Baltimore City · 21202

943 E CHASE ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$25,333
Land use
Residential (R)
Year built
1880
Last sale
Nov 13, 2023

Assessment

OwnerGREENMOUNT WEST PROPERTIE, LLC
Land useResidential (R)
Total assessment$25,333 (cycle 2026)
Last saleNov 13, 2023 — $45,000
Year built1880
ZoningR-8
VacantYes

Permits

6
TypeDescriptionCostIssued
COM2024INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE.$4,200Aug 21, 2024
COM2024INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 80000 BTU FUEL-BURNING EQUIP(FURNACE), (1) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS), (3) 50 CFM EXHAUST SYSTEMS AS PER CODE.$1,000Aug 20, 2024
COM2024SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: NEW CONCRETE SLAB IN BASEMENT 4' THICK/4' GRAVEL BASE (NO CURBING OR UNDERPINNING TO BE DONE), NEW REAR CONCRETE SLAB 4'' THICK/4'' GRAVEL BASE, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE $4,500Jul 12, 2024
COM2024 Extend Original Permit.(original permit:COM2023-83702:DEMO OF INTERIOR NON LOAD BEARING WALLS, FUR OUT NON LOAD BEARING WALLS WITH 2X4X8. STAIRS TO REMAIN SAME SIZE SAME LOCATION. NEW DRYWALL 4X8 M/R IN BATH AND WET AREAS. NEW DOORS, WINDOWS SAME SIZE SAME LOCATION. ALL WORK DONE TO CITY CODES. TRADES PULLED BY OTHER CONTRACTORS. AS PER CODE. 30 DAYS TO START THE WORK AND 90 DAYS TO COMPLETE THE WORK. OTHERWISE THIS PERMIT WILL BE VOIDED) Original Permit Description:(COM2023-83702) DEMO OF INTERIOR NON LOAD BEARING WALLS, FUR OUT NON LOAD BEARING WALLS WITH 2X4X8. STAIRS TO REMAIN SAME SIZE SAME LOCATION. NEW DRYWALL 4X8 M/R IN BATH AND WET AREAS. NEW DOORS, WINDOWS SAME SIZE SAME LOCATION. ALL WORK DONE TO CITY CODES. TRADES PULLED BY OTHER CONTRACTORS. AS PER CODE. 30 DAYS TO START THE WORK AND 90 DAYS TO COMPLETE THE WORK. OTHERWISE THIS PERMIT WILL BE VOIDEDJun 18, 2024
COM2024INSTALL (10) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE.$3,900Jun 15, 2024
COM2023DEMO OF INTERIOR NON LOAD BEARING WALLS, FUR OUT NON LOAD BEARING WALLS WITH 2X4X8. STAIRS TO REMAIN SAME SIZE SAME LOCATION. NEW DRYWALL 4X8 M/R IN BATH AND WET AREAS. NEW DOORS, WINDOWS SAME SIZE SAME LOCATION. ALL WORK DONE TO CITY CODES. TRADES PULLED BY OTHER CONTRACTORS. AS PER CODE. 30 DAYS TO START THE WORK AND 90 DAYS TO COMPLETE THE WORK. OTHERWISE THIS PERMIT WILL BE VOIDED$15,000Nov 21, 2023

Violations

3
KindCategoryStatusFineBalanceDate
citationBC 123.8.1O$1,000$1,000Mar 10, 2026
citationBC 123.8.1O$1,000$2,000Jul 24, 2025
vacant_building_noticeVacantopenJan 28, 2024

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.