Baltimore City · 21211

3100 WYMAN PARK DR

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$23,123,000
Land use
Exempt Commercial (EC)
Year built
1933
Last sale
Oct 13, 2021

This owner holds 104 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerJOHNS HOPKINS UNIVERSITY, THE
Land useExempt Commercial (EC)
Total assessment$23,123,000 (cycle 2026)
Last saleOct 13, 2021 — $3,321,000
Year built1933
ZoningEC-2
Vacant

Permits

showing 50 of 104
TypeDescriptionCostIssued
BCCMRENOVATE FLOORS 2 & 3 FOR USE AS CONSTRUCTION FIELD OFFICES WITHIN EXISTING SHELL SPACE TO INCLUDE PROVIDING ARCHITECTURAL PARTITIONS, DOORS & FRAMES, AND FLOOR, WALL, AND CEILING FINISHES AS SHOWN ON PLANS; PROVIDE NEW MECHANICAL CONDITIONING AND VENTILATION SYSTEMS FOR FLOORS 2 & 3; PROVIDE PLUMBING SYSTEMS AND FIXTURES FOR NEW TOILET ROOMS ON FLOORS 2 & 3; PROVIDE NEW BRANCH POWER, DATA, AND LED LIGHTING TO SERVE FLOORS 2 & 3; PROVIDE LIFE SAFETY IMPROVEMENTS FOR WHOLE BUILDING INCLUDING THE FOLLOWING: PROVIDE NEW 2-HOUR RATED STAIR SHAFT ENCLOSURES AROUND EXISTING STAIRS.$3,287,982Jun 16, 2026
BCCMAdd devices to existing fire alarm system.$7,000May 29, 2026
BCCMRemoval of two (2) 12,000-gallon aboveground storage tanks (ASTs) and one 300-gallon AST. As per plans as per code. Another company will facilitate the piping as per applicant$24,678Apr 28, 2026
BDEMCentral Utility Plant Demolition (5300 SF), including underground connector tunnel, with remaining entranceway shored up.Apr 10, 2026
BCCMSCOPE OF WORK: ------- ADDITION ---------- Two separate additions to the existing building - New Substation addition: 1,700 s.f. (1 story) and New Storage building section addition: 1,300 s.f. (1 story). Where the storage building section connects to the main existing building, will infill 1 existing window opening. -------- SITE WORK -------- grading, paving -------- RETAINING WALL -------- construction of a retaining wall ------- EXTERIOR ALTERATIONS ------- facade repair where grade will change at the exterior wall interface (approx. 70 feet). AS PER PLANS AND AS PER CODE.$3,686,000Mar 12, 2026
BCCMProvide and install, 90 flush mount 2-data locations, 1 flush mount 4 data location, 21 ceiling mount 2-data locations, 3 ceiling mount 1 data location, 11 ceiling mount 2 data wireless access points and install 11 JHU provided wireless access points.$0Feb 17, 2026
BCCMSupport of Excavation installation and placement, which includes -174 soldier piles with lagging in between and tiebacks for lateral support where needed. As per plans and as per code.$2,300,000Feb 17, 2026
BCCMProvide and install forty-six (44) flush mount 2-data locations. Provide and install eleven (11) ceiling mount 2-data locations. Provide and install ten (10) ceiling mount 2-data wireless access point locations.$0Feb 4, 2026
BCCM********* Amend issued Permit #COM2024-01603 / Plans#2024-1414 for the following scope-******* SCOPE OF WORK: -------- GRADING -------- - Exterior Utility work including upgrades and relocations of primary and emergency electric ductbanks, telecommunication ductbanks, chilled water service + return pipes, heating hot water service + return pipes, fire/domestic water mains and service connections, fire hydrants, sanitary sewer, and storm drains, as well as in-kind surface restoration. -------- INTERIOR