Baltimore City · 21202
28 E MOUNT VERNON PL
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $526,600
- Land use
- Apartments (M)
- Year built
- 1900
- Last sale
- Aug 28, 2023
Assessment
| Owner | SPECTRE MOUNT VERNON PLACE A LLC |
|---|---|
| Land use | Apartments (M) |
| Total assessment | $526,600 (cycle 2026) |
| Last sale | Aug 28, 2023 |
| Year built | 1900 |
| Zoning | OR-2 |
| Vacant | — |
Permits
16| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2024 | EXTERIOR BROWNSTONE REPAIRS, WINDOW, BALCONY AND CORNICE REPAIRS. AS PER CODE. APWC-RESTORATION OF THE MAIN FACADE OF THE BROWNSTONE, INCLUDING WOOD WINDOW RESTORATION, WOOD CORNICE REPAIRS, IRON BALCONY REFURBISHMENT, WOOD ENTRY DOOR REFURBISHMENT, MEMBRANE ROOF REPLACEMENT, REMOVAL OF A NON-ORIGINAL BRICK PLANTER, AND SELECTIVE BRICK POINTING. ALL PAINT COLORS WILL MATCH THE EXISTING COLORS. 1.WOOD WINDOW RESTORATION AND PAINTING: - RESTORATION OF ALL WOOD WINDOWS, ENSURING ALL DETAILS ARE MATCHED. - PAINTING THE RESTORED WINDOWS IN COLORS THAT MATCH THE EXISTING SCHEME. 2. WOOD CORNICE REPAIRS AND PAINTING: - REPAIRS TO THE WOOD CORNICE TO ADDRESS ANY DAMAGE OR DECAY. - PAINTING THE REPAIRED CORNICE TO MATCH THE EXISTING COLOR. 3. IRON BALCONY REFURBISHMENT AND PAINTING: - REFURBISHMENT OF THE IRON BALCONY, INCLUDING RUST REMOVAL AND STRUCTURAL REPAIRS. - PAINTING THE BALCONY TO MATCH THE EXISTING COLOR. 4. WOOD ENTRY DOOR REFURBISHMENT AND PAINTING: - REFURBISHMENT OF THE WOOD ENTRY DOOR, INCLUDING ANY NECESSARY REPAIRS TO RESTORE IT TO ITS ORIGINAL CONDITION. - PAINTING THE DOOR TO MATCH THE EXISTING COLOR. 5. MEMBRANE ROOF REPLACEMENT: - REPLACEMENT OF THE EXISTING MEMBRANE ROOF WITH A NEW, DURABLE MEMBRANE ROOF. 6. REMOVAL OF NON-ORIGINAL BRICK PLANTER: - REMOVAL OF A NON-ORIGINAL BRICK PLANTER FROM THE PROPERTY. 7. SELECTIVE BRICK POINTING: - SELECTIVE POINTING OF BRICKS ON THE FACADE TO ENSURE STRUCTURAL INTEGRITY AND AESTHETIC CONSISTENCY. NEW MORTAR TO MATCH HISTORIC IN COLOR, TEXTURE, MATERIAL COMPOSITION, AND JOINT PROFILE. ALL WORK TO MATCH PLANS/INFORMATION/SPECS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES IT. AS PER CODE.******CHAP (APWC) RESTORATION OF THE MAIN FACADE OF THE BROWNSTONE, INCLUDING WOOD WINDOW RESTORATION, WOOD CORNICE REPAIRS, IRON BALCONY REFURBISHMENT, WOOD ENTRY DOOR REFURBISHMENT, MEMBRANE ROOF REPLACEMENT, REMOVAL OF A NON-ORIGINAL BRICK PLANTER, AND SELECTIVE BRICK POINTING. ALL PAINT COLORS WILL MATCH THE EXISTING COLORS. 1.WOOD WINDOW RESTORATION AND PAINTING: - RESTORATION OF ALL WOOD WINDOWS, ENSURING ALL DETAILS ARE MATCHED. - PAINTING THE RESTORED WINDOWS IN COLORS THAT MATCH THE EXISTING SCHEME. 2. WOOD CORNICE REPAIRS AND PAINTING: - REPAIRS TO THE WOOD CORNICE TO ADDRESS ANY DAMAGE OR DECAY. - PAINTING THE REPAIRED CORNICE TO MATCH THE EXISTING COLOR. 