Baltimore City · 21218

200 WYMAN PARK DR

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$11,833,333
Land use
Exempt Commercial (EC)
Year built
Last sale
Jun 7, 1962

This owner holds 104 Baltimore City properties (Pro feature — join the waitlist).

Assessment

OwnerJOHNS HOPKINS UNIVERSITY, THE
Land useExempt Commercial (EC)
Total assessment$11,833,333 (cycle 2026)
Last saleJun 7, 1962
Year built
ZoningEC-2
Vacant

Permits

showing 50 of 57
TypeDescriptionCostIssued
BCCMPartial interior renovation (10,000 sf) of a 23,000 SF office suite. Selective demolition of interior walls, lighting, ceiling and finishes. New interior partition walls, ceiling, lighting and finishes. Mechanical and electrical work to accommodate the new configuration. As per plans and as per code.$1,500,000Jun 18, 2026
BCCMSCOPE OF WORK: --- GRADING ---- Associated with Installation / creation of 95 piles within the property boundaries. AS PER PLANS AND AS PER CODE$659,200May 14, 2026
COM2024 ********** 200 WYMAN PARK DRIVE (NORTH PARCEL) ********** SCOP OF WORK: ----- GRADING ----- SITE EXCAVATION (INCLUDING REMOVAL OF PRIVATE ROADWAY, PARKING LOT, SIDEWALKS, REMAINING BUILDING FOUNDATION SLAB [FROM EARLY LEARNING CENTER DEMO]), EXISTING SITE UTILITIES REMOVAL (INCLUDING STORM, SANITARY, GAS, SITE LIGHTING); MASS EXCAVATION AND GRADING; INSTALLATION OF NEW UNDERGROUND UTILITIES (STORM, GAS, TELECOM, LOW VOLTAGE ELECTRIC). LOD - 112,797 SF; CUT/FILL - 15,973 CY AS PER PLANS AS PER CODE. Dec 19, 2025
BCCMLab 106 and 142B modify existing wet pipe sprinkler system$7,000Nov 28, 2025
COM2025SCOPE OF WORK: ------- INTERIOR ALTERATIONS (EQUIPMENT) -------- REMOVAL AND REPLACEMENT OF 120 CHILLER WITH MECHANICAL AND ELECTRICAL CONNECTIONS. AUTOMATIC TEMPERATURE CONTROL UPGRADES. AS PER PLANS AND AS PER CODE.Nov 10, 2025
BCCMOLIN HALL FIRST FLOOR INTERIOR RENOVATION - INSTALLATION OF 32 LOW VOLTAGE DATA CABLES IN SUPPORT OF BUILDING PERMIT BCCM-25-001231$15,000Sep 10, 2025
COM2024MAINTENANCE DREDGING PROJECT WITHIN THE EXISTING FOOTPRINT OF THE SWM POND AND WILL UPDATE THE SWM POND TO MODERN DESIGN STANDARDS AS PER PLANS AS PER CODE.Aug 27, 2025
BCCM********* THIS PROJECT IS FOR THE INTERIOR RENOVATION OF TWO EXISTING LAB SPACES ON THE FIRST FLOOR OF OLIN HALL.******** THE SCOPE OF WORK -------- LEVEL I INTERIOR ALTERATIONS --------- INCLUDES NEW FINISHES, CASEWORK. ------- TRADE WORKS ------- MECHANICAL, PLUMBING, AND ELECTRICAL MODIFICATIONS TO THE EXISTING SPACES. AS PER PLANS AND AS PER CODE.Jul 10, 2025
COM2024INSTALL 6 STROBES AS PER PLANS AS PER CODE$3,500Sep 13, 2024
COM2023FURNISH & INSTALL (1) 3 PHASE 400AMP MAIN BREAKER PANEL FOR EV CHARGER INFRASTRUCTURE. INSTALL NEW 150KVA TRANSFORMER IN ELECTRIC ROOM W/ CONDUIT & WIRING FROM TRANSFORMERS TO NEW 400AMP PANEL. WORK PER DRAWINGS.$5,000Jun 28, 2024
COM2024[ADD 6 AND RELOCATE 4] RELOCATE THE EXISTING SPRINKLER COVERAGE IN THE APPROXIMATE 650SQFT AREA ON THE 2ND FLOOR OF THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. THESE AREAS WILL BE TREATED AS LIGHT HAZARD AND SPRINKLER COVERAGE WILL BE 225 SQFT. THE EXISTING PIPE SCHEDULE WILL BE MAINTAINED AND ALL SPRINKLERS WILL BE REPLACED IN THESE AREAS AS PART OF THE TENANT IMPROVEMENTS. AS PER PLANS AS PER CODE. $9,450May 1, 2024