ALTERATIONS ----------- - Renovation of interior space to replace existing offices with new chilled water pump room with associated lighting, mechanical, piping, and sprinkler coordination. - Replacement of existing water heaters and connection to new water heaters in new location. - Installation of three new building chilled water pumps within a new constructed pump room. Building chilled water pumps will be connected to the campus chilled water system as well as the existing Wyman Building 1 underground chilled water piping. - New chilled and heating hot water vaults are to be provided for routing of new campus chilled and heating hot water pipes to Wyman Building 1 and (future) DSAI building. AS PER PLANS AND AS PER CODE.$2,300,000Jan 30, 2026
BCCMInstallation of an Automatic temperature Control System. as per code.$0Jan 20, 2026
BCCMINSTALL FIRE ALARM SYSTEM AS PER PLANS AND CODE$0Dec 30, 2025
COM2024 ********** 3100 WYMAN PARK DRIVE (SOUTH PARCEL) ******* SCOPE OF WORK: ----- GRADING -------- SITE EXCAVATION (INCLUDING REMOVAL OF PRIVATE ROADWAY, PARKING LOT, SIDEWALKS, BUILDING FOUNDATION SLABS [FROM WYMAN 1 TAIL DEMO AND WYMAN CHILLER PLAN DEMO]); EXISTING SITE UTILITIES REMOVAL (INCLUDING STORM, SANITARY, GAS, SITE LIGHTING); MASS EXCAVATION AND GRADING; SITE WORK (INCLUDING TEMPORARY PAVING TO SUPPORT CONSTRUCTION ACTIVITIES & TEMPORARY TRASH/LOADING ACTIVITIES), INSTALLATION OF NEW UNDERGROUND UTILITIES (STORM, SANITARY, ELECTRIC, DOMESTIC WATER, HEATING HOT WATER). LOD 254,426 SF; CUT / FILL 36,028 CY AS PER PLANS AS PER CODE. Dec 19, 2025
BCCMFire alarm work, add to existing SLC and A/Vs. No changes will be made to the existing sequences of operations. (5) Smoke Detector heads, (1) Heat detector, (4) Duct Smoke Detector Housing, (3) Strobe, (31) Speaker Strobe,$16,000Nov 21, 2025
BCCMThe scope of work includes removing the existing mains, branchlines and heads in the existing area of work. BFPE will run new main, branchlines, and sprinkler heads to provide the proper coverage in the newly renovated space.$104,782Nov 17, 2025
BCCM********** Site Work Only. includes all work related to the site preparation and installation of interim loading areas and access ******* SCOPE OF WORK: ------- EXTERIOR ALTERATIONS --------- Exterior Work Only includes 3-story demolition of facade tail portion and necessary infill (WILL CONSIST OF PLACEMENT OF NEW EXTERIOR WALL AND NEW WINDOWS SITTING UPON EXISTING OR NEW FOUNDATIONS; ) of removed façade areas to enclose the Wyman 1 Building; --------- INTERIOR ALTERATIONS ------- Interior Work Only includes construction of new entrance lobby with access stair and lift and related improvements (A NEW EXIT ACCESS STAIR WILL BE PROVIDED TO CONNECT THE FIRST FLOOR TAIL AREA WITH THE EXTERIOR.). AS PER PLANS AND AS PER CODE.$6,400,000Nov 7, 2025
BCCMFire alarm. Electrical and Fire detection upgrades as per plans as per code.$959,000Nov 3, 2025
BTEMPLimited one day event to present new Agora Building to limited invite only audience, 10AM-2PM, with limited set up completed on 10.14.25.$5,000Oct 20, 2025
BCCMElectrical work Only - 70 fixtures and devices; 7 Low voltage devices; 1 Tele Grounding/Bonding$0Sep 17, 2025
BCCMAmend Permit COM#2021-02613/ approved Plans#2021-1838 to add PV System Installation$453,000Sep 2, 2025