3. IRON BALCONY REFURBISHMENT AND PAINTING: - REFURBISHMENT OF THE IRON BALCONY, INCLUDING RUST REMOVAL AND STRUCTURAL REPAIRS. - PAINTING THE BALCONY TO MATCH THE EXISTING COLOR. 4. WOOD ENTRY DOOR REFURBISHMENT AND PAINTING: - REFURBISHMENT OF THE WOOD ENTRY DOOR, INCLUDING ANY NECESSARY REPAIRS TO RESTORE IT TO ITS ORIGINAL CONDITION. - PAINTING THE DOOR TO MATCH THE EXISTING COLOR. 5. MEMBRANE ROOF REPLACEMENT: - REPLACEMENT OF THE EXISTING MEMBRANE ROOF WITH A NEW, DURABLE MEMBRANE ROOF. 6. REMOVAL OF NON-ORIGINAL BRICK PLANTER: - REMOVAL OF A NON-ORIGINAL BRICK PLANTER FROM THE PROPERTY. 7. SELECTIVE BRICK POINTING: - SELECTIVE POINTING OF BRICKS ON THE FACADE TO ENSURE STRUCTURAL INTEGRITY AND AESTHETIC CONSISTENCY. NEW MORTAR TO MATCH HISTORIC IN COLOR, TEXTURE, MATERIAL COMPOSITION, AND JOINT PROFILE. ALL WORK TO MATCH PLANS/INFORMATION/SPECS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES IT | — | Mar 24, 2025 |
| COM2024 | INSTALL (1) # WATER SERVICE PIPE ( 1-2 FAM. RES.) AS PER CODE. | $1,000 | Oct 2, 2024 |
| USE2021 | USE PORTION K/A 702 ST PAUL ST AS A STATIONERY AND BOOK STORE PER BMZA2021-131. | — | Oct 21, 2021 |
| COM2021 | PER CHAPS ATP: • INSTALL PAINTED WALL SIGN ABOVE STORE ENTRANCE TO READ “THE PAPER HERALD” – WHITE LETTERING WITH BLACK SHADOWING. • INSTALL TWO SMALL BLACK GOOSE NECK LIGHTS ON EITHER SIDE OF THE CENTERED PAINTED SIGN. • PAINT FRONT ELEVATION BM- HC156 ALL WORK TO MATCH INFORMATION ON FILE WITH CHAP.SCOPE OF WORK:----SIGNAGE--PAINTED WALL SIGN ILLUSTRATING NAME OF THE LESSEE BUSINESS - ''THE PAPER HERALD'' - ABOVE THE ENTRANCE. AS PER PLANS AND AS PER CODE. | $1,500 | Sep 2, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2021-00383:REPLACE 8 PLUMBING FIXTURES, RECONSTRUCT WATER/WASTE, RELOCATE 1 STEAM RADIATOR) Original Permit Description:(COM2021-00383) REPLACE 8 PLUMBING FIXTURES, RECONSTRUCT WATER/WASTE, RELOCATE 1 STEAM RADIATOR | — | Aug 13, 2021 |
| BMZ2021 | use portion k/a 702 saint paul st. as a retail goods establishment (stationery/bookstore). | — | May 21, 2021 |
| COM2021 | CHANGE OUT 2-100 AMP SUB PANELS 25 FIXTURES/DEVICES 16 BRANCH CIRCUITS AS PER PLANS AS PER CODE. | $2,000 | Apr 23, 2021 |
| COM2021 | REPLACE 8 PLUMBING FIXTURES, RECONSTRUCT WATER/WASTE, RELOCATE 1 STEAM RADIATOR | $8,000 | Feb 2, 2021 |
| COM2021 | AS PER CHAP:REMOVE REMAINING PORTIONS OF SIX FIRE DAMAGED TWO-OVER-FOUR WOOD WINDOWS AT THE SECOND AND THIRD FLOORS OF THE FRONT ELEVATION AND INSTALL NEW WOOD WINDOWS THAT REPLICATE THE DIMENSIONS AND CONFIGURATION. NEW MUNTINS MUST HAVE INTERIOR AND EXTERIOR PROFILES AND SPACER BAR. NEW BRICKMOLD TO MATCH EXISTING. ALL WORK TO MATCH INFORMATION ON FILE WITH CHAP. | $4,500 | Jan 15, 2021 |
