Baltimore City · 21218
1731 MONTPELIER ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $100,067
- Land use
- Residential (R)
- Year built
- 1940
- Last sale
- May 30, 2023
Assessment
| Owner | ROBERTSON, FRANCINE |
|---|---|
| Land use | Residential (R) |
| Total assessment | $100,067 (cycle 2026) |
| Last sale | May 30, 2023 — $199,900 |
| Year built | 1940 |
| Zoning | R-6 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | Extend Original Permit.(original permit:COM2022-87454:INSTALL (14) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.) Original Permit Description:(COM2022-87454) INSTALL (14) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | — | May 17, 2023 |
| COM2023 | AMEND PERMIT: CHANGE GAS AND PLUMBING CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-86059:INSTALL (11) # LAWN IRRIGATION SYSTEM, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 50000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-86059) INSTALL (11) # LAWN IRRIGATION SYSTEM, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 50000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | May 1, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-78143:BASEMENT:ADD FULL BEDROOM(14'×13') AND FULL BATHROOM(5'×8') AND MECHANICAL CLOSET. FIRST FLOOR :REPLACE HALF BATHROOM, REPLACE FULL KITCHEN, REPLACE DAMAGE DRYWAL AND FLOOR. SECOND FLOOR:REPLACE FULL BATHROOM ,REPLACE DAMAGE DRYWAL AND 3 BEDROOM, REPLACE RAILINGS THE AISLE AND THE BLEACHERS SEPARATE PERMIT WILL BE REQUIREDF OR ELECTRICAL MECHANICAL AND PLUMBING WORK. APPROVED FOR WORK ONLY SUBJECT TO THE PERMIT USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZOONING ORDINANCE, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ.FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2022-78143) BASEMENT:ADD FULL BEDROOM(14'×13') AND FULL BATHROOM(5'×8') AND MECHANICAL CLOSET. FIRST FLOOR :REPLACE HALF BATHROOM, REPLACE FULL KITCHEN, REPLACE DAMAGE DRYWAL AND FLOOR. SECOND FLOOR:REPLACE FULL BATHROOM ,REPLACE DAMAGE DRYWAL AND 3 BEDROOM, REPLACE RAILINGS THE AISLE AND THE BLEACHERS SEPARATE PERMIT WILL BE REQUIREDF OR ELECTRICAL MECHANICAL AND PLUMBING WORK. APPROVED FOR WORK ONLY SUBJECT TO THE PERMIT USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZOONING ORDINANCE, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ.FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | — | Mar 21, 2023 |
| COM2022 | INSTALL (14) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $1,200 | Nov 11, 2022 |
| COM2022 | INSTALL (11) # PLUMBING FIXTURES AS PER CODE. | $800 | Nov 2, 2022 |
| COM2022 | INSTALL (11) # LAWN IRRIGATION SYSTEM, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) 50000 BTU FUEL-BURNING EQUIP, (1) 40000 BTU FUEL-BURNING EQUIP, (1) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | $1,100 | Oct 29, 2022 |
| COM2022 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (3) 50 CFM EXHAUST SYSTEMS , (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $8,000 | Sep 20, 2022 |
| COM2022 | BASEMENT:ADD FULL BEDROOM(14'×13') AND FULL BATHROOM(5'×8') AND MECHANICAL CLOSET. FIRST FLOOR :REPLACE HALF BATHROOM, REPLACE FULL KITCHEN, REPLACE DAMAGE DRYWAL AND FLOOR. SECOND FLOOR:REPLACE FULL BATHROOM ,REPLACE DAMAGE DRYWAL AND 3 BEDROOM, REPLACE RAILINGS THE AISLE AND THE BLEACHERS SEPARATE PERMIT WILL BE REQUIREDF OR ELECTRICAL MECHANICAL AND PLUMBING WORK. APPROVED FOR WORK ONLY SUBJECT TO THE PERMIT USES AND REGULATIONS UNDER THE PROVISIONS OF THE ZOONING ORDINANCE, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN 70SQ.FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | $9,000 | Sep 1, 2022 |
| COM2022 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REPLACE WINDOWS THE SAME SIZE AND THE SAME LOCATION. INTERIOR ALTERATIONS TO INCLUDE: REPLACE DAMAGE DRYWALL IN BEDROOMS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $2,800 | Apr 22, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Illegal DumpingJul 9, 2026 · 89 m · 1756 MONTPELIER ST
- violation: SW-Dirty AlleyJul 9, 2026 · 102 m
- violation: SW-Dirty AlleyJul 9, 2026 · 102 m
- violation: SW-Dirty AlleyJul 9, 2026 · 130 m
- violation: SW-Dirty AlleyJul 9, 2026 · 130 m
- violation: HCD-Sanitation PropertyJul 9, 2026 · 135 m · 2608 AISQUITH ST
- violation: HCD-Sanitation PropertyJul 9, 2026 · 142 m · 2604 AISQUITH ST
- violation: PM 305.2.2Jul 6, 2026 · 122 m · 1627 MONTPELIER ST
- violation: PM 306.1Jul 6, 2026 · 136 m · 2621 ROBB ST
- violation: PM 305.2.2Jul 6, 2026 · 136 m · 2621 ROBB ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.