Baltimore City · 21218

1749 GORSUCH AVE

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$202,100
Land use
Exempt Commercial (EC)
Year built
1920
Last sale
Oct 16, 2019

This owner holds 2 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerCIVIC WORKS, INC
Land useExempt Commercial (EC)
Total assessment$202,100 (cycle 2026)
Last saleOct 16, 2019 — $75,000
Year built1920
ZoningIMU-1
Vacant

Permits

12
TypeDescriptionCostIssued
BUSETO USE AS AN OFFICE.May 29, 2026
BCCMInstall (90) Roof Mounted Solar Panels on the existing flat roof. System Size 37.8kw$105,450Sep 30, 2025
BCCMFire Protection Sprinkler System-Install 89 sprinklers per NFPA 13, 2019 Edition$10,000Sep 29, 2025
BCCMInstall a fire alarm per plans as per code.Sep 26, 2025
COM2025PHASE 2 RENOVATION OF THE SECOND FLOOR OF AN EXISTING 2-STORY BUILDING, (FIRST FLOOR IS ACTIVELY BEING USED AS AN F-1 OCCUPANCY FOOD PROCESSING AND DISTRIBUTION UNDER A NON-FOR-PROFIT COMMUNITY PROGRAM) THE SECOND FLOOR SHALL BE BUILT-OUT TO HOUSE OFFICE SPACE AND WORK ROOMS FOR THE NON-FOR-PROFIT PROGRAM DIRECTORS AND THEIR STAFF, (SECOND FLOOR SHALL BE CLASSIFIED AS A B OCCUPANCY WITH ONE ACCESSORY SPACE - A SMALL CLASSROOM (205 SF) FOR STAFF TRAINING) RENOVATIONS INCLUDE NEW NON-STRUCTURAL INTERIOR PARTITIONS, NEW INTERIOR DOORS, NEW CEILINGS AND LIGHTING, AND NEW HVAC IS TO BE PROVIDED FOR THE BUSINESS SUITE. INCLUDES MECHANICAL, ELECTRICAL AND PLUMBING RENOVATIONS.(THE (ACCESSIBILITY REQUIREMENTS FOR THE PROJECT WERE ADDRESSED UNDER THE PHASE 1 IMPROVEMENTS WITH AN OFFICE, CONFERENCE AREA AND ADA COMPLIANT TOILET CONSTRUCTED ON THE GRADE LEVEL. THOSE SAME FEATURES ARE PROVIDED FOR THE LEVEL 2 PROGRAMMING, THUS ELEVATOR ACCESS TO THE SECOND LEVEL IS NOT REQUIRED FOR THE SECOND PHASE OF RENOVATIONS. HOWEVER, THE OWNER PLANS ON PUTTING IN AN ELEVATOR WHEN ADDITIONAL FUNDING BECOMES AVAILABLE - TO BE PERMITTED IN THE FUTURE) AS PER PLANS AS PER CODE.Apr 9, 2025
USE2023USE FOR THE SORTING AND BOXING WHOLE FARM PRODUCE. NO PROCESSING OF HARVESTED PRODUCE. BOXED GOODS ARE DISTRIBUTED OFF SITE. UP TO 15 STAFF MEMBERS ARE INVOLVED IN THE ACTIVITY. SPACE WILL ALSO BE USED FOR MEETINGS AND STORAGE. SOME MEETINGS MAY INCLUDE ANOTHER 15 PERSONS.Jul 12, 2023
COM2023REINSTATEMENT: (ORIGINAL PERMIT:COM2019-00682:NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2019-00682) NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. Jun 12, 2023
COM2023INSTALL (1) 400 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.$5,000Apr 6, 2023
COM2021REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-00682:NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2019-00682) NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. Apr 13, 2021
COM2020AMEND PERMIT: ADD PLUMBER AND GAS CONTRACTOR ..(ORIGINAL PERMIT:COM2019-00682:NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2019-00682) NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. Sep 24, 2020
COM2020AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2019-00682:NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2019-00682) NON-STRUCTURAL DEMOLITION OF EXISTING INTERIOR PARTITIONS (FOR NEW SPACE CONFIGURATION ON THE SECOND LEVEL) MODIFICATIONS TO THE EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS (AN ELEVATOR IS PROPOSED TO BE INSTALLED FOR ACCESSIBLITY TO THE SECOND LEVEL) A NEW, CODE COMPLIANT STAIR SHALL BE INSTALLED FOR CODE COMPLIANT EGRESS FROM THE BUILDINGS SECOND LEVEL SPACES, NEW INTERIOR PARTITIONS ARE PROVIDED ON BOTH LEVELS TO PROVIDE THE NEW PROGRAM/USE SPACES FOR THE PROJECT AS PER PLANS AS PER CODE. May 14, 2020
COM2019non-structural demolition of existing interior partitions (for new space configuration on the second level) modifications to the existing mechanical, electrical, and plumbing systems (an elevator is proposed to be installed for accessiblity to the second level) a new, code compliant stair shall be installed for code compliant egress from the buildings second level spaces, new interior partitions are provided on both levels to provide the new program/use spaces for the project as per plans as per code. $300,000Jul 2, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.