Baltimore City · 21211
700 W 40TH ST
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $56,469,333
- Land use
- Exempt Commercial (EC)
- Year built
- 1973
- Last sale
- Jan 1, 1797
Assessment
| Owner | HOME FOR INCURABLES |
|---|---|
| Land use | Exempt Commercial (EC) |
| Total assessment | $56,469,333 (cycle 2026) |
| Last sale | Jan 1, 1797 |
| Year built | 1973 |
| Zoning | R-9 |
| Vacant | — |
Permits
20| Type | Description | Cost | Issued |
|---|---|---|---|
| BCCM | Provide and install a new nurse call system with 158 devices. | $138,924.78 | May 19, 2026 |
| BCCM | Installation of low voltage access control and cctv systems, including card readers, controllers, security cameras and associated cabling. Work is performed under the authorization of Home for Incurables (Keswick Multi-Care) and coordinated with the general contractor and trade on-site to ensure compliance with project specifications and city codes. Associated with Master Permit COM202401871 | $429,250.4 | Apr 29, 2026 |
| BRCM | LOW VOLTAGE - INSTALLATION OF 478 LOW VOLTAGE DATA CABLES IN SUPPORT OF BUILDING PERMIT COM2024-01871 | $200,000 | Jan 15, 2026 |
| BCCM | Modify existing fire alarm permit to include the following: three (3) LCD annunciator panels, four (4) NAC expander panels, four (4) amplifier panels, twenty-nine (29) strobes, twenty-eight (28) speakers, one hundred sixty-six (166) speaker / strobes., fourteen (14) pull stations, one hundred ninety-nine (199), ten (10) duct detectors, twenty-five (25) control modules, thirty-two (32) magnetic door holders and thirty-one (31) fire / smoke dampers AS PER PLANS AS PER CODE. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | $121,385 | Jan 7, 2026 |
| BCCM | Modify existing NFPA13 sprinkler system to accommodate the interior modifications being performed to floors 1-3 | $71,850 | Oct 24, 2025 |
| BCCM | INSTALL 150 LOW VOLTAGE DEVICES. | $50,000 | Oct 3, 2025 |
| COM2024 | ******* ALL WORK IS INTERIOR OR RELATED TO THE BUILDING SKIN. ******** SCOPE OF WORK: -------- LEVEL III INTERIOR ALTERATIONS ------- IMPROVEMENTS TO INCLUDE - GROUND FLOOR: PART OF FLOOR LAYOUT WILL BE REVISED TO CREATE A NEW BISTRO / LOUNGE, ADMISSIONS SUITE, CHAPEL, MULTIPURPOSE ROOM, STORAGE, AV CLOSET, JANITOR’S CLOSET, PANTRY AND TOILET ROOMS. NEW FINISHES (WALL, CEILING AND FLOOR), MILLWORK AND FURNITURE WILL BE PROVIDED IN THE REVISED AREAS TOGETHER WITH NEW FINISHES AT THE EXISTING PUBLIC RESTROOMS OF SOUTH COGGINS. *LEVELS 1 THROUGH 3: ENTIRE FLOOR LAYOUTS WILL BE REVISED TO CREATE TWO HOUSEHOLDS WITH LARGER RESIDENTIAL UNITS AND RELEVANT SUPPORT SPACES. NEW FINISHES (WALL, CEILING AND FLOOR), MILLWORK AND FURNITURE WILL BE PROVIDED THROUGHOUT THE FLOORS. ALL LEVELS INCL. *GROUND FLOOR IN THEIR ENTIRETY: ALL EXISTING MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION AND LOW VOLTAGE SYSTEMS WILL BE DEMOLISHED AND REPLACED WITH NEW. --------- EXTERIOR ALTERATIONS -------- *IMPROVEMENTS TO INCLUDE: WINDOWS: NEW WINDOWS ARE BEING PROVIDED IN LIMITED LOCATIONS AS INDICATED ON THE DRAWINGS. DOORS: AT THE GROUND LEVEL, THERE WILL BE SOME NEW REPLACEMENT DOORS AT CERTAIN LOCATIONS OF THE BUILDING EXTERIOR WHILE SOME EXISTING EXTERIOR DOORS WILL RECEIVE NEW HARDWARE. *ROOF: THERE WILL BE NEW HVAC EQUIPMENT ON THE ROOF SUPPORTED BY DUNNAGE STEEL. THE ROOF MEMBRANE AT BASES OF THE STEEL POSTS WILL HAVE TO BE PATCHED. NEW INSULATION WILL BE PROVIDED ON THE UNDERSIDE OF THE NORTH COGGINS ROOF AND NORTH COGGINS TERRACE. NEITHER THE ROOF NOR THE TERRACE WILL BE DISTURBED FROM THE OUTSIDE FOR THIS PURPOSE. SKIN: NEW INSULATION WILL BE PROVIDED ON THE INTERIOR SIDE OF NORTH COGGINS BUILDING SKIN. THE SKIN WILL NOT BE DISTURBED FROM THE OUTSIDE FOR THIS PURPOSE. AS PER PLANS AS PER CODE. ********* SEPARATE PERMIT REQUIRED FOR FIRE ALARM & SPRINKLER SYSTEM. ********* | — | Apr 11, 2025 |
