Baltimore City · 21218
436 E 22ND ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $240,000
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Mar 4, 2021
Assessment
| Owner | HEKIMIAN, LILY |
|---|---|
| Land use | Residential (R) |
| Total assessment | $240,000 (cycle 2026) |
| Last sale | Mar 4, 2021 — $248,000 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | — |
Permits
6| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2020 | USE PREMISES FOR A SINGLE FAMILY DWELLING (ROWHOUSE). | — | Jun 26, 2020 |
| COM2020 | Extend Original Permit.(original permit:COM2019-86028:BARCLAY GREENMOUNT 22ND ST. LOCAL HIST DIST- AT FRONT: REPAIR WOOD WINDOWS AT 1ST, 2ND, AND 3RD FLOORS TO EXTENT POSSIBLE; REPLACE WINDOWS DETERIORATED BEYOND REPAIR WITH WOOD 1/1 WINDOWS TO MATCH INCLUDING CROSETTES; REPAIR/REPLACE WINDOW TRANSOM BARS AT FIRST FLOOR AS NEEDED; INSTALL NEW WOOD AWNING WINDOW TO FIT EXISTING OPENING AT BASEMENT; REPOINT MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COLOR, TEXTURE, COMPOSITION TOOLING AND WIDTH OF MORTAR JOINTS; PRIME AND PAINT PAINTED STONE AT BASEMENT/1ST FLOOR; CLEAN/GENTLY REMOVE PAINT FROM EXISTING STEPS AND REPOINT WITH CEMENT AND MARBLE DUST AS NEEDED; INSTALL, PRIME AND PAINT NEW METAL STAIR RAILING; INSTALL NEW 4-PANEL WOOD DOOR TO FIT ORIGINAL OPENING; INSTALL NEW TRANSOM BAR AND ARCHED HEAD FIXED SASH WOOD TRANSOM IN EXISTING OPENING; INSTALL NEW LIGHT FIXTURE, HOUSE NUMBERS AND MAILBOX; PAINT CORNICE AND INTERMEDIATE TRIM; INSTALL NEW METAL FLASHING; INSTALL BUILDING PAPER BETWEEN CORNICE AND FLASHING. AT REAR: REPAIR WINDOWS TO EXTENT POSSIBLE; REPLACE WINDOWS DETERIORATED BEYOND REPAIR WITH 1/1 WINDOWS INCLUDING CROSETTES; INSTALL NEW TYMPANUMS WHERE NEEDED; REPLACE/PAINT DETERIORATED SILLS AS NEEDED TO MATCH; FILL ABANDONED BASEMENT OPENING; INSTALL 2 NEW FOUR-PANEL WOOD DOORS AND TRANSOMS IN EXISTING OPENINGS AT 1ST AND 2ND FLOORS; SECURE 2ND FLOOR DOOR IN CLOSED POSITION; INSTALL NEW HALF ROUND GUTTER AND ROUND DOWNSPOUT AT MAIN AND BAY ROOF; INSTALL NEW FIBER CEMENT FASCIA AND RAKE AT MAIN AND 2-STORY ROOF; REPAIR CHIMNEY AS NEEDED; REPOINT MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COLOR, TEXTURE, COMPOSITION TOOLING AND WIDTH OF MORTAR JOINTS; PATCH/REPAINT STUCCO AS NEEDED. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES.) Original Permit Description:(COM2019-86028) BARCLAY GREENMOUNT 22ND ST. LOCAL HIST DIST- AT FRONT: REPAIR WOOD WINDOWS AT 1ST, 2ND, AND 3RD FLOORS TO EXTENT POSSIBLE; REPLACE WINDOWS DETERIORATED BEYOND REPAIR WITH WOOD 1/1 WINDOWS TO MATCH INCLUDING CROSETTES; REPAIR/REPLACE WINDOW TRANSOM BARS AT FIRST FLOOR AS NEEDED; INSTALL NEW WOOD AWNING WINDOW TO FIT EXISTING OPENING AT BASEMENT; REPOINT MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COLOR, TEXTURE, COMPOSITION TOOLING AND WIDTH OF MORTAR JOINTS; PRIME AND PAINT PAINTED STONE AT BASEMENT/1ST FLOOR; CLEAN/GENTLY REMOVE PAINT FROM EXISTING STEPS AND REPOINT WITH CEMENT AND MARBLE DUST AS NEEDED; INSTALL, PRIME AND PAINT NEW METAL STAIR RAILING; INSTALL NEW 4-PANEL WOOD DOOR TO FIT ORIGINAL OPENING; INSTALL NEW TRANSOM BAR AND ARCHED HEAD FIXED SASH WOOD TRANSOM IN EXISTING OPENING; INSTALL NEW LIGHT FIXTURE, HOUSE NUMBERS AND MAILBOX; PAINT CORNICE AND INTERMEDIATE TRIM; INSTALL NEW METAL FLASHING; INSTALL BUILDING PAPER BETWEEN CORNICE AND FLASHING. AT REAR: REPAIR WINDOWS TO EXTENT POSSIBLE; REPLACE WINDOWS DETERIORATED BEYOND REPAIR WITH 1/1 WINDOWS INCLUDING CROSETTES; INSTALL NEW TYMPANUMS WHERE NEEDED; REPLACE/PAINT DETERIORATED SILLS AS NEEDED TO MATCH; FILL ABANDONED