COM2024REMOVE AND REPLACE REFRIGERATION EQUIPMENT AS PER CODE.$15,991Mar 26, 2024
COM2024ADDITION OF TWO DOORS AND INTERIOR NON-BEARING GLASS WALL SYSTEM REPLACEMENT WITH DRYWALL AND STUDS. AS PER CODE.$20,000Mar 22, 2024
COM2024AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2024-00132:SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- PARTIAL RENOVATION TO THE SECOND FLOOR OFFICES 274 & 276 IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. WITHIN THESE TWO OFFICES, THE AREA OF WORK IS LIMITED TO AN AREA APPROXIMATELY 91 SQUARE FEET (HIGHLIGHTED ON THE DRAWING COVER SHEET) IN WHICH THE FOLLOWING WORK WILL BE DONE: - DEMOLISH DIVIDING WALL BETWEEN OFFICES 274 AND 276 TO CREATE A SINGLE ENLARGED OFFICE - REPAIR WINDOW SILL AT INTERSECTION WITH DEMOLISHED WALL - BUILD GWB CEILING AT LOCATION OF DEMOLISHED WALL SO THAT EXISTING ACT CEILINGS, MECHANICAL DIFFUSERS, AND SPRINKLERS CAN REMAIN IN WHAT WAS 274 AND 276 - REPLACE DEMOUNTABLE GLAZED PARTITION AT 276 WITH GWB - INSTALL NEW CARPET IN COMBINED 274/276 OFFICE AS PER PLANS AS PER CODE. (PLEASE NOTE THAT THIS PERMIT IS FOR ARCHITECTURAL SCOPE ONLY) ) Original Permit Description:(COM2024-00132) SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- PARTIAL RENOVATION TO THE SECOND FLOOR OFFICES 274 & 276 IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. WITHIN THESE TWO OFFICES, THE AREA OF WORK IS LIMITED TO AN AREA APPROXIMATELY 91 SQUARE FEET (HIGHLIGHTED ON THE DRAWING COVER SHEET) IN WHICH THE FOLLOWING WORK WILL BE DONE: - DEMOLISH DIVIDING WALL BETWEEN OFFICES 274 AND 276 TO CREATE A SINGLE ENLARGED OFFICE - REPAIR WINDOW SILL AT INTERSECTION WITH DEMOLISHED WALL - BUILD GWB CEILING AT LOCATION OF DEMOLISHED WALL SO THAT EXISTING ACT CEILINGS, MECHANICAL DIFFUSERS, AND SPRINKLERS CAN REMAIN IN WHAT WAS 274 AND 276 - REPLACE DEMOUNTABLE GLAZED PARTITION AT 276 WITH GWB - INSTALL NEW CARPET IN COMBINED 274/276 OFFICE AS PER PLANS AS PER CODE. (PLEASE NOTE THAT THIS PERMIT IS FOR ARCHITECTURAL SCOPE ONLY) Mar 8, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2024-00132:SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- PARTIAL RENOVATION TO THE SECOND FLOOR OFFICES 274 & 276 IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. WITHIN THESE TWO OFFICES, THE AREA OF WORK IS LIMITED TO AN AREA APPROXIMATELY 91 SQUARE FEET (HIGHLIGHTED ON THE DRAWING COVER SHEET) IN WHICH THE FOLLOWING WORK WILL BE DONE: - DEMOLISH DIVIDING WALL BETWEEN OFFICES 274 AND 276 TO CREATE A SINGLE ENLARGED OFFICE - REPAIR WINDOW SILL AT INTERSECTION WITH DEMOLISHED WALL - BUILD GWB CEILING AT LOCATION OF DEMOLISHED WALL SO THAT EXISTING ACT CEILINGS, MECHANICAL DIFFUSERS, AND SPRINKLERS CAN REMAIN IN WHAT WAS 274 AND 276 - REPLACE DEMOUNTABLE GLAZED PARTITION AT 276 WITH GWB - INSTALL NEW CARPET IN COMBINED 274/276 OFFICE AS PER PLANS AS PER CODE. (PLEASE NOTE THAT THIS PERMIT IS FOR ARCHITECTURAL SCOPE ONLY) ) Original Permit Description:(COM2024-00132) SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- PARTIAL RENOVATION TO THE SECOND FLOOR OFFICES 274 & 276 IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. WITHIN THESE TWO OFFICES, THE AREA OF WORK IS LIMITED TO AN AREA APPROXIMATELY 91 SQUARE