Baltimore City · 21213

2400 E CHASE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$20,133
Land use
Residential (R)
Year built
1905
Last sale
Sep 4, 2025

Assessment

OwnerPRIMOS HOME IMPROVEMENT LLC
Land useResidential (R)
Total assessment$20,133 (cycle 2026)
Last saleSep 4, 2025 — $23,200
Year built1905
ZoningR-8
VacantYes

Permits

6
TypeDescriptionCostIssued
BRCM2 TOILETS, 2 SINKS, 1 BATHTUB 1 KITCHEN SINK, 1 LAUNDRY$2,500Jan 20, 2026
BRCMReplaced a 3 ton A/C unit gas furnace 92% 75.000 btu brand RUUD$3,000Jan 16, 2026
BRCMReplace bathroom fixtures 3 1 toilet 1 full shower 1 sink Repipe$2,000Jan 15, 2026
BRCMGAS FURNACE WATER HEATER STOVE$2,500Jan 7, 2026
BRCM******* Scope of Work: Comprehensive Interior and Exterior Renovation ********* SCOPE OF WORK PER BA-SCO-25-1419 ------ INTERIOR/EXTERIOR ALTERATIONS -------- - 1.0 Demolition & Preparation 1.1 Remove and dispose of all existing flooring throughout the residence CAT I DEMO. - 1.2 Gut existing full bathroom, half bathroom, and kitchen to prepare for remodeling CAT I DEMO. - 2.0 Interior Renovations 2.1 Kitchen: Furnish and install new kitchen cabinets, stove, and dishwasher. 2.2 Bathrooms: Complete remodel of one (1) full bathroom and one (1) half bathroom. - 2.3 Doors: Replace all interior doors, including jambs and hardware. - 2.4 Finishes: 2.4.1 Install new flooring throughout the residence. 2.4.2 Perform minor drywall repairs as required. 2.4.3 Prepare and paint all interior walls, ceilings, and trim. - 3.0 Exterior & Building Envelope 3.1 Replace all exterior doors, including frames and hardware. 3.2 Replace all existing windows. 3.3 Install a new handrail on the exterior staircase. AS PER CODE ********* SEPARATE PERMIT REQUIRED FOR MEP WORK : - 4.0 Mechanical Systems 4.1 Replace the existing furnace with a new unit. 4.2 Replace the existing water heater with a new unit ******* Repair existing unit to comply with citys building code. *****CHANGE OF SCOPE: Scope of Work: Comprehensive Interior and Exterior Renovation 1.0 Demolition & Preparation 1.1 Remove and dispose of all existing flooring throughout the residence. 1.2 Gut existing full bathroom, half bathroom, and kitchen to prepare for remodeling. 2.0 Interior Renovations 2.1 Kitchen: Furnish and install new kitchen cabinets, stove, and dishwasher. 2.2 Bathrooms: Complete remodel of one (1) full bathroom and one (1) half bathroom. 2.3 Doors: Replace all interior doors, including jambs and hardware. 2.4 Finishes: 2.4.1 Install new flooring throughout the residence. 2.4.2 Perform minor drywall repairs as required. 2.4.3 Prepare and paint all interior walls, ceilings, and trim. 3.0 Exterior & Building Envelope 3.1 Replace all exterior doors, including frames and hardware. 3.2 Replace all existing windows. 3.3 Install a new handrail on the exterior staircase. 4.0 Mechanical Systems 4.1 Replace the existing furnace with a new unit. 4.2 Replace the existing water heater with a new unit$40,000Dec 9, 2025
BRCMUpgrade electrical service from one hundred amps to 2 hundred amps$2,000Nov 19, 2025

Violations

2
KindCategoryStatusDate
service_requestSW-Dirty AlleyClosedJun 8, 2026
vacant_building_noticeVacantopenFeb 4, 2026

Inspections

1
TypeStatusDate
InitialNot FinishedJan 29, 2026

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.