| COM2024 | INSTALLING 1487' OF 1/2 COAX CABLE (LOW VOLTAGE) AND 8 CEILING MOUNT ANTENNAS FOR ERRC/PULBIC SAFETY IN BLDG RADIO SYSTEM. AS PER PLANS AS PER CODE. | — | Apr 4, 2025 |
| COM2024 | Extend Original Permit.(original permit:COM2024-65125:INSTALL (85) # LOW VOLTAGE AS PER CODE.) Original Permit Description:(COM2024-65125) INSTALL (85) # LOW VOLTAGE AS PER CODE. | — | Dec 11, 2024 |
| COM2024 | INSTALL ALARM AS PER PLANS AS PER CODE. | $22,115 | Aug 23, 2024 |
| COM2024 | ADD 185 SPRINKLER HEADS TO NFPA13 SPRINKLER SYSTEM FOR PIPE MODS FOR CURRENT TENANT RENOVATIONS AS PER PLANS AS PER CODE. | $13,875 | Aug 13, 2024 |
| COM2024 | INSTALL (85) # LOW VOLTAGE AS PER CODE. | $35,000 | May 2, 2024 |
| COM2024 | AMEND PERMIT: ADD PLUMBER AND HVAC CONTRACTOR. (ORIGINAL PERMIT:COM2023-03664: ******* INTERIOR RENOVATION OF THE LOWER LEVEL OF THE SOUTH AND NORTH COGGINS BUILDINGS AND A TARGETED INTERIOR RENOVATION OF PORTIONS OF THE BAKER BUILDING. ******* SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS -------- IN THE BAKER BUILDING, ONE OF THE OFFICES FACING THE NORTH COGGINS BUILDING WILL BE RE-CONFIGURED TO CREATE A NEW CONFERENCE ROOM AND ENTRY VESTIBULE. THE CONFERENCE ROOM WILL RECEIVE NEW FINISHES. A NEW NORTH COGGINS ENTRY VESTIBULE WILL BE CREATED AT THE FUTURE LOCATION OF THE COVERED CONNECTOR THAT WILL ALLOW PASSAGE FROM THE NORTH COGGINS BUILDING TO THE BAKER BUILDING. ------ EXTERIOR ALTERATIONS ----- THE EXISTING NORTH COGGINS CAFÉ ENTRANCE WILL BE REDESIGNED. A NEW STOREFRONT SYSTEM FACING THE EXISTING COURTYARD. THE NEW ENTRY VESTIBULE WILL HAVE AN EXTERIOR CANOPY AND CORRESPONDING EXTERIOR SUPPORT COLUMNS. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-03664) ******* INTERIOR RENOVATION OF THE LOWER LEVEL OF THE SOUTH AND NORTH COGGINS BUILDINGS AND A TARGETED INTERIOR RENOVATION OF PORTIONS OF THE BAKER BUILDING. ******* SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS -------- IN THE BAKER BUILDING, ONE OF THE OFFICES FACING THE NORTH COGGINS BUILDING WILL BE RE-CONFIGURED TO CREATE A NEW CONFERENCE ROOM AND ENTRY VESTIBULE. THE CONFERENCE ROOM WILL RECEIVE NEW FINISHES. A NEW NORTH COGGINS ENTRY VESTIBULE WILL BE CREATED AT THE FUTURE LOCATION OF THE COVERED CONNECTOR THAT WILL ALLOW PASSAGE FROM THE NORTH COGGINS BUILDING TO THE BAKER BUILDING. ------ EXTERIOR ALTERATIONS ----- THE EXISTING NORTH COGGINS CAFÉ ENTRANCE WILL BE REDESIGNED. A NEW STOREFRONT SYSTEM FACING THE EXISTING COURTYARD. THE NEW ENTRY VESTIBULE WILL HAVE AN EXTERIOR CANOPY AND CORRESPONDING EXTERIOR SUPPORT COLUMNS. AS PER PLANS AS PER CODE. | — | Apr 25, 2024 |
