CONTRACTOR . REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2024-55419:INSTALL (10) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (3) 60 BTU FUEL-BURNING EQUIP, (1) # GAS TEST AS PER CODE.) | — | Feb 17, 2025 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2024-52147:SCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ------- : INTERIOR DEMOLITION (CATEGORY I): INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT), INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS. ------ EXTERIOR ALTERATIONS ------ INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, ******** *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK ********* AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS SHALL COMPLY WITH REGULATIONS ON PAGE 21 OF THE BROADWAY EAST URBAN RENEWAL PLAN AND THE SIZE OF THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY "ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THEIR HISTORIC CONTEXT. SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. • REPLACEMENT WINDOWS MUST USE THE ENTIRE EXISTING OPENING. WOOD IS PREFERRED AS REPLACEMENT MATERIAL, VINYL IS ACCEPTABLE. • SELECTING CORRECT REPLACEMENT WINDOWS IS KEY TO MAINTAINING THE ARCHITECTURAL INTEGRITY OF THE NEIGHBORHOOD. REPLACEMENT WINDOWS SHOULD MATCH THE HISTORIC WINDOWS THEY ARE REPLACING, IN PATTERN, MULLION AND FRAME SIZE. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS. IF NECESSARY TO ENLARGE AN OPENING, THE ENTIRE MASONRY OPENING, DOOR AND TRANSOMS MUST BE ENLARGED. THE OPENING MUST BE CUT CLEANLY AND FINISHED AS APPROPRIATE. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARDED. • ENCLOSURES OR SECURITY GRILLES AND SCREENS SHOULD BE AS INCONSPICUOUS AS POSSIBLE AND COMPATIBLE WITH OTHER ELEMENTS OF THE FAÇADE. SOLID OR PERFORATED METAL SECURITY DEVICES ARE NOT PERMITTED. • DORMER WINDOWS ON ROOFS SLOPING TOWARD THE STREET SHALL BE RETAINED AND REPAIRED OR REPLACED IN AN APPROPRIATE MANNER TO PRESERVE THEIR ORIGINAL ARCHITECTURAL DESIGN. • SPECIAL WINDOWS, SUCH AS BAYS, BOXES AND DORMERS, SHOULD BE REFURBISHED WHEN POSSIBLE, AND WHEN NECESSARY REPLACED WITH QUALITY FACSIMILES. • HISTORIC WOOD FRONT DOORS MAY BE REPLACED WITH STEEL DOORS, BUT MUST HARMONIZE WITH THE HISTORIC CONTEXT. BOTH WOOD AND METAL DOORS SHOULD HAVE A PANELIZED APPEARANCE. GLAZING IS ENCOURAGED.") | — | Feb 10, 2025 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2024-58831:INSTALL (24) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (40) # FIXTURES/DEVICES, (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 100 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE.) Original Permit Description:(COM2024-58831) INSTALL (24) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (40) # FIXTURES/DEVICES, (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 100 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | — | Jan 28, 2025 |
| COM2024 | INSTALL (24) # BRANCH CIRCUITS/FEEDERS , (2) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (40) # FIXTURES/DEVICES, (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 100 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $2,500 | Mar 22, 2024 |
| COM2024 | INSTALL (10) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (3) 60 BTU FUEL-BURNING EQUIP, (1) # GAS TEST AS PER CODE. | $6,000 | Feb 16, 2024 |