FEET (HIGHLIGHTED ON THE DRAWING COVER SHEET) IN WHICH THE FOLLOWING WORK WILL BE DONE: - DEMOLISH DIVIDING WALL BETWEEN OFFICES 274 AND 276 TO CREATE A SINGLE ENLARGED OFFICE - REPAIR WINDOW SILL AT INTERSECTION WITH DEMOLISHED WALL - BUILD GWB CEILING AT LOCATION OF DEMOLISHED WALL SO THAT EXISTING ACT CEILINGS, MECHANICAL DIFFUSERS, AND SPRINKLERS CAN REMAIN IN WHAT WAS 274 AND 276 - REPLACE DEMOUNTABLE GLAZED PARTITION AT 276 WITH GWB - INSTALL NEW CARPET IN COMBINED 274/276 OFFICE AS PER PLANS AS PER CODE. (PLEASE NOTE THAT THIS PERMIT IS FOR ARCHITECTURAL SCOPE ONLY) Mar 6, 2024
COM2024AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2024-00133: ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2024-00133) ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. Mar 1, 2024
COM2024AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2024-00133: ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2024-00133) ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. Mar 1, 2024
COM2024AMEND PERMIT: ADD PLUMBER CONTRACTOR .(ORIGINAL PERMIT:COM2024-00133: ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. ) Original Permit Description:(COM2024-00133) ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. Mar 1, 2024
COM2024SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------- PARTIAL RENOVATION TO THE SECOND FLOOR OFFICES 274 & 276 IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS. WITHIN THESE TWO OFFICES, THE AREA OF WORK IS LIMITED TO AN AREA APPROXIMATELY 91 SQUARE FEET (HIGHLIGHTED ON THE DRAWING COVER SHEET) IN WHICH THE FOLLOWING WORK WILL BE DONE: - DEMOLISH DIVIDING WALL BETWEEN OFFICES 274 AND 276 TO CREATE A SINGLE ENLARGED OFFICE - REPAIR WINDOW SILL AT INTERSECTION WITH DEMOLISHED WALL - BUILD GWB CEILING AT LOCATION OF DEMOLISHED WALL SO THAT EXISTING ACT CEILINGS, MECHANICAL DIFFUSERS, AND SPRINKLERS CAN REMAIN IN WHAT WAS 274 AND 276 - REPLACE DEMOUNTABLE GLAZED PARTITION AT 276 WITH GWB - INSTALL NEW CARPET IN COMBINED 274/276 OFFICE AS PER PLANS AS PER CODE. (PLEASE NOTE THAT THIS PERMIT IS FOR ARCHITECTURAL SCOPE ONLY) $27,200Mar 1, 2024
COM2024 ***** [ROOMS 205M AND 205W] ****** SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ------ INTERIOR ALTERATION FOR RESTROOM TO CONSISTS OF A PARTIAL RENOVATION TO THE SECOND FLOOR TOILET IN THE SAN MARTIN BUILDING ON THE JOHNS HOPKINS UNIVERSITY CAMPUS, ENLARGE THE STALLS AND MAKE THEM PRIVATE STALLS, WITHIN THESE TOILET ROOMS, THE AREA OF WORK IS LIMITED TO THE 95.3 SQUARE FEET OF THE EXISTING RECESSED TOILET STALL AREA WITHIN EACH ROOM, RESULTING IN AN OVERALL 190.6 SQUARE FOOT AREA OF IMPACT) AS PER PLANS AS PER CODE. $71,500Feb 28, 2024
COM2023MODIFY EXISTING WET SPRINKLER SYSTEM BY ADDING 24 SPRINKLERS TO ACCOMODATE NEW INTERIOR ALT AS PER PLANS PER CODE. ALL WORK PERFORMED UNDER NFPA 13-2016. MATCH EXISTING ORDINARY HAZARD OCCUPANCY AND MAX PROTECTION AREA OF 120 SQFT BETWEEN SPRINKLERS AS PER PLANS AS PER CODE.