Baltimore City · 21201
830 PARK AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $204,767
- Land use
- Residential (R)
- Year built
- 1860
- Last sale
- Feb 12, 2018
Assessment
| Owner | EWERS, MIRIAM E |
|---|---|
| Land use | Residential (R) |
| Total assessment | $204,767 (cycle 2026) |
| Last sale | Feb 12, 2018 — $490,000 |
| Year built | 1860 |
| Zoning | OR-2 |
| Vacant | — |
Permits
7| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | INSTALL 6 FOOT HIGH WOODEN FENCE ON OUR NORTH PROPERTY BOUNDARY TO PREVENT UNAUTHORIZED USE (BMZA2023-68), ACCESS, SECURITY, AND PRIVACY AS PER PLANS AS PER CODE. (WE HAVE CHAP AND BMZ APPROVALS) | $18,000 | Dec 12, 2023 |
| COM2023 | AA CONV: Full Description Loaded as Comment | — | Jun 5, 2023 |
| BMZ2023 | to construct a fence in the front and side yards. | — | Mar 1, 2023 |
| COM2021 | *AUTHORIZATION TO PROCEED*** • COMPLETE LED ABATEMENT WORK TO CONSIST OF EXTERIOR PAINTING AND ENCAPSULATION OF PEELING LEAD PAINT ON EXTERIOR WALLS OF PROPERTY AT 830 PARK AS WELL AS NORTH WALL OF 828 PARK. WALLS TO BE PAINTED CHINA WHITE, WINDOWS AND TRIM TO BE PAINTED IRON MOUNTAIN. • REMOVE CONTAMINATED SOIL AS PER DRAWINGS. • REPLACE WINDOWS AND TRANSOMS AT TYSON STREET AND PARK AVENUE ELEVATIONS AS NOTED IN APPLICATION WITH NEW WOOD WINDOWS TO MATCH EXISTING CONFIGURATION. NEW WINDOWS MUST FULLY FIT THE EXISTING MASONRY OPENINGS WITH EXTERIOR AND INTERIOR PROFILES AND SPACER BARS. • REPLACE EXISTING DOORS AT PARK AVENUE AND TYSON STREET ELEVATIONS. NEW TYSON STREET DOOR TO REPLICATE EXISTING. NEW PARK AVENUE DOOR TO BE A MULTI-LIGHT AND PANEL DOOR. • REMOVE EXISTING WOOD FENCE AT PARK AVENUE AND INSTALL NEW RED BRICK MASONRY WALL WITH BROWN METAL VEHICULAR ENTRANCE DOOR AND TWO BROWN METAL PEDESTRIAN DOORS. • INSTALL NEW TREX FENCE ALONG THE NORTH PROPERTY BOUNDARY. HEIGHT TO BE REVIEWED AND APPROVED BY BMZA, COLOR TO BE REVIEWED AND APPROVED BY CHAP STAFF. ALL WORK TO MATCH INFORMATION ON FILE WITH CHAP. (LEAD PAINT REMOVAL AND LEAD ENCAPSULATION -ON ALL EXTERIOR BUILDING SURFACES. TWO BUILDING SURFACES REQUIRE WORK BE DONE ON NEIGHBORS PROPERTY. BOTH NEIGHBORS HAVE PRE-APPROVED THIS WORK. WE WILL ALSO ENCAPSULATE LEAD PAINT HAZARD ON 102' LONG NEIGHBOR OWNED BRICK EXTERIOR THAT DROPPED LEAD PAINT INTO MY SOIL. LEAD HAZARD IN SOIL IS EXTREMELY HIGH. LEAD SOIL TEST EXCEEDS THE SCALE USED TO DETERMINE SAFETY FOR CHILDREN. WE HAVE CHILDREN ON-SITE FOR KINDERGARTEN THIS YEAR. WE HAVE DHCD GRANT TO HELP US DEAL WITH THE SOIL AND PEELING PAINT USING LEAD SAFE CERTIFIED TEAM. WE WILL ALSO REPLACE WINDOWS, DOOR