Baltimore City · 21201
29 W NORTH AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $237,633
- Land use
- Commercial (C)
- Year built
- 1900
- Last sale
- Jul 16, 2003
Assessment
| Owner | H & K FAMILY TRUST, LLC |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $237,633 (cycle 2026) |
| Last sale | Jul 16, 2003 |
| Year built | 1900 |
| Zoning | C-2 |
| Vacant | Yes |
Permits
27| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Replace and install 8 AC and heating systems 1.5 tons, 600 cfm each. Duct work where required included (repair and replace). Install 8 exhaust fans 80 cfm each, as per code. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation | $16,000 | Feb 22, 2026 |
| COM2024 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Dec 31, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Oct 9, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Jun 30, 2024 |
| COM2022 | FIRE ALARM INSTALLATION AS PER PLANS AS PER CODE. | $500,000 | Apr 19, 2024 |
| COM2024 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Apr 17, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-82384: Extend Original Permit.(original permit:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2023-82384) Extend Original Permit.(original permit:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Apr 15, 2024 |
| COM2023 | Extend Original Permit.(original permit:COM2023-69030: Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2023-69030) Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Jan 2, 2024 |
| COM2023 | Extend Original Permit.(original permit:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Oct 17, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Jun 23, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2022-86529:AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2022-86529) AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | May 31, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Mar 20, 2023 |
| COM2022 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Dec 15, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-79885: Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2021-79885) Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Dec 15, 2022 |
| COM2022 | AMEND PERMIT: ADD PLUMBER CONTRACTOR . (ORIGINAL PERMIT:COM2019-01907:INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. ) Original Permit Description:(COM2019-01907) INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | — | Nov 2, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Jun 30, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-79885: Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2021-79885) Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Jun 16, 2022 |
| COM2019 | INSTALLING ALL NEW DWELLING ON SECOND AND THIRD FLOORS, ALL FRONT WINDOWS AND DOORS WILL BE REPLACED, EXISTING STAIRCASE WHICH ATTACHES TO THE CENTER WALL, BOTH OF WHICH WILL BE REMOVED AND TWO NEW STAIRCASES WILL BE INSTALLED IN ITS STEAD AS PER PLANS AS PER CODE. PERMITS FOR SPRINKLER SYSTEM AND FIRE ALARM MUST BE OBTAINED SEPARATELY. | $500,000 | Apr 4, 2022 |
| COM2021 | Extend Original Permit.(original permit:COM2019-03413:INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE.) Original Permit Description:(COM2019-03413) INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | — | Nov 18, 2021 |
| COM2021 | Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Oct 5, 2021 |
| COM2021 | EXTEND: (ORIGINAL PERMIT:COM2020-79779: EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) ORIGINAL PERMIT DESCRIPTION:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2020-79779) Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Apr 7, 2021 |
| COM2020 | Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Oct 7, 2020 |
| COM2020 | Extend Original Permit.(original permit:COM2018-77483:INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR) Original Permit Description:(COM2018-77483) INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR SCOPE OF WORK: INTERIOR WORK: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF THE CARPETING, DOORS, WINDOWS, DRYWALL, PLASTER, PARTITION, NON-BEARING WALLS, DROP CEILINGS, FLOORINGS, SHELVES, MIRRORS, EQUIPMENT, AND REMOVAL OF ALL ASSOCIATED DEBRIS. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. DEMO ONLY. SEPARATE PERMIT WILL BE PULLED/REQUIRED FOR INTERIOR RENOVATIONS. APWC PER PLANNING: INTERIOR WORK NOT REGULATED BY URP. WINDOW REPLACEMENT MUST FOLLOW URP GUIDELINES FOR SIZE, MATERIAL AND COLOR | — | Mar 31, 2020 |
| BMZ2020 | use existing structure as a mixed-use facility with retail use on ground floor and 8 dwelling units on 2nd and 3rd floors. | — | Jan 9, 2020 |
| COM2019 | INSTALL FIRE SPRINKLER SYSTEM (108 HEADS) AS PER CODE. | $500,000 | Jan 6, 2020 |
| COM2019 | extend original permit.(original permit:com2018-77483:interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color scope of work: interior work: interior demolition (category i): removal of the carpeting, doors, windows, drywall, plaster, partition, non-bearing walls, drop ceilings, floorings, shelves, mirrors, equipment, and removal of all associated debris. all work will be done according to baltimore city code. demo only. separate permit will be pulled/required for interior renovations. apwc per planning: interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color) original permit description:(com2018-77483) interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color scope of work: interior work: interior demolition (category i): removal of the carpeting, doors, windows, drywall, plaster, partition, non-bearing walls, drop ceilings, floorings, shelves, mirrors, equipment, and removal of all associated debris. all work will be done according to baltimore city code. demo only. separate permit will be pulled/required for interior renovations. apwc per planning: interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color | — | Sep 18, 2019 |
| COM2019 | extend original permit.(original permit:com2018-77483:interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color scope of work: interior work: interior demolition (category i): removal of the carpeting, doors, windows, drywall, plaster, partition, non-bearing walls, drop ceilings, floorings, shelves, mirrors, equipment, and removal of all associated debris. all work will be done according to baltimore city code. demo only. separate permit will be pulled/required for interior renovations. apwc per planning: interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color) original permit description:(com2018-77483) interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color scope of work: interior work: interior demolition (category i): removal of the carpeting, doors, windows, drywall, plaster, partition, non-bearing walls, drop ceilings, floorings, shelves, mirrors, equipment, and removal of all associated debris. all work will be done according to baltimore city code. demo only. separate permit will be pulled/required for interior renovations. apwc per planning: interior work not regulated by urp. window replacement must follow urp guidelines for size, material and color | — | Apr 8, 2019 |
Violations
1| Kind | Category | Status | Date |
|---|---|---|---|
| vacant_building_notice | Vacant | open | Sep 5, 2017 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: PM 305.1Jul 6, 2026 · 10 m · 33 W NORTH AVE
- violation: HCD-Maintenance StructureJul 4, 2026 · 99 m · 110 W NORTH AVE
- violation: SW-Dirty AlleyJul 1, 2026 · 134 m
- violation: BC 123.8.1Jun 30, 2026 · 78 m · 1816 N CHARLES ST
- violation: SW-Dirty AlleyJun 26, 2026 · 134 m · 1729 MARYLAND AVE
- violation: HCD-Maintenance StructureJun 23, 2026 · 144 m · 11 W 20TH ST
- violation: SW-Dirty AlleyJun 18, 2026 · 144 m
- violation: SW-HGWJun 11, 2026 · 95 m · 4 W NORTH AVE
- violation: HCD-Maintenance StructureJun 11, 2026 · 144 m · 11 W 20TH ST
- permit: BCCMJun 10, 2026 · 95 m · 10 W NORTH AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.