Baltimore City · 21211
3100 WYMAN PARK DR
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $23,123,000
- Land use
- Exempt Commercial (EC)
- Year built
- 1933
- Last sale
- Oct 13, 2021
Assessment
| Owner | JOHNS HOPKINS UNIVERSITY, THE |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $23,123,000 (cycle 2026) |
| Last sale | Oct 13, 2021 — $3,321,000 |
| Year built | 1933 |
| Zoning | EC-2 |
| Vacant | — |
Permits
showing 50 of 104| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | RENOVATE FLOORS 2 & 3 FOR USE AS CONSTRUCTION FIELD OFFICES WITHIN EXISTING SHELL SPACE TO INCLUDE PROVIDING ARCHITECTURAL PARTITIONS, DOORS & FRAMES, AND FLOOR, WALL, AND CEILING FINISHES AS SHOWN ON PLANS; PROVIDE NEW MECHANICAL CONDITIONING AND VENTILATION SYSTEMS FOR FLOORS 2 & 3; PROVIDE PLUMBING SYSTEMS AND FIXTURES FOR NEW TOILET ROOMS ON FLOORS 2 & 3; PROVIDE NEW BRANCH POWER, DATA, AND LED LIGHTING TO SERVE FLOORS 2 & 3; PROVIDE LIFE SAFETY IMPROVEMENTS FOR WHOLE BUILDING INCLUDING THE FOLLOWING: PROVIDE NEW 2-HOUR RATED STAIR SHAFT ENCLOSURES AROUND EXISTING STAIRS. | $3,287,982 | Jun 16, 2026 |
| BCCM | Add devices to existing fire alarm system. | $7,000 | May 29, 2026 |
| BCCM | Removal of two (2) 12,000-gallon aboveground storage tanks (ASTs) and one 300-gallon AST. As per plans as per code. Another company will facilitate the piping as per applicant | $24,678 | Apr 28, 2026 |
| BDEM | Central Utility Plant Demolition (5300 SF), including underground connector tunnel, with remaining entranceway shored up. | — | Apr 10, 2026 |
| BCCM | SCOPE OF WORK: ------- ADDITION ---------- Two separate additions to the existing building - New Substation addition: 1,700 s.f. (1 story) and New Storage building section addition: 1,300 s.f. (1 story). Where the storage building section connects to the main existing building, will infill 1 existing window opening. -------- SITE WORK -------- grading, paving -------- RETAINING WALL -------- construction of a retaining wall ------- EXTERIOR ALTERATIONS ------- facade repair where grade will change at the exterior wall interface (approx. 70 feet). AS PER PLANS AND AS PER CODE. | $3,686,000 | Mar 12, 2026 |
| BCCM | Provide and install, 90 flush mount 2-data locations, 1 flush mount 4 data location, 21 ceiling mount 2-data locations, 3 ceiling mount 1 data location, 11 ceiling mount 2 data wireless access points and install 11 JHU provided wireless access points. | $0 | Feb 17, 2026 |
| BCCM | Support of Excavation installation and placement, which includes -174 soldier piles with lagging in between and tiebacks for lateral support where needed. As per plans and as per code. | $2,300,000 | Feb 17, 2026 |
| BCCM | Provide and install forty-six (44) flush mount 2-data locations. Provide and install eleven (11) ceiling mount 2-data locations. Provide and install ten (10) ceiling mount 2-data wireless access point locations. | $0 | Feb 4, 2026 |