BCCMINSTALL 2 SMOKE DETECTORS AND 2 SPEAKER STROBERS AS PER CODE$8,000Aug 25, 2025
BCCMSprinkler, add 120 new sprinkler heads. The scope of work includes removing the existing two and a half inch main back to the Pro Shop G40. BFPE will run a new main to extend the sprinkler system to provide the proper coverage.$90,250Jul 31, 2025
BCCMThe scope of work includes removing and capping the existing branchlines that feed lab spaces that will be demoed. BFPE will run a new branchline to install 5 sidewall heads in the newly renovated Pump Room.$10,950Jul 23, 2025
BCCMThe scope of work includes BFPE extending the existing sprinkler system. BFPE will intall an new two and a half inch main, branchlines, and 23 concealed sprinkler heads to provide the proper coverage in the newly renovated office and storage space.$104,782Jun 6, 2025
COM2024 ********* AMEND PERMIT COM2024-01604 PLAN NO 2024-1415 ISSUED 10/23/2024 ****** SCOPE OF WORK: ------- INTERIOR/EXTERIOR ALTERATIONS --------- FOR THE INCREASED RENOVATION AREA ON THE GROUND FLOOR, AS WELL AS NEW EXTERIOR DOORS AND REPLACEMENT WINDOWS AS PER PLANS AS PER CODE.May 20, 2025
COM2024 ***** UTILITIES CONNECTIONS TO BE MADE TO EXISTING UTILITIES ***** SCOPE OF WORK: ------ GRADING ----- (LOCATED AT THE AGORA BUILDING) THREE NEW VAULTS WILL BE INSTALLED ADJACENT TO THE AGORA BUILDING TO ENABLE UTILITY CONNECTIONS. TRENCHING AND/OR HORIZONTAL BORING BELOW WYMAN 1 IS REQUIRED TO MAKE CONNECTIONS FROM THE AGORA BUILDING TO WYMAN 1. TWO GENERATORS TO BE ADDED ATOP PADS. ----- EXTERIOR/INTERIOR ALTERATIONS (EQUIPMENT INSTALLATION) ------ TWO EXISTING WINDOWS WILL BE REMOVED AND SALVAGED AT THE NORTH FAÇADE OF THE WYMAN 1 BUILDING TO ENABLE ROUTING OF HOT AND COLD WATER PIPING THRU THESE EXISTING FAÇADE OPENINGS. THE OPENINGS ARE TO BE INFILLED WITH GROUND FACE CMU, INSULATION, AND INTERIOR SIDE FINISHES. AFTER THESE UTILITIES WILL BE ABANDONED THE INTERIM CLOSURE IS TO DEMOLISHED AND ORIGINAL WINDOWS WILL BE REINSTALLED. AT THE SECOND FLOOR OF WYMAN, 1 HOT AND COLD WATER PIPING WILL BE INSTALLED OVERHEAD. SEVERAL EXISTING WALLS ARE TO BE PENETRATED AS REQUIRED TO ENABLE ROUTING OF PIPING, AND ALL PENETRATIONS ARE BE REBUILT AND FIRESTOPPED AS REQUIRED TO MAINTAIN ALL REQUIRED FIRE RATINGS AS PER PLANS AS PER CODE. Apr 28, 2025
COM2024INSTALLING A PUBLIC SAFETY DAS SYSTEM AT THE SNF AGORA BUILDING THAT AS PER PLANS AS PER CODE.Apr 24, 2025
COM2024INTERIOR NON-STRUCTURAL DEMOLITION AND RENOVATION TO PORTION OF WYMAN FIRST FLOOR FOR NEW OFFICE SUITE. ADDITIONAL UPDATES TO FINISHES IN CORRIDOR AND ABOVE CEILING WORK FOR HVAC IN SURROUNDING SUITES, MINOR PLUMBING. ALL RENOVATION WORK AS PER PLANS AS PER CODE.Feb 10, 2025
COM2024SCOPE OF WORK: --------- LEVEL II INTERIOR ALTERATIONS --------- INTERIOR RENOVATION OF A PORTION OF THE SECOND FLOOR LEVEL OF THE JOHNS HOPKINS UNIVERSITY ''WYMAN 1'' BUILDING (THE OCCUPANCY OF THE WORK AREA IS ''BUSINESS'' AND INCLUDES OFFICES, MEETING ROOMS, AND CLASSROOM DRY LAB SPACES). RENOVATION INCLUDES EXTENSIVE DEMOLITION OF EXISITNG INTERIOR ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND COMMUNICATION SYSTEMS THROUGHOUT THE RENOVATION WORK AREA. ALL NEW SYSTEMS ARE INDICATED IN THE WORK AREA, WITH NO EXISTING SYSTEMS TO REMAIN EXCEPT THOSE REQUIRED FOR SERVICE OF OTHER ADJACENT OCCUPIED BUILDING AREAS. AS PER PLANS AS PER CODE.$5,200,000Dec 4, 2024