BASEMENT OPENING; INSTALL 2 NEW FOUR-PANEL WOOD DOORS AND TRANSOMS IN EXISTING OPENINGS AT 1ST AND 2ND FLOORS; SECURE 2ND FLOOR DOOR IN CLOSED POSITION; INSTALL NEW HALF ROUND GUTTER AND ROUND DOWNSPOUT AT MAIN AND BAY ROOF; INSTALL NEW FIBER CEMENT FASCIA AND RAKE AT MAIN AND 2-STORY ROOF; REPAIR CHIMNEY AS NEEDED; REPOINT MASONRY AS NEEDED; MORTAR TO MATCH EXISTING IN COLOR, TEXTURE, COMPOSITION TOOLING AND WIDTH OF MORTAR JOINTS; PATCH/REPAINT STUCCO AS NEEDED. ALL WORK TO BE COMPLETED AS PER INFORMATION/PLANS/SPECS IN CHAP FILES. | — | Jun 3, 2020 |
| COM2020 | INSTALL (1) 150 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (15) # BRANCH CIRCUITS/FEEDERS , (25) # LOW VOLTAGE AS PER CODE. | $1,000 | Feb 25, 2020 |
| COM2020 | INSTALL (10) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 40000 BTU FUEL-BURNING EQUIP, (2) 150000 BTU FUEL-BURNING EQUIP AS PER CODE. | $2,000 | Jan 22, 2020 |
| COM2020 | INSTALL (1) 36000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (1) 72000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $6,000 | Jan 15, 2020 |
| COM2019 | barclay greenmount 22nd st. local hist dist- at front: repair wood windows at 1st, 2nd, and 3rd floors to extent possible; replace windows deteriorated beyond repair with wood 1/1 windows to match including crosettes; repair/replace window transom bars at first floor as needed; install new wood awning window to fit existing opening at basement; repoint masonry as needed; mortar to match existing in color, texture, composition tooling and width of mortar joints; prime and paint painted stone at basement/1st floor; clean/gently remove paint from existing steps and repoint with cement and marble dust as needed; install, prime and paint new metal stair railing; install new 4-panel wood door to fit original opening; install new transom bar and arched head fixed sash wood transom in existing opening; install new light fixture, house numbers and mailbox; paint cornice and intermediate trim; install new metal flashing; install building paper between cornice and flashing. at rear: repair windows to extent possible; replace windows deteriorated beyond repair with 1/1 windows including crosettes; install new tympanums where needed; replace/paint deteriorated sills as needed to match; fill abandoned basement opening; install 2 new four-panel wood doors and transoms in existing openings at 1st and 2nd floors; secure 2nd floor door in closed position; install new half round gutter and round downspout at main and bay roof; install new fiber cement fascia and rake at main and 2-story roof; repair chimney as needed; repoint masonry as needed; mortar to match existing in color, texture, composition tooling and width of mortar joints; patch/repaint stucco as needed. all work to be completed as per information/plans/specs in chap files. | $60,000 | Dec 3, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-HGWJul 9, 2026 · 148 m · 537 E 23RD ST
- violation: HCD-Sanitation PropertyJul 8, 2026 · 148 m · 537 E 23RD ST
- violation: PM 305.1Jul 6, 2026 · 55 m · 412 E 22ND ST
- violation: PM 305.2.2Jul 6, 2026 · 74 m · 2203 BARCLAY ST
- violation: HCD-Sanitation PropertyJul 5, 2026 · 59 m · 412 E 22ND ST
- violation: HCD-Sanitation PropertyJul 5, 2026 · 80 m · 2203 BARCLAY ST
- violation: SW-Dirty AlleyJul 5, 2026 · 81 m · 2207 BARCLAY ST
- violation: SW-Dirty AlleyJul 5, 2026 · 149 m · 331 E 23RD ST
- violation: HCD-Vacant BuildingJul 3, 2026 · 125 m · 2303 BARCLAY ST
- violation: SW-Dirty AlleyJul 3, 2026 · 127 m · 530 E 22ND ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.