$15,000Jun 29, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2023-00128:INTERIOR RENOVATION OF EXISTING LABORATORY SPACES (TO SUIT USERS REQUIREMENTS) WITH ALTERATIONS TO EXISTING NON-STRUCTURAL PARTITIONS AND MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO SUPPORT NEW LAYOUT AND NEW FINISHES, EXISTING BUILDING PROVIDES ACCESSIBLE ROUTES VIA CORRIDORS, RAMPS, AND ELEVATORS TO GRADE, (ALTERATIONS MAKE NO IMPACT ON THE ACCESSIBILITY OF EXISTING ROUTES) AS PER PLANS AS PER CODE LOW VOLTAGE CONTRACTOR: 02176473 SYSTCOM INC. 707 E ORDNANCE ROAD STE 401 BALTIMORE, MD 21226 04/30/2023 ) Original Permit Description:(COM2023-00128) INTERIOR RENOVATION OF EXISTING LABORATORY SPACES (TO SUIT USERS REQUIREMENTS) WITH ALTERATIONS TO EXISTING NON-STRUCTURAL PARTITIONS AND MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO SUPPORT NEW LAYOUT AND NEW FINISHES, EXISTING BUILDING PROVIDES ACCESSIBLE ROUTES VIA CORRIDORS, RAMPS, AND ELEVATORS TO GRADE, (ALTERATIONS MAKE NO IMPACT ON THE ACCESSIBILITY OF EXISTING ROUTES) AS PER PLANS AS PER CODE LOW VOLTAGE CONTRACTOR: 02176473 SYSTCOM INC. 707 E ORDNANCE ROAD STE 401 BALTIMORE, MD 21226 04/30/2023 May 22, 2023
COM2023INSTALL (18) # LOW VOLTAGE AS PER CODE.$6,000May 10, 2023
COM2023AMEND PERMIT: ADD HVAC AND PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2023-00128:INTERIOR RENOVATION OF EXISTING LABORATORY SPACES (TO SUIT USERS REQUIREMENTS) WITH ALTERATIONS TO EXISTING NON-STRUCTURAL PARTITIONS AND MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO SUPPORT NEW LAYOUT AND NEW FINISHES, EXISTING BUILDING PROVIDES ACCESSIBLE ROUTES VIA CORRIDORS, RAMPS, AND ELEVATORS TO GRADE, (ALTERATIONS MAKE NO IMPACT ON THE ACCESSIBILITY OF EXISTING ROUTES) AS PER PLANS AS PER CODE LOW VOLTAGE CONTRACTOR: 02176473 SYSTCOM INC. 707 E ORDNANCE ROAD STE 401 BALTIMORE, MD 21226 04/30/2023 ) Original Permit Description:(COM2023-00128) INTERIOR RENOVATION OF EXISTING LABORATORY SPACES (TO SUIT USERS REQUIREMENTS) WITH ALTERATIONS TO EXISTING NON-STRUCTURAL PARTITIONS AND MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO SUPPORT NEW LAYOUT AND NEW FINISHES, EXISTING BUILDING PROVIDES ACCESSIBLE ROUTES VIA CORRIDORS, RAMPS, AND ELEVATORS TO GRADE, (ALTERATIONS MAKE NO IMPACT ON THE ACCESSIBILITY OF EXISTING ROUTES) AS PER PLANS AS PER CODE LOW VOLTAGE CONTRACTOR: 02176473 SYSTCOM INC. 707 E ORDNANCE ROAD STE 401 BALTIMORE, MD 21226 04/30/2023 Apr 20, 2023
COM2023INTERIOR RENOVATION OF EXISTING LABORATORY SPACES (TO SUIT USERS REQUIREMENTS) WITH ALTERATIONS TO EXISTING NON-STRUCTURAL PARTITIONS AND MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS TO SUPPORT NEW LAYOUT AND NEW FINISHES, EXISTING BUILDING PROVIDES ACCESSIBLE ROUTES VIA CORRIDORS, RAMPS, AND ELEVATORS TO GRADE, (ALTERATIONS MAKE NO IMPACT ON THE ACCESSIBILITY OF EXISTING ROUTES) AS PER PLANS AS PER CODE LOW VOLTAGE CONTRACTOR: 02176473 SYSTCOM INC. 707 E ORDNANCE ROAD STE 401 BALTIMORE, MD 21226 04/30/2023 $400,000Apr 19, 2023
COM2023AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-02887:SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.) Original Permit Description:(COM2022-02887) SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.Jan 26, 2023
COM2023AMEND PERMIT: ADD PLUMBER CONTRACTOR .(ORIGINAL PERMIT:COM2022-02887:SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.) Original Permit Description:(COM2022-02887) SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.Jan 20, 2023