| COM2020 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INSTALL NEW DRYWALL THAT WAS REMOVED IN SECTIONS OF UNIT 2F, 3F AND HALLWAY FROM WATER / SMOKE DAMAGE. REPLACE INTERIOR BUILDING UNIT ENTER DOORS THAT HAD BEEN DAMAGED USING 90 MIN RATED DOORS (IN THE SAME SIZE AND LOCATION). NO CHANGE IN FRAMING, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $12,500 | Dec 17, 2020 |
| COM2020 | INSTALL (1) # STORM WATER CONNECTION (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE. | $250 | Feb 5, 2020 |
| COM2019 | install (2) # plumbing fixtures as per code. | $4,500 | Nov 21, 2019 |
| COM2019 | install (5) # branch circuits/feeders , (60) # fixtures/devices as per code. | $2,500 | Nov 15, 2019 |
| COM2019 | install (1) 12000 btu air-con system, heat pump, (1) 70 cfm exhaust systems as per code. | $3,200 | Nov 15, 2019 |
| COM2019 | scope of work: interior alterations to include: interior demolition (category i): replace the damaged drywall with new drywall, replace the existing drop ceiling with new drop ceiling, replace existing damaged closet and bathroom doors with new (in the same size and location) and repaint walls in space, all work will be done according to baltimore city code. | $3,500 | Nov 11, 2019 |
| COM2019 | *authorization to proceed* • remove all damaged stone at first floor window at facade down to sound substrate. • install stainless steel anchors and pins to provide mechanical adhesion for the jahn m70 brownstone repair mortar. • patch the brownstone using the approved custom color matched jahn m70 brownstone repair mortar following all manufacturers’ instructions. • finish the repairs recreating the original color, texture, and profile of the existing stone. carve the m70 to recreate the original details of the brownstone. • repoint the open and damaged mortar joints using a custom color matched jahn m110 brownstone pointing mortar. finish the pointing to match the original mortars color and profile. all work limited to first floor front window. all work to match information on file with chap. | $1,000 | Feb 7, 2019 |
Violations
2| Kind | Category | Status | Date |
|---|---|---|---|
| service_request | HCD-Maintenance Structure | Open | Jun 22, 2026 |
| service_request | HCD-Sanitation Property | Closed | Jun 5, 2026 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BCCMJul 8, 2026 · 130 m · 649 SAINT PAUL ST
- violation: HCD-Maintenance StructureJul 5, 2026 · 148 m · 817 SAINT PAUL ST
- violation: BC 123.8.2Jun 30, 2026 · 121 m · 809 SAINT PAUL ST
- violation: BC 123.8.2Jun 30, 2026 · 121 m · 809 SAINT PAUL ST
- violation: HCD-Sanitation PropertyJun 30, 2026 · 144 m
- violation: HCD-Maintenance StructureJun 22, 2026 · 10 m · 26 E MOUNT VERNON PL
- permit: BCCMJun 18, 2026 · 90 m · 715 WASHINGTON PL
- violation: HCD-Maintenance StructureJun 12, 2026 · 10 m · 26 E MOUNT VERNON PL
- violation: HCD-Maintenance StructureMay 26, 2026 · 41 m
- violation: BC 123.8.2May 20, 2026 · 138 m · 813 SAINT PAUL ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.