Baltimore City · 21217
2720 AUCHENTOROLY TERR
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $34,500
- Land use
- Residential (R)
- Year built
- 1920
- Last sale
- May 9, 2023
Assessment
| Owner | 254 RISE UP, LLC |
|---|---|
| Land use | Residential (R) |
| Total assessment | $34,500 (cycle 2026) |
| Last sale | May 9, 2023 |
| Year built | 1920 |
| Zoning | R-8 |
| Vacant | Yes |
Permits
11| Type | Description | Cost | Issued |
|---|---|---|---|
| COM2023 | AMEND PERMIT: CHANGE HVAC CONTRACTOR . EXTEND ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-54613:INSTALL (2) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 90000 BTU FUEL-BURNING EQUIP(FURNACE), (2) 60 CFM EXHAUST SYSTEMS AS PER CODE.) Original Permit Description:(COM2023-54613) INSTALL (2) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 90000 BTU FUEL-BURNING EQUIP(FURNACE), (2) 60 CFM EXHAUST SYSTEMS AS PER CODE. | — | Sep 27, 2023 |
| COM2023 | REINSTATE ORIGINAL PERMIT.(ORIGINAL PERMIT:COM2023-52185:INSTALL (15) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # WATER SERVICE PIPE (RECONSTRUCTION), (2) # SANITARY CONNECTION (RECONSTRUCTION0, (2) # ELECTRIC WATER HEATER, (2) 90000 BTU FUEL-BURNING EQUIP AS PER CODE.) Original Permit Description:(COM2023-52185) INSTALL (15) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # WATER SERVICE PIPE (RECONSTRUCTION), (2) # SANITARY CONNECTION (RECONSTRUCTION0, (2) # ELECTRIC WATER HEATER, (2) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | — | Sep 15, 2023 |
| COM2023 | AA CONV: Full Description Loaded as Comment | — | Aug 21, 2023 |
| COM2023 | SCOPE OF WORK: ELECTRICAL ALTERATIONS TO INCLUDE: INTERIOR REWIRE INCLUDING ROUGH SERVICE AND TRIM, SERVICE, FIXTURES/DEVICES AND CIRCUITS, AS PER CODE | $4,000 | Feb 24, 2023 |
| COM2023 | INSTALL (2) 30000 BTU AIR-CON SYSTEM, HEAT PUMP, (2) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 90000 BTU FUEL-BURNING EQUIP(FURNACE), (2) 60 CFM EXHAUST SYSTEMS AS PER CODE. | $19,000 | Feb 10, 2023 |
| COM2023 | INSTALL (15) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # PLUMBING FIXTURES, (2) # WATER SERVICE PIPE (RECONSTRUCTION), (2) # SANITARY CONNECTION (RECONSTRUCTION0, (2) # ELECTRIC WATER HEATER, (2) 90000 BTU FUEL-BURNING EQUIP AS PER CODE. | $1,100 | Jan 23, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR/EXTERIOR DEMOLITION INTERIOR (CATEGORY III): REMOVE FLOOR JOISTS ON FIRST AND SECOND FLOOR AND RAISE AND REPLACE JOIST PER DRAWINGS. REMOVE INTERIOR PARTITION WALLS. EXTERIOR REMOVE DETERIORATED REAR EXTERIOR WALL ON ALL 2 LEVELS. ALTERATIONS: INTERIOR INSTALL 2 NEW KITCHEN, NEW FLOORING, NEW DRYWALL, NEW INTERIOR DOORS, 3 EXTERIOR DOORS SAME SIZE, INSTALL 12 NEW WINDOWS, FRAMING PARTITION WALL WITH 2X4 LUMBER AND EXTERIOR WALL WITH 2X6, INSTALL R49 IN CEILING AND R21 ON EXTERIOR WALLS. DECK CONSTRUCTION, SEPARATE WILL BE PULLED FOR MEP WORK. AS PER PLANS AND AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)******* AS PER CHAP:RETROACTIVE APPROVAL FOR THE DEMOLITION OF THE REAR ADDITION AND THE REPLACEMENT OF THE ROOFING MEMBRANE AND STRUCTURAL JOISTS; AND