COM2023AMEND PERMIT: ADD HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-02887:SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.) Original Permit Description:(COM2022-02887) SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.Jan 19, 2023
COM2022SCOPE OF WORK:-----INTERIOR ALTERATIONS----[3300 SAN MARTIN DR] INTERIOR DEMOLITION AND ALTERATIONS TO OLIN HALL ON PART OF 2ND AND 3RD FLOORS TO CONSTRUCT ADA ALL-GENDER BATHROOMS PER PLANS AND PER CODE.$250,000Dec 9, 2022
COM2022INSTALL (1) ONE FIRE ALARM STROBE DEVICE IN NEW BATHROOM AS PER PLANS AS PER CODE.$4,000Aug 19, 2022
COM2022AMEND PERMIT: ADD PLUMBING CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2022-02148:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.) Original Permit Description:(COM2022-02148) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.Aug 1, 2022
COM2022AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2022-02148:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.) Original Permit Description:(COM2022-02148) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.Jul 26, 2022
COM2022AMEND PERMIT: ADD GAS CONTRACTOR .(ORIGINAL PERMIT:COM2022-02148:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.) Original Permit Description:(COM2022-02148) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.Jul 26, 2022
COM2022AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2022-02148:SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.) Original Permit Description:(COM2022-02148) SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.Jul 25, 2022
COM2022SCOPE OF WORK:----INTERIOR ALTERATIONS----INTERIOR DEMO AND ALTERATIONS TO REMOVE A PARTITION AND DRYWALL CEILING IN ROOM 105 (EMPLOYEE BREAK ROOM) ON THE 1ST FLOOR OF THE SAN MARTIN CENTER AND CONSTRUCT 2 PARTITIONS AND DOOR AND DRYWALL CEILING TO CREATE A TOILET ROOM PER ADA REQUIREMENTS, PLANS AND CODE.$77,000Jul 22, 2022
COM2020INSTALL (1) 156 BTU FUEL-BURNING EQUIP AS PER CODE.$172,000Dec 28, 2020
COM2020FIRE DETECTION DEVICES NEW CONFIGURATION IN AN EXISTING FA SYSTEM AS PER PLANS AS PER CODE.$2,000,000Apr 30, 2020
COM2020INSTALL (10) # SPRINKLERS, RELOCATION ( # HEADS) AS PER CODE.$8,250Feb 24, 2020
COM2020AMEND PERMIT: ADD HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2019-03950:SELECTIVE INTERIOR DEMOLITION AND RENOVATION OF A 2,250 SQUARE FEET, TWO-LEVEL LOBBY IN THE SPACE TELESCOPE SCIENCE INSTITUTE FACILITY ON THE JOHNS HOPKINS UNIVERSITY HOMEWOOD CAMPUS, REMOVES A STORAGE ROOM, EXISTING BUILT-IN CASEWORK, PORTIONS OF EXISTING CEILING, ALL ARCHITECTURAL FINISHES, FURNISHINGS, SOME MECHANICAL/ELECTRICAL DISTRIBUTION, AND MECHANICAL/ELECTRICAL DEVICES, FIXTURES, AND CONTROLS AS PER PLANS AS PER CODE THE PROJECT INCLUDES NEW WORK TO INSTALL A NEW BUILT-IN SECURITY STATION, NEW BUILT-IN RECEPTION DESK, NEW ALL-GLASS GUARDRAILS WITH ORNAMENTAL METAL HANDRAILS, NEW ALL-GLASS ENCLOSURE AT UPPER LEVEL, NEW ACOUSTIC WOOD CEILING, NEW FINISHES THROUGHOUT, AND NEW DISTRIBUTION, DEVICES, AND FIXTURES FOR MECHANICAL, ELECTRICAL, FIRE PROTECTION, LIGHTING AND CONTROL SYSTEMS PER PLANS PER CODE.SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. ) Original Permit Description:(COM2019-03950) SELECTIVE INTERIOR DEMOLITION AND RENOVATION OF A 2,250 SQUARE FEET, TWO-LEVEL LOBBY IN THE SPACE