Assessment
| Owner | CHARLES VILLAGE INVESTORS, LLC |
|---|---|
| Land use | Apartments (M) |
| Total assessment | $7,334,400 (cycle 2026) |
| Last sale | Aug 9, 2019 — $1,375,000 |
| Year built | 1910 |
| Zoning | OR-2 |
| Vacant | — |
Permits
12| Type | Description | Cost | Issued |
|---|---|---|---|
| USE2023 | USE ENTIRE BUILDING AS 18 DWELLING UNITS INCLUDING THE BASEMENT TO BE USED AS STORAGE PER BMZA2019-399. | — | Jul 19, 2023 |
| USE2022 | USE PORTION OF BUILDING([2527-2537 ST. PAUL ST) AS 18 DWELLING UNITS ON FLOORS 1, 2 AND 3. BASEMENT AMENITY SPACE NOT INCLUDED. | — | Mar 10, 2023 |
| COM2023 | Extend Original Permit.(original permit:COM2020-00175:FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM.) Original Permit Description:(COM2020-00175) FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | — | Feb 21, 2023 |
| COM2023 | AMEND PERMIT: CHANGE ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2020-00175:FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM.) Original Permit Description:(COM2020-00175) FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | — | Jan 23, 2023 |
| COM2022 | AMEND ISSUED PERMIT COM2020-00175/ PLANS#2020-67; INCREASE SERVICE TO 1000AMP SERVICE AND TO 125AMP HOUSE PANEL | $1,000 | Oct 13, 2022 |
| COM2021 | NEW FIRE ALARM SYSTEM FOR (6) 3 LEVEL APT BUILDINGS. BUILDING PERMIT ASSOCIATED WITH WORK (COM2020-00175) FOR DETAILED DESCRIPTION AS PER PLANS AS PER CODE. | $50,000 | Jan 28, 2022 |
| COM2022 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2020-01931:PROVIDING A NEW SPRINKLER SYSTEM (186 HEADS) IN A RENOVATED ROW HOMES AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-01931) PROVIDING A NEW SPRINKLER SYSTEM (186 HEADS) IN A RENOVATED ROW HOMES AS PER PLANS AS PER CODE. | — | Jan 24, 2022 |
| COM2021 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2020-00175:FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM.) Original Permit Description:(COM2020-00175) FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | — | Nov 24, 2021 |
| COM2021 | AMEND PERMIT: ADD PLUMBER AND GAS CONTRACTOR . (ORIGINAL PERMIT:COM2020-00175:FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM.) Original Permit Description:(COM2020-00175) FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | — | Jul 21, 2021 |
| COM2021 | AMEND PERMIT: ADD HVAC CONTRACTOR . (ORIGINAL PERMIT:COM2020-00175:FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM.) Original Permit Description:(COM2020-00175) FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | — | Jun 28, 2021 |
| COM2020 | FULL INTERIOR RENOVATION TO CREATE 18 DWELLING UNITS, WINDOW REPLACEMENT AND SELECTIVE EXTERIOR REHABILITATION (NO INCREASED FOOTPRINT OR HEIGHT) OF FIVE (5) CONSOLIDATED ROWHOME UNITS. CREATE TEN (10)ONSITE REAR PARKING SPACES, OFF EXISTING ALLEY. INSTALLATION OF THREE (3) NEW STAIRWAYS TO CREATE ACCESS TO BETWEEN TWO (2) BUILDING SECTIONS EACH, FOR SIX (6) UNITS PER SECTION, FOR TOTAL OF EIGHTEEN (18) DWELLING UNITS PER BMZA2019-399. FIRST (1ST) FLOOR UNITS TO BE ACCESSIBLE, WITH THREE (3) NEW VERTICAL PLATFORM LIFTS ON PARKING LOT SIDE. EXTERIOR WORK INCLUDES NEW WINDOWS AND DOORS IN THE EXISTING MASONRY OPENINGS, THE REPLACEMENT OF MISSING CORNICE ON SECTION OF FAÇADE AND REPLACEMENT OF REMOVED CONCRETE ENTRY STAIR ON BUILDING PORTION, NEW SIDING AND STRUCTURAL SUPPORT ON NON-HISTORICAL 2ND FLOOR ADDITIONS AND NEW METAL STAIRS / LANDING / VERTICAL PLATFORM LIFTS / TRASH ENCLOSURES / BIKE STORAGE LOCKERS IN THE REAR. NEW PLUMBING, MECHANICAL, ELECTRICAL AS PER PLANS AS PER CODE. SEPARATE PERMITS MUST BE OBTAINED FOR FIRE ALARMS AND SPRINKLER SYSTEM. | $1,300,000 | Feb 19, 2021 |
| COM2020 | PROVIDING A NEW SPRINKLER SYSTEM (186 HEADS) IN A RENOVATED ROW HOMES AS PER PLANS AS PER CODE. | $45,700 | Dec 4, 2020 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 7, 2026 · 98 m · 2500 SAINT PAUL ST
- violation: SW-Dirty AlleyJul 6, 2026 · 141 m · 2607 N CALVERT ST
- violation: SW-Dirty AlleyJun 29, 2026 · 23 m
- violation: SW-Dirty AlleyJun 26, 2026 · 90 m · 2501 N CALVERT ST
- permit: BRCMJun 16, 2026 · 145 m · 2605 N CALVERT ST
- violation: SW-Dirty AlleyJun 8, 2026 · 61 m · 2506 N CALVERT ST
- violation: SW-Dirty AlleyJun 8, 2026 · 122 m · 2607 N CALVERT ST
- permit: BCCMJun 4, 2026 · 57 m · 104 E 25TH ST
- violation: SW-Dirty AlleyMay 29, 2026 · 138 m · 12 E 25TH ST
- permit: BCCMMay 27, 2026 · 58 m · 2507 SAINT PAUL ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.