COM2024SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ SEVERAL EXISTING SPACES ARE BEING DEMOLISHED AND REPLACED WITH NEW INTERIOR FIT-OUT IN THESE AREAS. A THREE-STORY PORTION OF THE BUILDING IS BEING CONVERTED FROM OCCUPIED AREA TO UNOCCUPIED. RELATED TO THIS CHANGE, EXTERIOR DOORS ARE BEING ADDED TO MEET REQUIREMENTS FOR EXIT TRAVEL DISTANCE AS AN EXISTING STAIR AND EGRESS DISCHARGE WILL BE MADE INACCESSIBLE FROM REMAINING OCCUPIED PORTIONS OF THE GROUND AND 1ST FLOORS. SEVERAL EXISTING WINDOWS ARE BEING REMOVED AND SALVAGED. THE EXISTING OPENINGS ARE TO BE INFILLED WITH EITHER DOORS OR LOUVERS AS PER PLANS AS PER CODE. $1,500,000Oct 23, 2024
COM2024SCOPE OF WORK: ------- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR RENOVATIONS TO FLOORS 3, 5, 6, & 7 TO RENOVATE EXISTING OFFICE SPACE TO NEW OFFICE AND SEMINAR ROOM SPACES. WORK INCLUDES INTERIOR NON-STRUCTURAL SELECTIVE DEMOLITION ON FLOORS 3 & 5; INTERIOR DEMOLITION FOR FLOORS 6 & 7 UNDER SEPARATE PERMIT #COM2024-00356. ALL RENOVATION WORK PER PLANS $15,000,000Sep 3, 2024
COM2024AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2024-01279:REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2024-01279) REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE.Aug 27, 2024
COM2024REPLACE THE EXISTING 4" SANITARY LINE ON THE GROUND FLOOR WITH A NEW 6" SANITARY LINE AND CONNECT IT TO THE SAME EXISTING STRUCTURE ON SITE AS PER PLANS AS PER CODE.$250,000Aug 26, 2024
COM2024REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-79542:INSTALL (300) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2023-79542) INSTALL (300) # LOW VOLTAGE AS PER CODE.Jun 24, 2024
COM2022INSTALL FIRE ALARM SYSTEM AS PER PLANS AS PER CODE.$200,000May 14, 2024
COM2024INTERIOR NON-STRUCTURAL SELECTIVE DEMOLITION WORK ONLY OF OFFICE SPACES PER PLANS AND SPECIFICATIONS. NEW RENOVATION WORK WILL BE SUBMITTED AS A SEPARATE PERMIT APPLICATION AT A LATER DATE.$500,000Apr 10, 2024
COM2024INSTALL (610) # LOW VOLTAGE AS PER CODE.(ASSOSCIATED WITH PLAN# 2021-1838 FOR SPEAKERS AND ASSOCIATED DEVICES). $54,742,000Feb 23, 2024
COM2024INSTALL (894) # LOW VOLTAGE AS PER CODE.$350,000Jan 26, 2024
COM2023AMEND PERMIT:CHANGE ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. Oct 5, 2023
COM2023HOT FLUID WATERPROOFING TO OUR EXISTING STRUCTURE AS PER PLANS AS PER CODE. (THIS WORK NEEDS TO HAPPEN BETWEEN THE HOURS OF 7PM AND 4AM BECAUSE OF THE FUMES THAT WILL BE ARISE FROM THE WORK AND THE PROXIMITY OF OUR SITE IN RELATIONSHIP TO THE EARLY LEARNING CENTER AT 200 WYMAN PARK DRIVE). $82,000Sep 21, 2023
COM2023INSTALL (300) # LOW VOLTAGE AS PER CODE.$10,000Sep 13, 2023
COM2023AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR .(ORIGINAL PERMIT:COM2021-02613:CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2021-02613) CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. Sep 12, 2023
COM2022PROVIDE A COMPLETE SPRINKLER SYSTEM (1,251 HEADS) FOR JHU - SNF AGORA INSTITUTE AS PER PLANS AS PER CODE.$498,768Mar 28, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR. (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) ORIGINAL PERMIT DESCRIPTION:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. Mar 22, 2023
COM2022INSTALL NEW FIRE ALARM SYSTEM IN EXISTING BUILDING AS PER PLANS AS PER CODE.$50,000Jan 18, 2023
