Baltimore City · 21218

431 E 27TH ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$228,267
Land use
Residential (R)
Year built
1900
Last sale
Oct 29, 2024

Assessment

OwnerGARRAMONE, GREGORY GAETANO
Land useResidential (R)
Total assessment$228,267 (cycle 2026)
Last saleOct 29, 2024
Year built1900
ZoningR-8
Vacant

Permits

7
TypeDescriptionCostIssued
USE2024USE AS A SINGLE-FAMILY DWELLING.Jun 5, 2024
COM2024REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-72002:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: INTERIOR ALTERATION TO OPEN THE FLOOR PLAN AND REFRAME THE SECOND FLOOR TO GET TWO LARGER BEDROOMS AND TWO BATHROOMS PER ATTACHED PLANS. INSTALL NEW DOORS, NEW FLOORING, MOLDING, REMODEL BATHROOMS AND KITCHEN. INSTALLATION OF INTERIOR STAIRCASE (TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), ALL MEP'S WILL BE PULLING THEIR OWN PERMITS. REPLACE SOME AREAS OF DRYWALL THAT IS DAMAGED. PLANS ARE ATTACHED FOR REVIEW. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2023-72002) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: INTERIOR ALTERATION TO OPEN THE FLOOR PLAN AND REFRAME THE SECOND FLOOR TO GET TWO LARGER BEDROOMS AND TWO BATHROOMS PER ATTACHED PLANS. INSTALL NEW DOORS, NEW FLOORING, MOLDING, REMODEL BATHROOMS AND KITCHEN. INSTALLATION OF INTERIOR STAIRCASE (TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), ALL MEP'S WILL BE PULLING THEIR OWN PERMITS. REPLACE SOME AREAS OF DRYWALL THAT IS DAMAGED. PLANS ARE ATTACHED FOR REVIEW. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)May 16, 2024
COM2024REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-72002:SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: INTERIOR ALTERATION TO OPEN THE FLOOR PLAN AND REFRAME THE SECOND FLOOR TO GET TWO LARGER BEDROOMS AND TWO BATHROOMS PER ATTACHED PLANS. INSTALL NEW DOORS, NEW FLOORING, MOLDING, REMODEL BATHROOMS AND KITCHEN. INSTALLATION OF INTERIOR STAIRCASE (TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), ALL MEP'S WILL BE PULLING THEIR OWN PERMITS. REPLACE SOME AREAS OF DRYWALL THAT IS DAMAGED. PLANS ARE ATTACHED FOR REVIEW. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)) Original Permit Description:(COM2023-72002) SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: INTERIOR ALTERATION TO OPEN THE FLOOR PLAN AND REFRAME THE SECOND FLOOR TO GET TWO LARGER BEDROOMS AND TWO BATHROOMS PER ATTACHED PLANS. INSTALL NEW DOORS, NEW FLOORING, MOLDING, REMODEL BATHROOMS AND KITCHEN. INSTALLATION OF INTERIOR STAIRCASE (TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), ALL MEP'S WILL BE PULLING THEIR OWN PERMITS. REPLACE SOME AREAS OF DRYWALL THAT IS DAMAGED. PLANS ARE ATTACHED FOR REVIEW. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)Mar 18, 2024
COM2023INSTALL (20) # BRANCH CIRCUITS/FEEDERS , (10) # LOW VOLTAGE AS PER CODE.$7,000Sep 22, 2023
COM2023INSTALL (1) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) 800 CFM NEW DISTRIBUTION SYSTEM (OTHER THAN 1-2 FAMILY ) AS PER CODE.$10,000Aug 31, 2023
COM2023INSTALL (12) # SANITARY CONNECTION (RECONSTRUCTION0 AS PER CODE.$6,500Aug 16, 2023
COM2023SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: INTERIOR ALTERATION TO OPEN THE FLOOR PLAN AND REFRAME THE SECOND FLOOR TO GET TWO LARGER BEDROOMS AND TWO BATHROOMS PER ATTACHED PLANS. INSTALL NEW DOORS, NEW FLOORING, MOLDING, REMODEL BATHROOMS AND KITCHEN. INSTALLATION OF INTERIOR STAIRCASE (TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN), ALL MEP'S WILL BE PULLING THEIR OWN PERMITS. REPLACE SOME AREAS OF DRYWALL THAT IS DAMAGED. PLANS ARE ATTACHED FOR REVIEW. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQFT FOR ONE OCCUPANT OR 50SQFT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)$40,000Jul 10, 2023

Violations

0

No violations on record.

Inspections

1
TypeStatus
InitialOPEN

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.