Baltimore City · 21213
2745 MURA ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $17,033
- Land use
- Residential (R)
- Year built
- 1941
- Last sale
- Feb 26, 2002
Assessment
| Owner | KOLBY REALTY, LLC. |
|---|---|
| Land use | Residential (R) |
| Total assessment | $17,033 (cycle 2026) |
| Last sale | Feb 26, 2002 — $12,000 |
| Year built | 1941 |
| Zoning | R-8 |
| Vacant | Yes |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | GAS TEST AND GROUND WORK | $200 | May 22, 2026 |
| BRCM | Replace 17 plumbing fixtures Replace 1 stove Replace 1 Furnace Replace 1 Electric water heater Replace 1 sanitary connection Replace 1 water service pipe | $4,000 | Dec 8, 2025 |
| BRCM | Install tile kitchen and baths, add laminate flooring throughout 1st and 2nd floors, frame partition walls, drywall and paint. Replace 12 windows same size and location. Replace 10 interior doors same size and location. Add insulation R-21 exterior walls, R-49 to exterior ceilings. Work is related to prior permit Com2024-70240. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. Separate permit will be required for electrical, mechanical, and plumbing work. As per plans and as per code. | $4,000 | Oct 22, 2025 |
| COM2024 | Extend Original Permit.(original permit:COM2024-75594:INSTALL (17) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 100000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2024-75594) INSTALL (17) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 100000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 27, 2025 |
| COM2024 | INSTALL (1) 36 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS , (1) 90 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $7,500 | Dec 5, 2024 |
| COM2024 | INSTALL (17) # PLUMBING FIXTURES, (1) # ELECTRIC WATER HEATER, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 100000 BTU FUEL-BURNING EQUIP, (1) 35000 BTU FUEL-BURNING EQUIP AS PER CODE. | $17,900 | Jul 25, 2024 |
| COM2024 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INSTALL TILE KITCHEN AND BATHS, FRAME PARTITION WALLS, DRYWALL, ADD KITCHEN CABINETS, REPLACE WINDOWS SAME SIZE AND LOCATION, REPLACE DOOR SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK | $2,500 | Jul 22, 2024 |
| COM2023 | INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $2,000 | Nov 19, 2023 |
| COM2023 | INSTALL (1) # GAS TEST, (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS , (1) 90000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $12,500 | Aug 15, 2023 |
| COM2023 | SCOPE OF WORK:-----INTERIOR ALTERATIONS-----INSTALL TILE AND HARDWOOD FLOORS, ADD KITCHEN CABINETS, ADD FRAMING FOR DRYWALL. AS PER CODE | $4,500 | May 12, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: REMOVING DRYWALL AND DROP CEILINGS AND REMOVAL OF ALL ASSOCIATED DEBRIS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY, SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS/TENANT FITOUT | $500 | Feb 7, 2023 |
Violations
3| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | BC 123.8.1 | P | $900 | $0 | Jan 30, 2023 |
| citation | BC 123.8.1 | P | $900 | $0 | Sep 28, 2022 |
| vacant_building_notice | Vacant | open | — | — | Jan 10, 2022 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 130 m · 1313 N KENWOOD AVE
- violation: HCD-Sanitation PropertyJul 7, 2026 · 18 m · 2737 MURA ST
- violation: HCD-Sanitation PropertyJul 7, 2026 · 50 m
- permit: BRCMJul 7, 2026 · 105 m · 2724 E PRESTON ST
- violation: HCD-Sanitation PropertyJul 6, 2026 · 99 m · 2708 MURA ST
- violation: PM 305.2.2Jul 6, 2026 · 139 m · 1315 N KENWOOD AVE
- violation: PM 305.1Jul 6, 2026 · 139 m · 1315 N KENWOOD AVE
- violation: SW-Dirty AlleyJul 6, 2026 · 147 m · 2732 E CHASE ST
- violation: SW-Dirty AlleyJul 3, 2026 · 136 m · 2700 E PRESTON ST
- violation: SW-Dirty AlleyJul 3, 2026 · 136 m · 2700 E PRESTON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.