Baltimore City · 21218
3333 N CALVERT ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $23,827,600
- Land use
- Commercial (C)
- Year built
- —
- Last sale
- Jun 24, 2014
Assessment
| Owner | HTA-CALVERT, LLC |
|---|---|
| Land use | Commercial (C) |
| Total assessment | $23,827,600 (cycle 2026) |
| Last sale | Jun 24, 2014 |
| Year built | — |
| Zoning | H |
| Vacant | — |
Permits
22| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | SCOPE OF WORK: ---- LEVEL II INTERIOR ALTERATIONS ---- - Interior renovation to the existing walk-in entrance to the emergency and triage area. The renovations will provide interior space for a new security scanning system for all visitors. - As part of this project, a new opening in an existing non-loadbearing exterior wall. ----- TRADES ---- - relocation of a grease trap/interceptor will be required. AS PER PLANS AND AS PER CODE. | $332,000 | May 15, 2026 |
| BCCM | ********** WITHIN AN EXISTING "B" BUSINESS OCCUPANCY ON THE SIXTH FLOOR OF THE MEDSTAR 33RD STREET PROFESSIONAL BUILDING. AREA OF WORK ON THE 6TH FLOOR TO BE 8,371 SF. 48% TOTAL OF THE 6TH FLOOR, 17458 SF +/-. BUILDING MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO: DEMOLITION OF NON-STRUCTURAL INTERIOR PARTITIONS, PLUMBING, ELECTRICAL, AND MECHANICAL. ********** SCOPE OF WORK: -------- LEVEL II INTERIOR ALTERATIONS ------ TO INCLUDE CAT I DEMOLTION TO MAKE ROOM FOR: A NEW SURGICAL TRAINING ROOM. EXPANDED COLD STORAGE, EXPANDED CONFERENCE ROOM, AND RE-ARRANGEMENT OF OFFICE AND STORAGE SPACES. NEW NON-STRUCTURAL PARTITIONS, FINISHES, AND STRUCTURAL AS NEEDED FOR INSTALLATION OF SURGICAL LIGHT BOOMS AND ---------- TRADES ------- PLUMBING, ELECTRICAL, MECHANICAL, ABOVE CEILING WORK AND ON THE FLOOR BELOW AS NEEDED FOR PLUMBING. WORK IN THE ATTIC SPACE ABOVE FOR ELECTRICAL AND CONDENSER FOR COLD STORAGE REFRIGERATOR. AS PER PLANS AND AS PER CODE. | $1,520,726 | Dec 17, 2025 |
| BCCM | ******* DEMOLITION WITHIN AN EXISTING "B" BUSINESS OCCUPANCY SUITE ON THE SIXTH FLOOR OF THE MEDSTAR 33RD STREET PROFESSIONAL BUILDING. ********* SCOPE OF WORK: --------- CAT I DEMOLITION ----------- WORK WITHIN AREAS "A", 2,896 SF., AND "B", 1,128 SF., WILL BE EXPLORATORY DEMOLITION TO AID IN PLANNING FOR FUTURE WORK WITHIN THE SUITE. AS PER PLANS AND AS PER CODE. DEMO ONLY ******** THERE WILL BE NO DEMOLITION OR WORK OUTSIDE OF AREAS "A" AND "B". ********** | — | Jun 20, 2025 |
| COM2024 | INT ONLY DEMO; NON-STRUCTURAL SELECT DEMOLITION OF EXISTING 11,600 SF OFFICE. NO OCCUPANCY. AS PER PLANS AS PER CODE. | $9,000 | Sep 24, 2024 |
| COM2024 | 1 FIRE ALARM DEVICE ADDED IN HALLWAY. 1 FIRE ALARM DEVICE ADDED IN BATHROOM. 2 DEVICES TOTAL ON 3RD FLOOR. | $1,075 | Jul 29, 2024 |
| COM2024 | FIRE ALARM FOR SUITE 680 AS PER PLAN AS PER CODE. | $4,278 | Jun 17, 2024 |
| COM2024 | REPLACE (25) # DISTRIBUTION SYSTEM, RECONSTRUCTION ( # DIFFUSERS) AS PER CODE. | $5,000 | Jun 4, 2024 |
| COM2024 | RELOCATE 24 FIRE SPRINKLERS TO NEW WALL LAYOUT AS PER PLANS AS PER CODE. | $6,000 | Apr 18, 2024 |
| COM2024 | ADD 4 AND RELOCATE 61 SPRINKLER HEADS FOR NEW WALL AND CEILING LAYOUT. | $11,751 | Apr 10, 2024 |
| COM2023 | INTERIOR ALTERATION AND INSTALLATION OF NEW UNISEX ADA RESTROOM PER PLANS PER CODE. | $125,000 | Mar 4, 2024 |
| USE2024 | CONTINUE TO USE AS A HEALTH-CARE CLINIC. | — | Feb 23, 2024 |
| COM2023 | NON STRUCTURAL INTERIOR BUILD-OUT OF NEW MEDICAL OFFICE FOR FUTURE TENANT. WORK INCL. RELATED MEP | $75,000 | Jan 25, 2024 |
| COM2024 | INSTALL (60) # LOW VOLTAGE AS PER CODE. | $16,000 | Jan 17, 2024 |