| BCCM | ********* Amend issued Permit #COM2024-01603 / Plans#2024-1414 for the following scope-******* SCOPE OF WORK: -------- GRADING -------- - Exterior Utility work including upgrades and relocations of primary and emergency electric ductbanks, telecommunication ductbanks, chilled water service + return pipes, heating hot water service + return pipes, fire/domestic water mains and service connections, fire hydrants, sanitary sewer, and storm drains, as well as in-kind surface restoration. -------- INTERIOR ALTERATIONS ----------- - Renovation of interior space to replace existing offices with new chilled water pump room with associated lighting, mechanical, piping, and sprinkler coordination. - Replacement of existing water heaters and connection to new water heaters in new location. - Installation of three new building chilled water pumps within a new constructed pump room. Building chilled water pumps will be connected to the campus chilled water system as well as the existing Wyman Building 1 underground chilled water piping. - New chilled and heating hot water vaults are to be provided for routing of new campus chilled and heating hot water pipes to Wyman Building 1 and (future) DSAI building. AS PER PLANS AND AS PER CODE. | $2,300,000 | Jan 30, 2026 |
| BCCM | Installation of an Automatic temperature Control System. as per code. | $0 | Jan 20, 2026 |
| BCCM | INSTALL FIRE ALARM SYSTEM AS PER PLANS AND CODE | $0 | Dec 30, 2025 |
| COM2024 | ********** 3100 WYMAN PARK DRIVE (SOUTH PARCEL) ******* SCOPE OF WORK: ----- GRADING -------- SITE EXCAVATION (INCLUDING REMOVAL OF PRIVATE ROADWAY, PARKING LOT, SIDEWALKS, BUILDING FOUNDATION SLABS [FROM WYMAN 1 TAIL DEMO AND WYMAN CHILLER PLAN DEMO]); EXISTING SITE UTILITIES REMOVAL (INCLUDING STORM, SANITARY, GAS, SITE LIGHTING); MASS EXCAVATION AND GRADING; SITE WORK (INCLUDING TEMPORARY PAVING TO SUPPORT CONSTRUCTION ACTIVITIES & TEMPORARY TRASH/LOADING ACTIVITIES), INSTALLATION OF NEW UNDERGROUND UTILITIES (STORM, SANITARY, ELECTRIC, DOMESTIC WATER, HEATING HOT WATER). LOD 254,426 SF; CUT / FILL 36,028 CY AS PER PLANS AS PER CODE. | — | Dec 19, 2025 |
| BCCM | Fire alarm work, add to existing SLC and A/Vs. No changes will be made to the existing sequences of operations. (5) Smoke Detector heads, (1) Heat detector, (4) Duct Smoke Detector Housing, (3) Strobe, (31) Speaker Strobe, | $16,000 | Nov 21, 2025 |
| BCCM | The scope of work includes removing the existing mains, branchlines and heads in the existing area of work. BFPE will run new main, branchlines, and sprinkler heads to provide the proper coverage in the newly renovated space. | $104,782 | Nov 17, 2025 |
| BCCM | ********** Site Work Only. includes all work related to the site preparation and installation of interim loading areas and access ******* SCOPE OF WORK: ------- EXTERIOR ALTERATIONS --------- Exterior Work Only includes 3-story demolition of facade tail portion and necessary infill (WILL CONSIST OF PLACEMENT OF NEW EXTERIOR WALL AND NEW WINDOWS SITTING UPON EXISTING OR NEW FOUNDATIONS; ) of removed façade areas to enclose the Wyman 1 Building; --------- INTERIOR ALTERATIONS ------- Interior Work Only includes construction of new entrance lobby with access stair and lift and related improvements (A NEW EXIT ACCESS STAIR WILL BE PROVIDED TO CONNECT THE FIRST FLOOR TAIL AREA WITH THE EXTERIOR.). AS PER PLANS AND AS PER CODE. | $6,400,000 | Nov 7, 2025 |
