Baltimore City · 21202
827 E CHASE ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $296,367
- Land use
- Residential (R)
- Year built
- 1880
- Last sale
- Jun 6, 2025
Assessment
| Owner | ROSS, MCKINLEY |
|---|---|
| Land use | Residential (R) |
| Total assessment | $296,367 (cycle 2026) |
| Last sale | Jun 6, 2025 — $319,500 |
| Year built | 1880 |
| Zoning | R-8 |
| Vacant | — |
Permits
10| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2024 | USE AS A SINGLE FAMILY DWELLING. | — | Jun 25, 2024 |
| COM2024 | INSTALL (3) 60 CFM EXHAUST SYSTEMS AS PER CODE. | $300 | Apr 18, 2024 |
| COM2024 | INSTALL (1) # ELECTRIC WATER HEATER, (16) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE. | $5,000 | Mar 5, 2024 |
| COM2024 | INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY) AS PER CODE. | $13,578 | Feb 1, 2024 |
| COM2024 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (20) # BRANCH CIRCUITS/FEEDERS , (10) # LOW VOLTAGE AS PER CODE. | $10,000 | Jan 19, 2024 |
| COM2023 | COMPLETE RENOVATION OF EXISTING BUILDING SHELL. REPAIR EXISTING FACADE AND CORNICE. NEW WINDOWS AND DOORS IN ALL EXISTING STRUCTURAL OPENINGS. NEW INTERIOR LAYOUT TO ACCOMMODATE NEW LIVING, KITCHEN, BEDROOM, AND BATHROOM SPACE. BASEMENT TO HOUSE HVAC AND SUMP PUMP. NEW ROOF AND REAR WALL STRUCTURE TO REBUILD SECOND & THIRD FLOOR WALL. NEW FRAMING WORK FOR FLOORS, ROOF, STAIRS. SEPARATE PERMIT IS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING. REFERENCE HISTORIC PRESERVATION DESCRIPTION OF WORK DURING CONSTRUCTION AND FOLLOW ACCORDINGLY. STRUCTURAL SUBMITTED THROUGH SEPARATE PERMIT: COM2022-80995, COM2023-71767 | $300,000 | Nov 29, 2023 |
| COM2023 | INSTALL (1) # WATER SERVICE PIPE (RECONSTRUCTION) AS PER CODE. | $3,000 | Oct 17, 2023 |
| COM2023 | INSTALL (1) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE. | $3,000 | Oct 9, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-80995:SCOPE OF WORK: INTERIOR ALTERATIONS (APPROX. 2000 SF) TO INCLUDE INTERIOR DEMOLITION (CATEGORY III); FULL GUT OF THE INTERIOR INCLUDING PORTIONS OF THE REAR WALL, NON-STRUCTURAL INTERIOR WALLS, FLOORING, STAIRS, AND ALL ASSOCIATED DEBRIS. NEW INTERIOR WORK INCLUDES NEW FOOTING/ FOUNDATION AND 2X6 FRAMED WALL AT REAR LOCATIONS AS NOTED ON DRAWINGS. NEW FLOOR JOISTS AND ROOF FRAMING TO BE PROVIDED AS NOTED ON THE DRAWINGS. ALL WORK TO BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. EXISTING BUILDING FOOTPRINT AND VOLUME TO REMAIN THE SAME. NO ADDITIONS OR EXTERIOR WORK TO BE DONE AT THIS TIME. NO UNDERPINNING TO BE DONE UNDER THIS APPLICATION. NO MEP OR ARCHITECTURAL FINISHES ARE PROPOSED DURING THIS PHASE OF WORK.) Original Permit Description:(COM2022-80995) SCOPE OF WORK: INTERIOR ALTERATIONS (APPROX. 2000 SF) TO INCLUDE INTERIOR DEMOLITION (CATEGORY III); FULL GUT OF THE INTERIOR INCLUDING PORTIONS OF THE REAR WALL, NON-STRUCTURAL INTERIOR WALLS, FLOORING, STAIRS, AND ALL ASSOCIATED DEBRIS. NEW INTERIOR WORK INCLUDES NEW FOOTING/ FOUNDATION AND 2X6 FRAMED WALL AT REAR LOCATIONS AS NOTED ON DRAWINGS. NEW FLOOR JOISTS AND ROOF FRAMING TO BE PROVIDED AS NOTED ON THE DRAWINGS. ALL WORK TO BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. EXISTING BUILDING FOOTPRINT AND VOLUME TO REMAIN THE SAME. NO ADDITIONS OR EXTERIOR WORK TO BE DONE AT THIS TIME. NO UNDERPINNING TO BE DONE UNDER THIS APPLICATION. NO MEP OR ARCHITECTURAL FINISHES ARE PROPOSED DURING THIS PHASE OF WORK. | — | Jul 5, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR ALTERATIONS (APPROX. 2000 SF) TO INCLUDE INTERIOR DEMOLITION (CATEGORY III); FULL GUT OF THE INTERIOR INCLUDING PORTIONS OF THE REAR WALL, NON-STRUCTURAL INTERIOR WALLS, FLOORING, STAIRS, AND ALL ASSOCIATED DEBRIS. NEW INTERIOR WORK INCLUDES NEW FOOTING/ FOUNDATION AND 2X6 FRAMED WALL AT REAR LOCATIONS AS NOTED ON DRAWINGS. NEW FLOOR JOISTS AND ROOF FRAMING TO BE PROVIDED AS NOTED ON THE DRAWINGS. ALL WORK TO BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. EXISTING BUILDING FOOTPRINT AND VOLUME TO REMAIN THE SAME. NO ADDITIONS OR EXTERIOR WORK TO BE DONE AT THIS TIME. NO UNDERPINNING TO BE DONE UNDER THIS APPLICATION. NO MEP OR ARCHITECTURAL FINISHES ARE PROPOSED DURING THIS PHASE OF WORK. | $125,000 | Apr 6, 2023 |
Violations
2| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | HE 7-608 | O | $500 | $65 | Aug 17, 2016 |
| citation | HE 7-608 | O | $500 | $1,500 | Aug 17, 2016 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 9, 2026 · 46 m · 811 E CHASE ST
- violation: HCD-Sanitation PropertyJul 2, 2026 · 117 m · 1110 HOMEWOOD AVE
- violation: SW-Dirty AlleyJul 1, 2026 · 46 m · 811 E CHASE ST
- violation: HCD-Sanitation PropertyJun 30, 2026 · 46 m · 811 E CHASE ST
- violation: SW-HGWJun 30, 2026 · 46 m · 811 E CHASE ST
- violation: HCD-Illegal DumpingJun 30, 2026 · 143 m
- permit: BRCMJun 15, 2026 · 128 m · 1114 HOMEWOOD AVE
- violation: VacantJun 14, 2026 · 62 m · 1028 VALLEY ST
- permit: BRCMJun 12, 2026 · 24 m · 837 E CHASE ST
- violation: PM 305.1Jun 5, 2026 · 112 m · 717 E CHASE ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.