Baltimore City · 21218
2011 E 30TH ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $61,800
- Land use
- Residential (R)
- Year built
- 1937
- Last sale
- Mar 4, 2026
Assessment
| Owner | BRRR PORTFOLIO 2 LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $61,800 (cycle 2026) |
| Last sale | Mar 4, 2026 — $90,000 |
| Year built | 1937 |
| Zoning | R-6 |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | total rewire house with a 200 amp service | $6,500 | May 8, 2026 |
| BRCM | Install air handler, duct, bath fans and dryer | $8,500 | May 5, 2026 |
| BRCM | Install ten (10) plumbing fixtures, including kitchen sink and laundry connections. Reconstruct and install waste and water piping in accordance with Baltimore City Code. | $850 | Apr 16, 2026 |
| BRCM | The proposed project consists of a full interior renovation of an existing residential property, including the first floor, second floor, and basement. All work will comply with applicable local building codes and regulations. On the first floor, the scope of work includes the removal and replacement of existing kitchen cabinets with new cabinetry in the same general layout. New Luxury Vinyl Plank (LVP) flooring will be installed throughout the first floor. New drywall will be installed where required, including taping, mudding, and finishing. All walls, ceilings, doors, and trim will be prepared and painted. On the second floor, the existing bathroom will be fully renovated, including the removal and replacement of all fixtures, finishes, and wall and floor coverings. All interior doors, baseboards, and trim will be replaced with new materials of similar size and configuration. New Luxury Vinyl Plank (LVP) flooring will be installed throughout the second floor. New drywall will be installed where necessary, including taping, mudding, and finishing. All walls, ceilings, doors, and trim will be prepared and painted. In the basement, new drywall will be installed as needed, including taping, mudding, and finishing. Walls and ceilings will be prepared and painted. New Luxury Vinyl Plank (LVP) flooring flooring will be installed if applicable. No structural changes are proposed under this scope of work. | $45,000 | Apr 15, 2026 |
| BRCM | The scope of work includes interior demolition kitchen, bathroom, drywall. along with adjustments and corrections to the existing framing. No structural work will be done. | $30,000 | Apr 7, 2026 |
Violations
1| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | BC 114.14 | O | $500 | $1,250 | Feb 18, 2026 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 8, 2026 · 117 m · 1947 E 31ST ST
- violation: HCD-Vacant BuildingJul 3, 2026 · 108 m · 1910 E 29TH ST
- violation: HCD-Vacant BuildingJul 3, 2026 · 113 m · 1908 E 29TH ST
- violation: SW-Dirty AlleyJul 2, 2026 · 112 m · 1911 E 29TH ST
- violation: HCD-Illegal DumpingJun 30, 2026 · 58 m · 2934 HARFORD RD
- violation: HCD-Sanitation PropertyJun 30, 2026 · 61 m · 2932 HARFORD RD
- violation: PM 306.1Jun 30, 2026 · 122 m · 1943 E 31ST ST
- violation: PM 306.6Jun 30, 2026 · 122 m · 1943 E 31ST ST
- violation: HCD-Maintenance StructureJun 29, 2026 · 112 m · 1911 E 29TH ST
- violation: HCD-Maintenance StructureJun 27, 2026 · 60 m · 2962 HARFORD RD
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.