| BCCM | Fire alarm. Electrical and Fire detection upgrades as per plans as per code. | $959,000 | Nov 3, 2025 |
| BTEMP | Limited one day event to present new Agora Building to limited invite only audience, 10AM-2PM, with limited set up completed on 10.14.25. | $5,000 | Oct 20, 2025 |
| BCCM | Electrical work Only - 70 fixtures and devices; 7 Low voltage devices; 1 Tele Grounding/Bonding | $0 | Sep 17, 2025 |
| BCCM | Amend Permit COM#2021-02613/ approved Plans#2021-1838 to add PV System Installation | $453,000 | Sep 2, 2025 |
| BCCM | INSTALL 2 SMOKE DETECTORS AND 2 SPEAKER STROBERS AS PER CODE | $8,000 | Aug 25, 2025 |
| BCCM | Sprinkler, add 120 new sprinkler heads. The scope of work includes removing the existing two and a half inch main back to the Pro Shop G40. BFPE will run a new main to extend the sprinkler system to provide the proper coverage. | $90,250 | Jul 31, 2025 |
| BCCM | The scope of work includes removing and capping the existing branchlines that feed lab spaces that will be demoed. BFPE will run a new branchline to install 5 sidewall heads in the newly renovated Pump Room. | $10,950 | Jul 23, 2025 |
| BCCM | The scope of work includes BFPE extending the existing sprinkler system. BFPE will intall an new two and a half inch main, branchlines, and 23 concealed sprinkler heads to provide the proper coverage in the newly renovated office and storage space. | $104,782 | Jun 6, 2025 |
| COM2024 | ********* AMEND PERMIT COM2024-01604 PLAN NO 2024-1415 ISSUED 10/23/2024 ****** SCOPE OF WORK: ------- INTERIOR/EXTERIOR ALTERATIONS --------- FOR THE INCREASED RENOVATION AREA ON THE GROUND FLOOR, AS WELL AS NEW EXTERIOR DOORS AND REPLACEMENT WINDOWS AS PER PLANS AS PER CODE. | — | May 20, 2025 |
| COM2024 | ***** UTILITIES CONNECTIONS TO BE MADE TO EXISTING UTILITIES ***** SCOPE OF WORK: ------ GRADING ----- (LOCATED AT THE AGORA BUILDING) THREE NEW VAULTS WILL BE INSTALLED ADJACENT TO THE AGORA BUILDING TO ENABLE UTILITY CONNECTIONS. TRENCHING AND/OR HORIZONTAL BORING BELOW WYMAN 1 IS REQUIRED TO MAKE CONNECTIONS FROM THE AGORA BUILDING TO WYMAN 1. TWO GENERATORS TO BE ADDED ATOP PADS. ----- EXTERIOR/INTERIOR ALTERATIONS (EQUIPMENT INSTALLATION) ------ TWO EXISTING WINDOWS WILL BE REMOVED AND SALVAGED AT THE NORTH FAÇADE OF THE WYMAN 1 BUILDING TO ENABLE ROUTING OF HOT AND COLD WATER PIPING THRU THESE EXISTING FAÇADE OPENINGS. THE OPENINGS ARE TO BE INFILLED WITH GROUND FACE CMU, INSULATION, AND INTERIOR SIDE FINISHES. AFTER THESE UTILITIES WILL BE ABANDONED THE INTERIM CLOSURE IS TO DEMOLISHED AND ORIGINAL WINDOWS WILL BE REINSTALLED. AT THE SECOND FLOOR OF WYMAN, 1 HOT AND COLD WATER PIPING WILL BE INSTALLED OVERHEAD. SEVERAL EXISTING WALLS ARE TO BE PENETRATED AS REQUIRED TO ENABLE ROUTING OF PIPING, AND ALL PENETRATIONS ARE BE REBUILT AND FIRESTOPPED AS REQUIRED TO MAINTAIN ALL REQUIRED FIRE RATINGS AS PER PLANS AS PER CODE. | — | Apr 28, 2025 |
