1101 W 42ND ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$260,900
Land use
Residential (R)
Year built
1924
Last sale
May 22, 2025

Assessment

OwnerJIMENEZ, ADAM N
Land useResidential (R)
Total assessment$260,900 (cycle 2026)
Last saleMay 22, 2025 — $261,000
Year built1924
ZoningR-7
Vacant

Permits

5
TypeDescriptionCostIssued
BRCMRenovation at location. Remove gas fired boiler and cool only AC system. Replace with new York heat pump with aux. electric heat. Modify ducting for new system. Electrical performed by Electric Contractor.$15,790May 22, 2026
BRCMheavy up to 200 amps remove old wiring install new wiring install outlets and switches to code wire up hvac equipment install smoke detectors to code$10,000Apr 1, 2026
BRCM1.Excavate the concrete and dirt at the water meter box to expose the main water line. Pull new line from basement. Install PRV, dual check and isolation valves. Expansion tank present. Patch concrete as needed. 2.BGE to relocate gas meter. Abandon all existing gas pipe. Run dedicated gas line to range. Pull permit, stand inspection. 3. 3. Remove the 4” cast iron over head in the basement near the old bar. Replace with PVC. 4. Laundry Rough in: Relocate waste and water to accommodate new laundry location. This will be where the existing kitchen is. Donovan Waterworks is not responsible for dryer termination. 5. Kitchen Rough in: Install waste and water for new 3 piece kitchen location. Run gas line for future range. Install ice maker line for future fridge 6. Upstairs Bathroom Rough in: Client to have bathroom demolished prior to the start of work. This also includes removal of the ceiling below. Rough in waste and water for tub, vanity and toilet. The shower valve will be client supplied. 7. Basement Bathroom-Rough In: Rough in waste and water for 3 piece bathroom in the existing laundry room area. The shower valve will be client supplied. We will stub up for a shower drain. The client will be responsible for the drain trim. Supply and install sewage ejection system adjacent to the new bathroom. 8. Install waste and water for first floor powder rm. Customer just wants the rough in. Contractor to do trim. Donovan Waterworks is not responsible for framing, electrical work, shower pan, fixtures, the condition of the existing plumbing, concrete work, stop valves or setting trim. Should the homeowner fail the trim inspection, additional charges will apply.$35,437.95Oct 14, 2025
BRCMWork at basement only. Adding framing to basement; adding partition wall to separate the space; build out the full bathroom - enclose all with drywall. Separate permit will be required for electrical, mechanical, and plumbing work. As per plans and as per code.$35,000Oct 10, 2025
BRCM100 amp to 200 amp heavy up$3,100Jun 30, 2025

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.