TELESCOPE SCIENCE INSTITUTE FACILITY ON THE JOHNS HOPKINS UNIVERSITY HOMEWOOD CAMPUS, REMOVES A STORAGE ROOM, EXISTING BUILT-IN CASEWORK, PORTIONS OF EXISTING CEILING, ALL ARCHITECTURAL FINISHES, FURNISHINGS, SOME MECHANICAL/ELECTRICAL DISTRIBUTION, AND MECHANICAL/ELECTRICAL DEVICES, FIXTURES, AND CONTROLS AS PER PLANS AS PER CODE THE PROJECT INCLUDES NEW WORK TO INSTALL A NEW BUILT-IN SECURITY STATION, NEW BUILT-IN RECEPTION DESK, NEW ALL-GLASS GUARDRAILS WITH ORNAMENTAL METAL HANDRAILS, NEW ALL-GLASS ENCLOSURE AT UPPER LEVEL, NEW ACOUSTIC WOOD CEILING, NEW FINISHES THROUGHOUT, AND NEW DISTRIBUTION, DEVICES, AND FIXTURES FOR MECHANICAL, ELECTRICAL, FIRE PROTECTION, LIGHTING AND CONTROL SYSTEMS PER PLANS PER CODE.SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. Jan 24, 2020
COM2019SELECTIVE INTERIOR DEMOLITION AND RENOVATION OF A 2,250 SQUARE FEET, TWO-LEVEL LOBBY IN THE SPACE TELESCOPE SCIENCE INSTITUTE FACILITY ON THE JOHNS HOPKINS UNIVERSITY HOMEWOOD CAMPUS, REMOVES A STORAGE ROOM, EXISTING BUILT-IN CASEWORK, PORTIONS OF EXISTING CEILING, ALL ARCHITECTURAL FINISHES, FURNISHINGS, SOME MECHANICAL/ELECTRICAL DISTRIBUTION, AND MECHANICAL/ELECTRICAL DEVICES, FIXTURES, AND CONTROLS AS PER PLANS AS PER CODE THE PROJECT INCLUDES NEW WORK TO INSTALL A NEW BUILT-IN SECURITY STATION, NEW BUILT-IN RECEPTION DESK, NEW ALL-GLASS GUARDRAILS WITH ORNAMENTAL METAL HANDRAILS, NEW ALL-GLASS ENCLOSURE AT UPPER LEVEL, NEW ACOUSTIC WOOD CEILING, NEW FINISHES THROUGHOUT, AND NEW DISTRIBUTION, DEVICES, AND FIXTURES FOR MECHANICAL, ELECTRICAL, FIRE PROTECTION, LIGHTING AND CONTROL SYSTEMS PER PLANS PER CODE.SEPARATE PERMITS ARE REQUIRED FOR SPRINKLER, FIRE ALARM, AND DETECTION SYSTEMS. $1,145,000Jan 16, 2020
COM2019scope of work: inteiror alterations to include: selective demolition only (category i): building permit for new work is submitted under permit application com2019-03950. selective demolition includes removal of existing casework, finish flooring, some non-structural and non-load bearing cmu wall, some drywall soffits, removal of some lighting fixtures and local air terminal units. all work will be done according to baltimore city code. demo only, separate permit will be pulled for interior renovations/tenant fitout $17,500Dec 11, 2019
COM2019 relocating thirteen (13) pendents to uprights and plug seven (7) outlets to provide the proper coverage in the newly renovated electrical and storage room on the ground floor as per plans as per code.$6,500Nov 22, 2019
COM2019providing a one for one replacement of an obsolete notifier afp-200 with a new fire alarm control panel notifier nfs-320. (the existing slc devices and notification appliances will remain as perviously installed, tested, & approved) as per plans as per code.$4,590Nov 8, 2019
COM2019amend permit: add hvac contractor . original permit.(original permit:com2019-02193:interior/exterior alterations to include interior demo, alterations to replace an existing switch gear and chiller #1 in existing building. exterior work to construct concrete pad and install new generator with 2,200 gallon diesel fuel with retaining wall around it, duct bank and replace part of walkway per plans and per code. separate permit will be required for sprinkler and fire alarm systems.)Oct 29, 2019