COM2022THE SCOPE WILL BEGIN AT THE FLANGE OF THE NEW INCOMING WATER SUPPLY, INSTALL A NEW BACKFLOW PREVENTER AND FIRE PUMP TO SUPPLY A NEW SPRINKLER SYSTEM (578 HEADS) AND STANDPIPE SYSTEM THROUGHOUT THE BUILDING, INSTALL A NEW SPRINKLER SYSTEM ON THE GROUND FLOOR THROUGH THE ATTIC FLOOR IN NEW AND EXISTING AREAS AS PER PLANS AS PER CODE.$932,991Oct 20, 2022
COM2022AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2021-00292:CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. ) Original Permit Description:(COM2021-00292) CONSTRUCT ADDITION AND INTERIOR RENOVATIONS TO EXISTING UNIVERSITY BUILDING.ALL SITE WORK COVERED UNDER PLANS#2020-2583. THE CORE ADDITION PROVIDES REPLACEMENT ELEVATORS FOR THE BUILDING IN NEW CONSTRUCTION. THIS SCOPE ALSO INCLUDES THE CONSTRUCTION OF A NEW SCREEN WALL ON THE ROOF OF THE WEST WING AND IMPROVEMENTS TO THE EXTERIOR ENVELOPE. THE BUILDING INFRASTRUCTURE COMPONENT FOCUSES ON THE INSTALLATION OF NEW BUILDING SYSTEMS (MECHANICAL, ELECTRICAL, AND TELECOM) IN A CENTRALIZED APPROACH AND THE CREATION OF A CENTRALIZED BLOCK OF ADA COMPLIANT TOILET ROOMS AT THE CORE OF THE INTERIOR BUILDING. CODE UPGRADES TO THE BUILDING ADDRESS ISSUES OF COMPLIANCE IN THE EXISTING STAIRS FOR HANDRAILS AND GUARDRAILS, A NEW ?RE PUMP AND ?RE PUMP ROOM, UPDATES TO THE EXISTING SPRINKLER SYSTEM TO PROVIDE COVERAGE AT THE ATTIC, PROTECTION OF COMBUSTIBLE CONSTRUCTION TO MEET A CONSTRUCTION TYPE IIA AND MODI?CATIONS REQUIRED TO MEET THE CODE REQUIREMENTS OF A HIGH RISE (INCLUDING EMERGENCY ELECTRICAL PANELS ON EVERY ?OOR AND A ?RE COMMAND CENTER). NEW CONSTRUCTION DIMENSIONS - 125,000 CUBIC FEET / 10,150 SQUARE FEET. RENOVATIONS DIMENSIONS - 45,000 SQUARE FEET; INCLUDES THE 4,500 SF EXTERIOR MECHANICAL EQUIPMENT SCREENWALL ENCLOSURE AT THE 7TH FLOOR. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEMS. Oct 5, 2022
COM2022AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2021-02613:CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2021-02613) CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. Oct 5, 2022
COM2021CONSTRUCT THE STAVROS NIARCHOS FOUNDATION AGORA INSTITUTE BUILDING AT JOHNS HOPKINS UNIVERSITY WHICH WILL INCLUDE FACULTY OFFICES, DRY LABS, CLASSROOMS, MEETING/CONFERENCE SPACES, SEMINAR ROOMS, CO-WORKING SPACES AND A CAFE, THE BUILDING WILL BE 4 STORIES ABOVE GRADE AND 1 STORY BELOW GRADE (OCCUPANCY TYPES B,A AND S WITH A MIX OF USES CONSTRUCTION TYPE IIA) AS PER PLANS AS PER CODE. $54,742,000Sep 27, 2022
COM2022AMEND TO ADD HVAC CONTRACTOR: (ORIGINAL PERMIT:COM2022-78161: EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) ORIGINAL PERMIT DESCRIPTION:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2022-78161) Extend Original Permit.(original permit:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.Sep 13, 2022
COM2022 Extend Original Permit.(original permit:COM2020-02216:INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-02216) INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF HEATING HOT, CHILLED AND DOMESTIC WATER PIPING FROM EAST SIDE OF WYMAN PARK DRIVE AND CONTINUATION OF ELEC, TELECOM AND THE ABOVE NOTED UTILITIES TO THE WEST SIDE OF WYMAN PARK DRIVE AND CAPPED FOR FUTURE USE AS PER PLANS AS PER CODE.Aug 23, 2022

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.