Baltimore City · 21218
313 E 29TH ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $161,833
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- Oct 22, 2020
Assessment
| Owner | KATZ, ARIANA ELIZABETH |
|---|---|
| Land use | Residential (R) |
| Total assessment | $161,833 (cycle 2026) |
| Last sale | Oct 22, 2020 — $54,379 |
| Year built | 1920 |
| Zoning | R-7 |
| Vacant | — |
Permits
4| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2021 | Extend Original Permit.(original permit:COM2020-84654:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REPLACE EXISTING KITCHEN CABINETS WITH NEW CABINETS; INSTALL NEW ENERGY EFFICIENT WINDOW IN PLACE OF EXISTING WINDOW (IN THE SAME SIZE AND LOCATION); INSTALL NEW FLOORING IN PLACE OF EXISTING FLOORING; CREATE NEW POWDER ROOM IN EXISTING SPACE NEXT TO KITCHEN, NO CHANGE TO EXISTING ROOM SPACE OR LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH. MEP WILL BE ON SEPARATE PERMIT PULLED BY OTHERS.) Original Permit Description:(COM2020-84654) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REPLACE EXISTING KITCHEN CABINETS WITH NEW CABINETS; INSTALL NEW ENERGY EFFICIENT WINDOW IN PLACE OF EXISTING WINDOW (IN THE SAME SIZE AND LOCATION); INSTALL NEW FLOORING IN PLACE OF EXISTING FLOORING; CREATE NEW POWDER ROOM IN EXISTING SPACE NEXT TO KITCHEN, NO CHANGE TO EXISTING ROOM SPACE OR LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH. MEP WILL BE ON SEPARATE PERMIT PULLED BY OTHERS. | — | Jun 14, 2021 |
| COM2021 | INSTALL (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (3) # PLUMBING FIXTURES AS PER CODE. | $2,500 | Jan 20, 2021 |
| COM2020 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REPLACE EXISTING KITCHEN CABINETS WITH NEW CABINETS; INSTALL NEW ENERGY EFFICIENT WINDOW IN PLACE OF EXISTING WINDOW (IN THE SAME SIZE AND LOCATION); INSTALL NEW FLOORING IN PLACE OF EXISTING FLOORING; CREATE NEW POWDER ROOM IN EXISTING SPACE NEXT TO KITCHEN, NO CHANGE TO EXISTING ROOM SPACE OR LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED SKETCH. MEP WILL BE ON SEPARATE PERMIT PULLED BY OTHERS. | $15,000 | Dec 3, 2020 |
| COM2020 | INSTALL (15) # BRANCH CIRCUITS/FEEDERS , (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS) AS PER CODE. | $300 | Nov 12, 2020 |
Violations
2| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 305.1 | P | $50 | $0 | Aug 21, 2025 |
| citation | PM 305.2.2 | P | $50 | $0 | Aug 21, 2025 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJun 29, 2026 · 32 m · 301 E 29TH ST
- violation: SW-Dirty AlleyJun 29, 2026 · 48 m
- violation: SW-Dirty AlleyJun 27, 2026 · 54 m · 302 ILCHESTER AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 131 m · 410 ILCHESTER AVE
- violation: SW-Dirty AlleyJun 21, 2026 · 141 m · 301 E 28TH ST
- violation: HCD-Sanitation PropertyJun 20, 2026 · 103 m · 310 E 28TH ST
- violation: SW-Dirty AlleyJun 18, 2026 · 76 m · 2905 GUILFORD AVE
- violation: PM 305.2.2Jun 11, 2026 · 97 m · 310 E 28TH ST
- violation: SW-Dirty AlleyJun 9, 2026 · 70 m · 2901 GUILFORD AVE
- violation: SW-Dirty AlleyJun 9, 2026 · 138 m · 307 E 28TH ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-11; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.