| COM2024 | INSTALLING A PUBLIC SAFETY DAS SYSTEM AT THE SNF AGORA BUILDING THAT AS PER PLANS AS PER CODE. | — | Apr 24, 2025 |
| COM2024 | INTERIOR NON-STRUCTURAL DEMOLITION AND RENOVATION TO PORTION OF WYMAN FIRST FLOOR FOR NEW OFFICE SUITE. ADDITIONAL UPDATES TO FINISHES IN CORRIDOR AND ABOVE CEILING WORK FOR HVAC IN SURROUNDING SUITES, MINOR PLUMBING. ALL RENOVATION WORK AS PER PLANS AS PER CODE. | — | Feb 10, 2025 |
| COM2024 | SCOPE OF WORK: --------- LEVEL II INTERIOR ALTERATIONS --------- INTERIOR RENOVATION OF A PORTION OF THE SECOND FLOOR LEVEL OF THE JOHNS HOPKINS UNIVERSITY ''WYMAN 1'' BUILDING (THE OCCUPANCY OF THE WORK AREA IS ''BUSINESS'' AND INCLUDES OFFICES, MEETING ROOMS, AND CLASSROOM DRY LAB SPACES). RENOVATION INCLUDES EXTENSIVE DEMOLITION OF EXISITNG INTERIOR ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND COMMUNICATION SYSTEMS THROUGHOUT THE RENOVATION WORK AREA. ALL NEW SYSTEMS ARE INDICATED IN THE WORK AREA, WITH NO EXISTING SYSTEMS TO REMAIN EXCEPT THOSE REQUIRED FOR SERVICE OF OTHER ADJACENT OCCUPIED BUILDING AREAS. AS PER PLANS AS PER CODE. | $5,200,000 | Dec 4, 2024 |
| COM2024 | SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ SEVERAL EXISTING SPACES ARE BEING DEMOLISHED AND REPLACED WITH NEW INTERIOR FIT-OUT IN THESE AREAS. A THREE-STORY PORTION OF THE BUILDING IS BEING CONVERTED FROM OCCUPIED AREA TO UNOCCUPIED. RELATED TO THIS CHANGE, EXTERIOR DOORS ARE BEING ADDED TO MEET REQUIREMENTS FOR EXIT TRAVEL DISTANCE AS AN EXISTING STAIR AND EGRESS DISCHARGE WILL BE MADE INACCESSIBLE FROM REMAINING OCCUPIED PORTIONS OF THE GROUND AND 1ST FLOORS. SEVERAL EXISTING WINDOWS ARE BEING REMOVED AND SALVAGED. THE EXISTING OPENINGS ARE TO BE INFILLED WITH EITHER DOORS OR LOUVERS AS PER PLANS AS PER CODE. | $1,500,000 | Oct 23, 2024 |
| COM2024 | SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR RENOVATIONS TO FLOORS 3, 5, 6, & 7 TO RENOVATE EXISTING OFFICE SPACE TO NEW OFFICE AND SEMINAR ROOM SPACES. WORK INCLUDES INTERIOR NON-STRUCTURAL SELECTIVE DEMOLITION ON FLOORS 3 & 5; INTERIOR DEMOLITION FOR FLOORS 6 & 7 UNDER SEPARATE PERMIT #COM2024-00356. ALL RENOVATION WORK PER PLANS | $15,000,000 | Sep 3, 2024 |
| COM2024 | AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2024-01279:REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01279) REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE. | — | Aug 27, 2024 |
| COM2024 | REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE. | $250,000 | Aug 26, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-79542:INSTALL (300) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2023-79542) INSTALL (300) # LOW VOLTAGE AS PER CODE. | — | Jun 24, 2024 |
| COM2022 | INSTALL FIRE ALARM SYSTEM AS PER PLANS AS PER CODE. | $200,000 | May 14, 2024 |
| COM2024 | INTERIOR NON-STRUCTURAL SELECTIVE DEMOLITION WORK ONLY OF OFFICE SPACES PER PLANS AND SPECIFICATIONS. NEW RENOVATION WORK WILL BE SUBMITTED AS A SEPARATE PERMIT APPLICATION AT A LATER DATE. | $500,000 | Apr 10, 2024 |
| COM2024 | INSTALL (610) # LOW VOLTAGE AS PER CODE.(ASSOSCIATED WITH PLAN# 2021-1838 FOR SPEAKERS AND ASSOCIATED DEVICES). | $54,742,000 | Feb 23, 2024 |
