Baltimore City · 21202
1011 SAINT PAUL ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $255,233
- Land use
- Commercial (C)
- Year built
- 1900
- Last sale
- Jul 24, 2024
Assessment
| Owner | KIM, YOUNG RAN SUNWOO |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $255,233 (cycle 2026) |
| Last sale | Jul 24, 2024 |
| Year built | 1900 |
| Zoning | OR-2 |
| Vacant | — |
Permits
8| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE UNIT 1A & 1B AS A HEALTH-CARE CLINIC [INTENSIVE OUTPATIENT THERAPY OFFICE] | — | Sep 28, 2023 |
| USE2020 | USE PORTION OF PREMISES FOR MULTI-FAMILY DWELLING CONSISTING OF FIVE (5) DWELLING UNITS: 2ND & 3RD FLOORS-2 DWELLING UNITS EACH, 4TH FLOOR-1 DWELLING UNIT. | — | Dec 3, 2021 |
| COM2020 | CHANGE PLUMBING FIXTURES ONLY (6)-WATER CLOSETS (6)-BATH TUBS (6)-VANITIES (6)-KITCHEN SINKS (6)-ELECTRIC WATER HEATERS (1) WASH MACHINE ALL FIXTURES REPLACED IN SAME LOCATION AS PER LOCAL CODE | $3,500 | Feb 6, 2020 |
| COM2019 | as per chap:• replace five heat pumps at the roof. same rough size and location as existing. equipment must not be visible from the street. all work to match information on file with chap. | $7,500 | Dec 20, 2019 |
| COM2019 | install (75) # fixtures/devices, (20) # branch circuits/feeders as per code. | $3,500 | Sep 23, 2019 |
| COM2019 | install (7) 100 amps new electrical meters as per code. | $2,000 | Sep 23, 2019 |
| COM2019 | install (1) 600 amps electric service up to 600v (#amps) as per code. | $3,000 | Sep 12, 2019 |
| COM2019 | reinstatement:(original permit:com2018-69699:reinstate original permit.(original permit:com2012-17208:exterior & interior alteration. the scope of project includes (4) efficiency units & new entry door steps and railing per plans per code. separate plans are required for sprinklers and fire alarm systems. ) original permit description:(com2012-17208) exterior & interior alteration. the scope of project includes (4) efficiency units & new entry door steps and railing per plans per code. separate plans are required for sprinklers and fire alarm systems. ) | — | Jun 27, 2019 |
Violations
2| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | BC 123.8.2 | P | $250 | $0 | Mar 20, 2026 |
| citation | BC 123.8.2 | O | $250 | $640 | Oct 15, 2025 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 84 m · 1013 N CALVERT ST
- violation: HCD-Sanitation PropertyJul 8, 2026 · 84 m · 1013 N CALVERT ST
- permit: BCCMJul 6, 2026 · 108 m · 926 N CALVERT ST
- permit: BCCMJul 6, 2026 · 108 m · 926 N CALVERT ST
- permit: BCCMJul 2, 2026 · 131 m · 1009 N CHARLES ST
- permit: BRCMJul 1, 2026 · 108 m · 926 N CALVERT ST
- violation: HCD-Maintenance StructureJul 1, 2026 · 137 m · 915 SAINT PAUL ST
- permit: BRCMJun 30, 2026 · 108 m · 926 N CALVERT ST
- violation: SW-Dirty AlleyJun 29, 2026 · 130 m · 917 SAINT PAUL ST
- permit: BRCMJun 24, 2026 · 103 m · 1005 N CALVERT ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.