Baltimore City · 21218

1802 CHILTON ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$90,067
Land use
Residential (R)
Year built
1928
Last sale
Jul 1, 2008

Assessment

OwnerGRAHAM, MARIANNE
Land useResidential (R)
Total assessment$90,067 (cycle 2026)
Last saleJul 1, 2008 — $156,000
Year built1928
ZoningR-6
Vacant

Permits

4
TypeDescriptionCostIssued
COM2022AA CONV: Full Description Loaded as CommentMar 1, 2022
COM2022INSTALL (9) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE.$6,000Feb 9, 2022
COM2021INSTALL (6) # BRANCH CIRCUITS/FEEDERS , (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE.$2,000Nov 5, 2021
COM2021THE WORK SHALL BE COMPLETED AS FOLLOWS FOR MARIANNE GRAHAM, 1802CHILTON RD., BALTIMORE, MD 21218 KITCHEN 1. DEMO. REMOVE FROM THE SITE THE ITEMS AS SHOWN ON THE PLAN. 2. DEMO WALL. REMOVE THE PORTION OF WALL SHOWN ON THE PLAN AND INSTALL BEAM AS SHOWN ON THE STRUCTURAL PLANS. ONE SIZE BEAM IS CALLED OUT IF THE WALL SUPPORTS BOTH THE SECOND FLOOR AND THE ROOF AND ANOTHER SIZE BEAM IS CALLED OUT IF THE WALL SUPPORTS THE SECOND FLOOR ONLY. 4. PATCHING. PATCH AS NECESSARY DUE TO DEMOLITION AS SHOWN ON THE PLAN. 5. APPLIANCES. INSTALL OWNER PROVIDED APPLIANCES. 6. FLOORING. INSTALL VINYL TILE FLOORING IN THE KITCHEN 7. CABINETS. INSTALL NEW CABINETS AS PER THE ATTACHED SKETCH 8. COUNTER TOP. INSTALL COUNTER TOPS WITH 4” BACKSPLASH 9. SINK AND FAUCET. INSTALL SINK AND FAUCET. THE ALLOWANCE FOR MATERIAL IS 5300. 10. PAINTING. PAINT THE KITCHEN ONE COAT PRIMER AND TWO COATS PAINT. BATHROOM 1. DEMO. DEMO THE EXISTING BATHROOM AND BEDROOM AS SHOWN ON THE PLAN. 2. DOORS. ALTER THE BEDROOM AND INSTALL DOORS AS SHOWN ON PLAN INCLUDING THE BATHROOM BARNDOOR. 4. FLOORING. INSTALL FLOOR VINYL TILE 5. SHOWER TILE. INSTALL SHOWER WALL TILE 6. WALL. INSTALL FLAT STUD WALL WITH INSULATION AS SHOWN ON PLAN. INSTALL STANDARD STUD WALL AS SHOWN ON PLAN. 8. PAINT. PAINT THE BATHROOM AND OTHER AREAS AFFECTED BY THE CONSTRUCTION ONE COAT PRIMER AND TWO COATS PAINT. GARAGE 1. ROOFING. REPLACE THE ROOF ON THE GARAGE WITH A FLAT MEMBRANE ROOF INCLUDING GUTTERS. THE ROOF WILL CONSIST OF 2X10 RAFTERS AT 24” ON CENTER OR WHAT EVER CENTERS THE BEAM POCKETS EXIST, 7/6” ORIENTED STRAND BOARD SHEATHING AND .0060 EPDM ROOFING. IT IS ASSUMED THAT THE BEAM POCKETS IN THE MASONRY ARE IN USABLE CONDITION. 2. WALL. REPLACE THE FRONT WALL OF THE GARAGE WITH A NEW WALL CONSISTING OF 2X4 STUDS AT 16” ON CENTER, 7/6” ORIENTED STRAND BOARD SHEATHING, AND VINYL SIDING. 3. GARAGE DOOR. A NINE FOOT GARAGE DOOR WITH WINDOWS AND AN AUTOMATIC OPENER ARE INCLUDED 4. SWING DOOR. A 3’X6’8” EXTERIOR DOOR AND HARDWARE ARE INCLUDED. FIRST FLOOR BEDROOM. 5. FLOOR COVERING. THE FIRST FLOOR BEDROOM WILL HAVE THE CARPET REPLACED WITH VINYL TILE. 6. PAINTING. PAINT THE FIRST FLOOR BEDROOM INCLUDING WALLS, CEILING, TRIM, AND DOORS. 7. CLOSET. BUILD A CLOSET OUTSIDE THE BEDROOM ON THE WALL OPPOSITE THE BATHROOM 12’ LONG BY 30” DEEP WITH ONE HALF SHELVES AND ONE QUARTER SINGLE ROD AND SHELF AND ONE QUARTER DOUBLE ROD AND SHELF. 8. INSULATION. REMOVE THE DRYWALL OR PLASTER FROM THE BEDROOM EXTERIOR WALL AND INSULATE WITH R-13 BATT INSULATION, INSTALL DRYWALL AND BASE MOLDNG AND PAINT ONE COAT PRIMER AND TWO COATS PAINT. ALSO RETRIM WINDOW PLUS SEAL AIR GAPS. BASEMENT BATHROOM 9. PLATFORM. FINISH THE BATHROOM ON A PLATFORM, NO SHOWER. 10. FIXTURES. INSTALL MIRROR, PAPER HOLDER, TOWEL BAR, 12. FLOORING. INSTALL VINYL TILE FLOORING. BASEMENT 13. CEILING GRID. REPAIR THE CEILING GRID. 14. CEILING TILE. REPLACE THE CEILING TILE WITH NATURAL FISSURED TILES. 15. BIFOLD DOORS. REPLACE THE BIFOLD DOORS AND ADD BOTTOM PIVOTS AS NEEDED. 16. DRYWALL. INSTALL DRYWALL ON THE EXISTING STUDS ALONG PERIMETER OF BASEMENT. 17. FURRED WALLS. FOR BARE WALLS FUR WITH METAL STUDS AT 16” ON CENTER, ½” DRYWALL, BASE MOLDING CLOSELY MATCHING EXISTING AND PAINT. INSTALL R-13 INSULATION ON EXTERIOR WALLS. 18. FLOORING. INSTALL VINYL TILE FLOORING ON BASEMENT FLOOR. 20. WINDOW. INSTALL WINDOW WHERE THE WINDOW OPENING EXISTS. MAKE THE WINDOW SMALLER TO ALLOW ROOM FOR WALL NEXT TO THE WINDOW FOR THE DRYER EXHAUST TO PASS THROUGH. INSULATE THIS SMALL PORTION OF WALL. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK$75,000Aug 24, 2021

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.