| COM2024 | INSTALL (894) # LOW VOLTAGE AS PER CODE. | $350,000 | Jan 26, 2024 |
| COM2023 | AMEND PERMIT:CHANGE ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Oct 5, 2023 |
| COM2023 | HOT FLUID WATERPROOFING TO OUR EXISTING STRUCTURE AS PER PLANS AS PER CODE. (THIS WORK NEEDS TO HAPPEN BETWEEN THE HOURS OF 7PM AND 4AM BECAUSE OF THE FUMES THAT WILL BE ARISE FROM THE WORK AND THE PROXIMITY OF OUR SITE IN RELATIONSHIP TO THE EARLY LEARNING CENTER AT 200 WYMAN PARK DRIVE). | $82,000 | Sep 21, 2023 |
| COM2023 | INSTALL (300) # LOW VOLTAGE AS PER CODE. | $10,000 | Sep 13, 2023 |
| COM2023 | AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2021-02613:CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2021-02613) CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. | — | Sep 12, 2023 |
| COM2022 | PROVIDE A COMPLETE SPRINKLER SYSTEM (1,251 HEADS) FOR JHU - SNF AGORA INSTITUTE AS PER PLANS AS PER CODE. | $498,768 | Mar 28, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR. (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) ORIGINAL PERMIT DESCRIPTION:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Mar 22, 2023 |
| COM2022 | INSTALL NEW FIRE ALARM SYSTEM IN EXISTING BUILDING AS PER PLANS AS PER CODE. | $50,000 | Jan 18, 2023 |
| COM2022 | THE SCOPE WILL BEGIN AT THE FLANGE OF THE NEW INCOMING WATER SUPPLY, INSTALL A NEW BACKFLOW PREVENTER AND FIRE PUMP TO SUPPLY A NEW SPRINKLER SYSTEM (578 HEADS) AND STANDPIPE SYSTEM THROUGHOUT THE BUILDING, INSTALL A NEW SPRINKLER SYSTEM ON THE GROUND FLOOR THROUGH THE ATTIC FLOOR IN NEW AND EXISTING AREAS AS PER PLANS AS PER CODE. | $932,991 | Oct 20, 2022 |
| COM2022 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. | — | Oct 5, 2022 |
| COM2022 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2021-02613:CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2021-02613) CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. | — | Oct 5, 2022 |
| COM2021 | CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. | $54,742,000 | Sep 27, 2022 |
| COM2022 | AMEND TO ADD HVAC CONTRACTOR: (ORIGINAL PERMIT:COM2022-78161: EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) ORIGINAL PERMIT DESCRIPTION:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-78161) Extend Original Permit.(original permit:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE. | — | Sep 13, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE. | — | Aug 23, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- permit: BRCMJul 9, 2026 · 136 m · 3170 REMINGTON AVE
- permit: BRCMJun 30, 2026 · 137 m · 279 W 31ST ST
- violation: SW-Dirty AlleyJun 4, 2026 · 108 m
- violation: HCD-CCE Building Permit ComplaintMay 27, 2026 · 134 m
- permit: BRCMApr 3, 2026 · 140 m · 3174 REMINGTON AVE
- permit: BUSEMar 16, 2026 · 125 m · 3126 REMINGTON AVE
- violation: HCD-Maintenance StructureFeb 19, 2026 · 123 m · 257 W 31ST ST
- violation: SW-Dirty AlleyFeb 18, 2026 · 108 m
- violation: BC 123.8.1Dec 24, 2025 · 140 m · 3174 REMINGTON AVE
- permit: BRCMSep 17, 2025 · 144 m · 289 W 31ST ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.