| COM2024 | SCOPE OF WORK: ------ INTERIOR/EXTERIOR ALTERATIONS ------- : INTERIOR DEMOLITION (CATEGORY I): INSTALL NEW KITCHEN, NEW HARDWOOD FLOORING, INSTALL NEW DRYWALL, PAINT THE ENTIRE HOUSE, INSTALL NEW 6 WINDOWS SAME SIZE AND PLACE, REPLACE 2 EXTERIOR DOORS SAME SIZE AND PLACE, FURRING ON PERIMETER WALLS AND BULK HEADS (FRAMING USING 2X4 NO NEW PARTITION WALLS WILL BE BUILT), INSTALL R49 AND R21 INSULATION IN CEILING AND WALLS. ------ EXTERIOR ALTERATIONS ------ INSTALL NEW RUBBER ROOF (NO STRUCTURAL ALTERNATIONS TO THE ROOF). ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, ******** *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK ********* AS PER THE DEPARTMENT OF PLANNING: REPLACEMENT WINDOWS SHALL COMPLY WITH REGULATIONS ON PAGE 21 OF THE BROADWAY EAST URBAN RENEWAL PLAN AND THE SIZE OF THE WINDOW AND DOOR OPENINGS SHALL NOT BE ALTERED OR REDUCED IN SIZE IN ANY WAY ''ALL WINDOWS MUST BE TIGHT FITTING AND HAVE SASHES OF PROPER SIZE AND DESIGN FOR THEIR HISTORIC CONTEXT. SASHES WITH ROTTEN WOOD, BROKEN JOINTS, OR BROKEN OR LOOSE MULLIONS OR MUNTINS SHALL BE REPLACED. • REPLACEMENT WINDOWS MUST USE THE ENTIRE EXISTING OPENING. WOOD IS PREFERRED AS REPLACEMENT MATERIAL, VINYL IS ACCEPTABLE. • SELECTING CORRECT REPLACEMENT WINDOWS IS KEY TO MAINTAINING THE ARCHITECTURAL INTEGRITY OF THE NEIGHBORHOOD. REPLACEMENT WINDOWS SHOULD MATCH THE HISTORIC WINDOWS THEY ARE REPLACING, IN PATTERN, MULLION AND FRAME SIZE. • EXISTING MASONRY OPENINGS MAY NOT BE ENLARGED EXCEPT TO ACCOMMODATE CONTEMPORARY DOOR DIMENSIONS. IF NECESSARY TO ENLARGE AN OPENING, THE ENTIRE MASONRY OPENING, DOOR AND TRANSOMS MUST BE ENLARGED. THE OPENING MUST BE CUT CLEANLY AND FINISHED AS APPROPRIATE. • WINDOW AND DOOR OPENINGS IN THE FRONT OF THE BUILDING SHALL NOT BE FILLED OR BOARDED. • ENCLOSURES OR SECURITY GRILLES AND SCREENS SHOULD BE AS INCONSPICUOUS AS POSSIBLE AND COMPATIBLE WITH OTHER ELEMENTS OF THE FAÇADE. SOLID OR PERFORATED METAL SECURITY DEVICES ARE NOT PERMITTED. • DORMER WINDOWS ON ROOFS SLOPING TOWARD THE STREET SHALL BE RETAINED AND REPAIRED OR REPLACED IN AN APPROPRIATE MANNER TO PRESERVE THEIR ORIGINAL ARCHITECTURAL DESIGN. • SPECIAL WINDOWS, SUCH AS BAYS, BOXES AND DORMERS, SHOULD BE REFURBISHED WHEN POSSIBLE, AND WHEN NECESSARY REPLACED WITH QUALITY FACSIMILES. • HISTORIC WOOD FRONT DOORS MAY BE REPLACED WITH STEEL DOORS, BUT MUST HARMONIZE WITH THE HISTORIC CONTEXT. BOTH WOOD AND METAL DOORS SHOULD HAVE A PANELIZED APPEARANCE. GLAZING IS ENCOURAGED.'' | $20,000 | Jan 27, 2024 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 8, 2026 · 26 m · 2304 E HOFFMAN ST
- permit: BRCMJul 7, 2026 · 125 m · 1515 N PATTERSON PARK AVE
- violation: HCD-Illegal DumpingJul 6, 2026 · 111 m · 2400 E HOFFMAN ST
- violation: SW-HGWJul 6, 2026 · 144 m · 1501 N MADEIRA ST
- violation: SW-HGWJul 6, 2026 · 147 m · 1503 N MADEIRA ST
- violation: SW-Dirty AlleyJul 3, 2026 · 67 m · 2324 E HOFFMAN ST
- permit: BUSEJul 1, 2026 · 22 m · 2302 E HOFFMAN ST
- violation: HCD-Sanitation PropertyJun 30, 2026 · 67 m · 2324 E HOFFMAN ST
- violation: HCD-Sanitation PropertyJun 29, 2026 · 63 m · 2322 E HOFFMAN ST
- violation: SW-Dirty AlleyJun 27, 2026 · 96 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.