Baltimore City · 21218
1826 CHILTON ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $240,000
- Land use
- Residential (R)
- Year built
- 1928
- Last sale
- Nov 1, 2023
Assessment
| Owner | CHARM ACQUISITIONS, LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $240,000 (cycle 2026) |
| Last sale | Nov 1, 2023 — $260,000 |
| Year built | 1928 |
| Zoning | R-6 |
| Vacant | — |
Permits
9| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE AS A SINGLE-FAMILY DWELLING. | — | Feb 17, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-72959:INSTALL (6) # PLUMBING FIXTURES, (1) 90000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-72959) INSTALL (6) # PLUMBING FIXTURES, (1) 90000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Jan 19, 2023 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-64668:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE PLASTER, NON-STRUCTURAL WALLS, FLOORING, DOORS, AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS IN THE BASEMENT AND SECOND FLOOR, INSTALLATION OF NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW TRIM, INSTALL NEW (R20) WALL INSULATION, INSTALL NEW FLOORING. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2022-64668) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE PLASTER, NON-STRUCTURAL WALLS, FLOORING, DOORS, AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS IN THE BASEMENT AND SECOND FLOOR, INSTALLATION OF NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW TRIM, INSTALL NEW (R20) WALL INSULATION, INSTALL NEW FLOORING. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | — | Jan 19, 2023 |
| COM2022 | SCOPE OF WORK:------CMU RETAINING WALL IN THE REAR OF PROPERTY AT THE ALLEY AND BESIDE A NEW SIDEWALK AND CONCRETE STEPS.-----EXTERIOR ALTERATIONS-----REAR DECK OFF THE KITCHEN LEVEL. NEW REAR STEPS ON SIDE OF PROPERTY. NEW EXTERIOR SIDING----FENCING----6 FT FENCE [[''FRONT, SIDE AND REAR YARD FENCING • REAR YARD FENCING FACING AN ALLEY FOR PRIVACY OR SCREENING IS PERMITTED IN REAR YARDS TO A MAXIMUM HEIGHT OF 72 INCHES. IT MAY BE OPAQUE TO A MAXIMUM HEIGHT OF 48 INCHES. ANY AREA ABOVE 48 INCHES MUST INCORPORATE A CHANGE IN ARTICULATION AND HAVE A TRANSPARENCY OF 30% OR GREATER WHEN FACING PUBLIC SPACES. ACCEPTABLE MATERIALS INCLUDE HIGH QUALITY WOOD, VINYL, PLASTIC WOOD COMPOSITE (I.E. TREX), AND MASONRY COMPATIBLE WITH THE ARCHITECTURAL GUIDELINES CONTAINED HEREIN. STOCKADE FENCING IS NOT PERMITTED. • PAINT OR STAIN COLORS FOR REAR YARD FENCING SHOULD BE COMPATIBLE WITH THE COLOR OF THE BUILDING TO WHICH IT IS ATTACHED, AS WELL AS WITH SURROUNDING BUILDINGS AND FENCES. • FRONT YARD FENCING MAY BE NO HIGHER THAN 48 INCHES. CHAIN LINK FENCING IS NOT ALLOWED.'' ]] ALL WORK TO BE DONE PER PLAN AND TO BALTIMORE CITY CODE.PER PLANNING DEPT: ***APPROVE WITH CONDITIONS OUTLINED IN THE CHM URP ON 11/4/22. ''FRONT, SIDE AND REAR YARD FENCING • REAR YARD FENCING FACING AN ALLEY FOR PRIVACY OR SCREENING IS PERMITTED IN REAR YARDS TO A MAXIMUM HEIGHT OF 72 INCHES. IT MAY BE OPAQUE TO A MAXIMUM HEIGHT OF 48 INCHES. ANY AREA ABOVE 48 INCHES MUST INCORPORATE A CHANGE IN ARTICULATION AND HAVE A TRANSPARENCY OF 30% OR GREATER WHEN FACING PUBLIC SPACES. ACCEPTABLE MATERIALS INCLUDE HIGH QUALITY WOOD, VINYL, PLASTIC WOOD COMPOSITE (I.E. TREX), AND MASONRY COMPATIBLE WITH THE ARCHITECTURAL GUIDELINES CONTAINED HEREIN. STOCKADE FENCING IS NOT PERMITTED. • PAINT OR STAIN COLORS FOR REAR YARD FENCING SHOULD BE COMPATIBLE WITH THE COLOR OF THE BUILDING TO WHICH IT IS ATTACHED, AS WELL AS WITH SURROUNDING BUILDINGS AND FENCES. • FRONT YARD FENCING MAY BE NO HIGHER THAN 48 INCHES. CHAIN LINK FENCING IS NOT ALLOWED.'' SEE PG 17 OF CHM URP: HTTPS://PLANNING.BALTIMORECITY.GOV/SITES/DEFAULT/FILES/COLDSTREAM%20HOMESTEAD%20MONTEBELLO_UPDATED%202018_AMEND%2011AND%2012%20-%20FINAL.PDF*** | $10,000 | Jan 5, 2023 |
| COM2022 | AMEND PERMIT: CHANGE PLUMBER AND GAS CONTRACTOR .(ORIGINAL PERMIT:COM2022-72959:INSTALL (6) # PLUMBING FIXTURES, (1) 90000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2022-72959) INSTALL (6) # PLUMBING FIXTURES, (1) 90000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Sep 19, 2022 |
| COM2022 | INSTALL (6) # PLUMBING FIXTURES, (1) 90000 BTU FUEL-BURNING EQUIP, (1) 45000 BTU FUEL-BURNING EQUIP AS PER CODE. | $11,000 | Jul 6, 2022 |
| COM2022 | INSTALL (22) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (5) # LOW VOLTAGE AS PER CODE. | $5,000 | Jun 29, 2022 |
| COM2022 | INSTALL (1) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 60000 BTU FUEL-BURNING EQUIP AS PER CODE. | $8,750 | Jun 16, 2022 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE PLASTER, NON-STRUCTURAL WALLS, FLOORING, DOORS, AND REMOVAL OF ALL ASSOCIATED DEBRIS, FRAMING TO CREATE NEW PARTITION WALLS IN THE BASEMENT AND SECOND FLOOR, INSTALLATION OF NEW DRYWALL, INSTALL NEW INTERIOR DOORS, INSTALL NEW TRIM, INSTALL NEW (R20) WALL INSULATION, INSTALL NEW FLOORING. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS, *SEPARATE PERMIT WILL BE PULLED FOR ANY MEP WORK. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES) | $50,000 | May 15, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 7, 2026 · 141 m · 1809 E 32ND ST
- permit: BRCMJun 30, 2026 · 141 m · 1809 E 32ND ST
- permit: BRCMJun 28, 2026 · 141 m · 1809 E 32ND ST
- permit: BRCMJun 26, 2026 · 141 m · 1809 E 32ND ST
- violation: PM 305.2.2Jun 15, 2026 · 148 m · 1718 CHILTON ST
- violation: HCD-Sanitation PropertyJun 8, 2026 · 147 m · 1718 CHILTON ST
- violation: BC 123.8.2May 27, 2026 · 36 m · 1825 E 33RD ST
- violation: BC 123.8.2May 27, 2026 · 55 m · 1813 E 33RD ST
- violation: SW-Dirty AlleyMay 25, 2026 · 52 m · 1819 CHILTON ST
- violation: PM 305.2.2May 21, 2026 · 53 m · 1821 CHILTON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.