Baltimore City · 21218
311 E 25TH ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $240,000
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Oct 8, 2021
Assessment
| Owner | MARTINEZ, STEVEN |
|---|---|
| Land use | Residential (R) |
| Total assessment | $240,000 (cycle 2026) |
| Last sale | Oct 8, 2021 — $220,000 |
| Year built | 1920 |
| Zoning | OR-1* |
| Vacant | — |
Permits
5| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2022 | USE AS A SINGLE-FAMILY DWELLING. | — | Apr 28, 2022 |
| COM2022 | Extend Original Permit.(original permit:COM2021-81033:SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REPLACEMENT OF 6 WINDOWS & 2 EXTERIOR DOORS (BOTH SAME SIZE SAME LOCATION)/INTERIOR ALTERATIONS TO INCLUDE: 600 SQ FT DRYWALL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE ) Original Permit Description:(COM2021-81033) SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REPLACEMENT OF 6 WINDOWS & 2 EXTERIOR DOORS (BOTH SAME SIZE SAME LOCATION)/INTERIOR ALTERATIONS TO INCLUDE: 600 SQ FT DRYWALL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | — | Apr 27, 2022 |
| COM2021 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (20) # BRANCH CIRCUITS/FEEDERS , (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 60000 BTU FUEL-BURNING EQUIP(FURNACE), (11) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (2) 60000 BTU FUEL-BURNING EQUIP, (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | $6,500 | Jan 12, 2022 |
| COM2021 | INSTALL (1) 200 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (20) # BRANCH CIRCUITS/FEEDERS , (2) 18000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE), (13) # PLUMBING FIXTURES, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # GAS TEST, (1) 50000 BTU FUEL-BURNING EQUIP, (2) 72000 BTU FUEL-BURNING EQUIP AS PER CODE. | $6,500 | Oct 14, 2021 |
| COM2021 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REPLACEMENT OF 6 WINDOWS & 2 EXTERIOR DOORS (BOTH SAME SIZE SAME LOCATION)/INTERIOR ALTERATIONS TO INCLUDE: 600 SQ FT DRYWALL, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE | $5,000 | Oct 14, 2021 |
Violations
4| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 305.9 | O | $50 | $150 | Jan 9, 2025 |
| citation | PM 305.2.2 | O | $50 | $150 | Jul 19, 2023 |
| citation | PM 305.2.2 | O | $50 | $150 | Sep 2, 2022 |
| citation | PM 305.2.2 | O | $50 | $150 | Aug 3, 2022 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 9, 2026 · 140 m · 2404 BARCLAY ST
- violation: SW-Dirty AlleyJul 8, 2026 · 127 m · 300 E 24TH ST
- violation: SW-Dirty AlleyJul 3, 2026 · 127 m · 300 E 24TH ST
- violation: PM 305.2.2Jun 29, 2026 · 76 m · 2421 GUILFORD AVE
- violation: PM 305.2.2Jun 29, 2026 · 81 m · 2419 GUILFORD AVE
- violation: BC 123.8.2Jun 29, 2026 · 105 m · 2418 BARCLAY ST
- violation: HCD-Sanitation PropertyJun 26, 2026 · 77 m · 2421 GUILFORD AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 82 m · 2419 GUILFORD AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 117 m · 2418 BARCLAY ST
- violation: SW-Dirty AlleyJun 25, 2026 · 137 m · 2400 GUILFORD AVE
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.