COM2019amend permit: add electrical contractor . (original permit:com2019-02193:interior/exterior alterations to include interior demo, alterations to replace an existing switch gear and chiller #1 in existing building. exterior work to construct concrete pad and install new generator with 2,200 gallon diesel fuel with retaining wall around it, duct bank and replace part of walkway per plans and per code. separate permit will be required for sprinkler and fire alarm systems.) original permit description:(com2019-02193) interior/exterior alterations to include interior demo, alterations to replace an existing switch gear and chiller #1 in existing building. exterior work to construct concrete pad and install new generator with 2,200 gallon diesel fuel with retaining wall around it, duct bank and replace part of walkway per plans and per code. separate permit will be required for sprinkler and fire alarm systems.Oct 22, 2019
COM2019interior/exterior alterations to include interior demo, alterations to replace an existing switch gear and chiller #1 in existing building. exterior work to construct concrete pad and install new generator with 2,200 gallon diesel fuel with retaining wall around it, duct bank and replace part of walkway per plans and per code. separate permit will be required for sprinkler and fire alarm systems.$2,500,000Oct 21, 2019
COM2019scope of work: interior alterations to include: interior demolition (category i): demolition of interior of non-structural walls and ceilings and removal of all associated debris. all work will be done according to baltimore city code. demo only, separate permit will be pulled for interior renovations.$24,000Oct 1, 2019
COM2019amend to add electrical contractor:(original permit:com2019-02263:interior demo and alteration to room 142b of olin hall per plans and per code) original permit description:(com2019-02263) interior demo and alteration to room 142b of olin hall per plans and per codeAug 23, 2019
COM2019interior demo and alteration to room 142b of olin hall per plans and per code$70,000Aug 19, 2019
COM2019amend permit: add (prime) contractor . (original permit:com2019-57954:amend permit: add hvac and plumbing contractor .(original permit:com2018-03653:interior demo and alterations to part of the steve muller building per plans and per code. separate permits are required for sprinkler and fire alarm systems’ alterations.) original permit description:(com2018-03653) interior demo and alterations to part of the steve muller building per plans and per code. separate permits are required for sprinkler and fire alarm systems’ alterations.) original permit description:(com2019-57954) amend permit: add hvac and plumbing contractor .(original permit:com2018-03653:interior demo and alterations to part of the steve muller building per plans and per code. separate permits are required for sprinkler and fire alarm systems’ alterations.) original permit description:(com2018-03653) interior demo and alterations to part of the steve muller building per plans and per code. separate permits are required for sprinkler and fire alarm systems’ alterations.Apr 1, 2019

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.