AND 140 YEAR OLD SKY LIGHTS. USING A DHCD/EPA APPROVED PROJECT MANAGEMENT PERSON. IN REMOVING SOIL WE WILL BACK FILL AND APPLY NEW GRADE THAT MATCHES NORTH NEIGHBOR. WE WILL REPLACE WOODEN FENCES WITH CHAP APPROVED MATERIALS BETTER FITTING THE NEIGHBORHOOD A FULLY VETTED PLAN. WE HAVE A CITY PLANNING COMMISSION APPROVED, CHAP APPROVED, AND DOT APPROVED CURB-CUT BEING ADDED TO THE SITE TO MAKE ACCESS POSSIBLE AND CLEAN-UP POSSIBLE PERMIT NO. ROW2019-1163385. WE HAVE STAMPED ENGINEERING PLANS WITH CITY PLANNING COMMISSION, CHAP, DOT APPROVED SITE PLAN. WE ARE ADDING A CHAP APPROVED FENCE ON UNSECURED PROPERTY BOUNDARY TO OUR NORTH. HEIGHT OF NEW FENCE WILL BE DETERMINED BY UPCOMING HEARING WITH BALTIMORE CITY BOARD OF MUNICIPAL AND ZONING APPEALS. APPLICATION IS THOUGHT TO HAVE HEARING AT THE END OF 1/2021.) | $150,000 | Nov 12, 2021 |
| COM2021 | AS PER CHAP:REPLACE EXISTING FLAT ROOF WITH A NEW TPO ROOF. REPLACE EXSITING SKYLIGHTS WITH NEW SKYLIGHTS THAT REPLICATE THE EXISTING IN MATERIAL AND CONFIGURATION. REPLACE EXISTING GUTTER AND DOWNSPOUTS ALONG TYSON STREET WITH NEW 8” INDUSTRIAL K-STYLE GUTTER AND DOWNSPOUTS IN BRONZE OR SOFT WHITE. ALL WORK TO MATCH INFORMATION ON FILE WITH CHAP. | $25,000 | Aug 19, 2021 |
| BMZ2020 | to construct a fence in the front and side yards. | — | Jan 12, 2021 |
| COM2020 | AS PER CHAP:INSTALL TEMPORARY FENCE ON NORTH PROPERTY LINE. FENCE TO BE COMPOSED OF 5’ STEEL TSHAPED POSTS WITH 4’ PLASTIC WEBBING SPANNING THE DISTANCE BETWEEN POSTS. THIS FENCE MAY ONLY BE UP FOR ONE YEAR OR LESS. ALL WORK TO MATCH INFORMATION ON FILE WITH CHAP. | $300 | Aug 16, 2020 |
Violations
2| Kind | Category | Status | Date |
|---|---|---|---|
| service_request | HCD-CCE Building Permit Complaint | Closed (Duplicate) | May 22, 2026 |
| service_request | HCD-CCE Building Permit Complaint | Closed | May 22, 2026 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 6, 2026 · 58 m · 814 PARK AVE
- violation: HCD-Sanitation PropertyJun 30, 2026 · 83 m · 845 N HOWARD ST
- violation: SW-Dirty AlleyJun 22, 2026 · 102 m · 873 N HOWARD ST
- violation: HCD-Maintenance StructureJun 16, 2026 · 40 m · 858 TYSON ST
- permit: BCCMJun 16, 2026 · 132 m · 827 LINDEN AVE
- violation: PM 306.1Jun 15, 2026 · 70 m · 845 N HOWARD ST
- permit: BUSEJun 12, 2026 · 106 m · 212 W READ ST
- violation: SW-Dirty AlleyJun 9, 2026 · 114 m · 125 BREXTON ST
- violation: HCD-Sanitation PropertyJun 9, 2026 · 129 m · 101 W READ ST
- violation: HCD-Sanitation PropertyJun 9, 2026 · 148 m · 106 W MADISON ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.