| COM2023 | SCOPE OF WORK: ----- LEVEL II INTERIOR ALTERATIONS ---- NON-STRUCTURAL INTERIOR TENANT LAYOUT FOR 5,400 SF MEDICAL OFFICE AS PER PLANS AS PER CODE. | $70,000 | Jan 16, 2024 |
| COM2023 | FIRE ALARAM ADDITIONAL DEVICES AS PER PLANS AS PER CODE. | $10,000 | Dec 8, 2023 |
| COM2023 | RELOCATE 19 SPRINKLER HEADS DUE TO CEILING AND WALL RECONFIGURATION AS PER PLANS AS PER CODE. | $7,500 | Oct 2, 2023 |
| COM2023 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2022-02631:LEVEL 2 ALTERATIONS TO INCLUDE THE INTERIOR DEMOLITION AND RENOVATION OF A PORTION OF THE SECOND FLOOR OF THE JOHNSTON PROFESSIONAL BUILDING, THE WORK RECONFIGURES THE EXISTING OUTPATIENT TREATMENT CENTER'S SUPPORT AND EXAMINATION SPACES, WITHOUT CHANGING THE USE OF THE SPACE OR THE THERAPY AREAS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. ) Original Permit Description:(COM2022-02631) LEVEL 2 ALTERATIONS TO INCLUDE THE INTERIOR DEMOLITION AND RENOVATION OF A PORTION OF THE SECOND FLOOR OF THE JOHNSTON PROFESSIONAL BUILDING, THE WORK RECONFIGURES THE EXISTING OUTPATIENT TREATMENT CENTER'S SUPPORT AND EXAMINATION SPACES, WITHOUT CHANGING THE USE OF THE SPACE OR THE THERAPY AREAS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. | — | Jun 14, 2023 |
| COM2022 | LEVEL 2 ALTERATIONS TO INCLUDE THE INTERIOR DEMOLITION AND RENOVATION OF A PORTION OF THE SECOND FLOOR OF THE JOHNSTON PROFESSIONAL BUILDING, THE WORK RECONFIGURES THE EXISTING OUTPATIENT TREATMENT CENTER'S SUPPORT AND EXAMINATION SPACES, WITHOUT CHANGING THE USE OF THE SPACE OR THE THERAPY AREAS AS PER PLANS AS PER CODE. SEPARATE PERMIT REQUIRED FOR SPRINKLER AND FIRE ALARM SYSTEM. | $2,200,000 | Mar 13, 2023 |
| COM2020 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR .(ORIGINAL PERMIT:COM2020-00173:SCOPE OF WORK:--INTERIOR RENOVATION--OF A DOCTOR'S OFFICE TO A PHYSICAL THERAPY SUITE AS PER PLANS AS PER CODE.) Original Permit Description:(COM2020-00173) SCOPE OF WORK:--INTERIOR RENOVATION--OF A DOCTOR'S OFFICE TO A PHYSICAL THERAPY SUITE AS PER PLANS AS PER CODE. | — | May 20, 2020 |
| COM2020 | SCOPE OF WORK:--INTERIOR RENOVATION--OF A DOCTOR'S OFFICE TO A PHYSICAL THERAPY SUITE AS PER PLANS AS PER CODE. | $347,500 | Feb 14, 2020 |
| COM2019 | level 2 alterations to include interior demolition and renovation of the entire third floor of the johnston professional building to provide a new outpatient treatment center along with support and rehabilitation spaces as per plans as per code. separate permits are required for sprinkler, fire alarm, and detection systems. | $2,700,000 | Dec 12, 2019 |
| USE2019 | use 4th floor of johnston professional building at medstar union memorial hospital, as waiting rooms, exam rooms, offices, and two new small x-ray rooms. | — | Apr 30, 2019 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 9, 2026 · 122 m · 109 E 33RD ST
- violation: HCD-Sanitation PropertyJul 8, 2026 · 120 m · 201 E 33RD ST
- violation: SW-Dirty AlleyJul 7, 2026 · 110 m
- violation: HCD-Sanitation PropertyJul 6, 2026 · 140 m
- violation: SW-Dirty AlleyJun 28, 2026 · 140 m
- violation: HCD-Sanitation PropertyJun 26, 2026 · 115 m · 3313 GUILFORD AVE
- violation: HCD-Sanitation PropertyJun 26, 2026 · 125 m · 301 E UNIVERSITY PKWY
- violation: HCD-Sanitation PropertyJun 26, 2026 · 138 m
- violation: PM 305.2.2Jun 26, 2026 · 143 m · 227 E 33RD ST
- violation: HCD-Sanitation PropertyJun 24, 2026 · 120 m · 201 E 33RD ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.