| COM2024 | AMEND PERMIT: ADD ELECTRICAL CONTRACTOR . (ORIGINAL PERMIT:COM2023-03664: ******* INTERIOR RENOVATION OF THE LOWER LEVEL OF THE SOUTH AND NORTH COGGINS BUILDINGS AND A TARGETED INTERIOR RENOVATION OF PORTIONS OF THE BAKER BUILDING. ******* SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS -------- IN THE BAKER BUILDING, ONE OF THE OFFICES FACING THE NORTH COGGINS BUILDING WILL BE RE-CONFIGURED TO CREATE A NEW CONFERENCE ROOM AND ENTRY VESTIBULE. THE CONFERENCE ROOM WILL RECEIVE NEW FINISHES. A NEW NORTH COGGINS ENTRY VESTIBULE WILL BE CREATED AT THE FUTURE LOCATION OF THE COVERED CONNECTOR THAT WILL ALLOW PASSAGE FROM THE NORTH COGGINS BUILDING TO THE BAKER BUILDING. ------ EXTERIOR ALTERATIONS ----- THE EXISTING NORTH COGGINS CAFÉ ENTRANCE WILL BE REDESIGNED. A NEW STOREFRONT SYSTEM FACING THE EXISTING COURTYARD. THE NEW ENTRY VESTIBULE WILL HAVE AN EXTERIOR CANOPY AND CORRESPONDING EXTERIOR SUPPORT COLUMNS. AS PER PLANS AS PER CODE.) Original Permit Description:(COM2023-03664) ******* INTERIOR RENOVATION OF THE LOWER LEVEL OF THE SOUTH AND NORTH COGGINS BUILDINGS AND A TARGETED INTERIOR RENOVATION OF PORTIONS OF THE BAKER BUILDING. ******* SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS -------- IN THE BAKER BUILDING, ONE OF THE OFFICES FACING THE NORTH COGGINS BUILDING WILL BE RE-CONFIGURED TO CREATE A NEW CONFERENCE ROOM AND ENTRY VESTIBULE. THE CONFERENCE ROOM WILL RECEIVE NEW FINISHES. A NEW NORTH COGGINS ENTRY VESTIBULE WILL BE CREATED AT THE FUTURE LOCATION OF THE COVERED CONNECTOR THAT WILL ALLOW PASSAGE FROM THE NORTH COGGINS BUILDING TO THE BAKER BUILDING. ------ EXTERIOR ALTERATIONS ----- THE EXISTING NORTH COGGINS CAFÉ ENTRANCE WILL BE REDESIGNED. A NEW STOREFRONT SYSTEM FACING THE EXISTING COURTYARD. THE NEW ENTRY VESTIBULE WILL HAVE AN EXTERIOR CANOPY AND CORRESPONDING EXTERIOR SUPPORT COLUMNS. AS PER PLANS AS PER CODE. | — | Apr 18, 2024 |
| COM2023 | ******* INTERIOR RENOVATION OF THE LOWER LEVEL OF THE SOUTH AND NORTH COGGINS BUILDINGS AND A TARGETED INTERIOR RENOVATION OF PORTIONS OF THE BAKER BUILDING. ******* SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS -------- IN THE BAKER BUILDING, ONE OF THE OFFICES FACING THE NORTH COGGINS BUILDING WILL BE RE-CONFIGURED TO CREATE A NEW CONFERENCE ROOM AND ENTRY VESTIBULE. THE CONFERENCE ROOM WILL RECEIVE NEW FINISHES. A NEW NORTH COGGINS ENTRY VESTIBULE WILL BE CREATED AT THE FUTURE LOCATION OF THE COVERED CONNECTOR THAT WILL ALLOW PASSAGE FROM THE NORTH COGGINS BUILDING TO THE BAKER BUILDING. ------ EXTERIOR ALTERATIONS ----- THE EXISTING NORTH COGGINS CAFÉ ENTRANCE WILL BE REDESIGNED. A NEW STOREFRONT SYSTEM FACING THE EXISTING COURTYARD. THE NEW ENTRY VESTIBULE WILL HAVE AN EXTERIOR CANOPY AND CORRESPONDING EXTERIOR SUPPORT COLUMNS. AS PER PLANS AS PER CODE. | $4,900,000 | Apr 17, 2024 |
| COM2023 | INSTALL (7) # ANNUAL TESTING INSPECTION AS PER CODE. | $500 | Aug 24, 2023 |
| USE2022 | USE LOWER LEVEL AS A DIALYSIS TREATMENT AND ANCILLARY AREAS AND PROVIDE A DIALYSIS MACHINE STORAGE AREA. | — | May 5, 2022 |
| COM2022 | INSTALL ONE NEW FIRE ALARM STROBE AS PER PLANS AS PER CODE. | $2,500 | Apr 11, 2022 |
| COM2022 | THE ADDITION OF 2 SPRINKLERS AND RELOCATION OF 12 SPRINKLERS TO PROVIDE PROPER COVERAGE FOR RENOVATED AREA. | $4,050 | Mar 14, 2022 |
| COM2021 | SCOPE OF WORK:---INTERIOR ALTERATIONS----THE CONVERSION OF THREE EXISTING OFFICES AND PART OF A CONFERENCE ROOM INTO DIALYSIS TREATMENT AND ANCILLARY AREAS AND PROVIDE A DIALYSIS MACHINE STORAGE ON THE LOWER LEVEL. NO WORK ON THE GROUND AND FIRST FLOOR AS PER PLANS AS PER CODE. | $200,000 | Jan 26, 2022 |
Violations
0No violations on record.
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJun 26, 2026 · 131 m
- permit: BRCMMar 26, 2026 · 125 m · 703 W UNIVERSITY PKWY
- permit: BRCMJan 27, 2026 · 125 m · 703 W UNIVERSITY PKWY
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;