INSTALLATION OF A NEW MODIFIED BITUMEN ROOFING MEMBRANE. PROPOSED WORK WILL INCLUDE THE REPLACEMENT OF A SKYLIGHT WITH A SUN-TEK SKYLIGHT, RECONSTRUCTION OF THE REAR ADDITION IN THE SAME FOOTPRINT, CLADDING THE ADDITION WITH SMOOTH HARDIEBOARD SIDING. ON REAR, REMOVE ALL WINDOWS (WHICH ARE REPLACEMENT WINDOWS), AND INSTALL WINDOWS THAT COMPLETELY FILL THE WINDOW OPENINGS. CREATE NEW WINDOW OPENING IN BASEMENT LEVEL OF SIDE ELEVATION. WINDOWS INSTALLED IN BRICK WALLS WILL HAVE BALTIMORE BULLNOSE BRICKMOLD. INSTALL WINDOWS IN REAR ADDITION, WHICH WILL NOT REQUIRE BULLNOSE BRICKMOLD. ALL NEW WINDOWS ON REAR WILL BE PELLA LIFESTYLE 1/1 WHITE VINYL-CLAD WOOD WINDOWS. INSTALL THREE NEW 6 PANEL STEEL DOORS ON REAR, WITH TRANSOM WINDOWS ABOVE. INSTALL 3 HAMPTON BAY BLACK OUTDOOR LED WALL SCONCES AT REAR BY DOORS. CONSTRUCT NEW REAR TWO-STORY DECK, WITH WOOD DECKING, WOOD RAILINGS, AND WOODEN STEPS TO GRADE. APPLICANT TO SUBMIT PROPOSED COLORS OF FEATURES (DOORS, SIDING) TO STAFF FOR REVIEW PRIOR TO INSTALLATION. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES AND BUILDING PERMITS DATED MARCH 1, 2021 EXCEPT WHERE THIS ATP SUPERCEDES. NO EXTERIOR ALTERATIONS ARE TO BE COMPLETED OUTSIDE OF THIS SCOPE; IF EXTERIOR SCOPE CHANGES; APPLICANT WILL NEED TO SUBMIT REVISIONS FOR CHAP REVIEW AND APPROVAL. | $145,000 | Jan 18, 2023 |
| COM2021 | SCOPE OF WORK: INTERIOR/EXTERIOR DEMOLITION INTERIOR (CATEGORY III): REMOVE FLOOR JOISTS ON FIRST AND SECOND FLOOR AND RAISE AND REPLACE JOIST PER DRAWINGS. REMOVE INTERIOR PARTITION WALLS. EXTERIOR REMOVE DETERIORATED REAR EXTERIOR WALL ON ALL 2 LEVELS. ALTERATIONS: INTERIOR INSTALL 2 NEW KITCHEN, NEW FLOORING, NEW DRYWALL, NEW INTERIOR DOORS, 3 EXTERIOR DOORS SAME SIZE, INSTALL 12 NEW WINDOWS, FRAMING PARTITION WALL WITH 2X4 LUMBER AND EXTERIOR WALL WITH 2X6, INSTALL R49 IN CEILING AND R21 ON EXTERIOR WALLS. SEPARATE WILL BE PULLED FOR MEP WORK. AS PER PLANS AND AS PER CODE. (*NOTES: 1. ALL HABITABLE AREAS WILL MAINTAIN MINIMUM CEILING HEIGHT OF 7', 2. ALL HALLWAYS WILL MAINTAIN MINIMUM WIDTH OF 36'', 3. ALL BEDROOMS WILL MAINTAIN MINIMUM 70SQ/FT FOR ONE OCCUPANT OR 50SQ/FT PER OCCUPANT, 4. ALL BATHROOMS WILL MAINTAIN ENOUGH CLEAR FLOOR SPACE FOR CLEARANCE OF PLUMBING FIXTURES)******* AS PER CHAP: RETROACTIVE APPROVAL FOR THE DEMOLITION OF THE REAR ADDITION AND THE REPLACEMENT OF THE ROOFING MEMBRANE AND STRUCTURAL JOISTS; AND INSTALLATION OF A NEW MODIFIED BITUMEN ROOFING MEMBRANE. PROPOSED WORK WILL INCLUDE THE REPLACEMENT OF A SKYLIGHT WITH A SUN-TEK SKYLIGHT, RECONSTRUCTION OF THE REAR ADDITION IN THE SAME FOOTPRINT, CLADDING THE ADDITION WITH SMOOTH HARDIEBOARD SIDING. ON REAR, REMOVE ALL WINDOWS (WHICH ARE REPLACEMENT WINDOWS), AND INSTALL WINDOWS THAT COMPLETELY FILL THE WINDOW OPENINGS. CREATE NEW WINDOW OPENING IN BASEMENT LEVEL OF SIDE ELEVATION. WINDOWS INSTALLED IN BRICK WALLS WILL HAVE BALTIMORE BULLNOSE BRICKMOLD. INSTALL WINDOWS IN REAR ADDITION, WHICH WILL NOT REQUIRE BULLNOSE BRICKMOLD. ALL NEW WINDOWS ON REAR WILL BE PELLA LIFESTYLE 1/1 WHITE VINYL-CLAD WOOD WINDOWS. INSTALL THREE NEW 6 PANEL STEEL DOORS ON REAR, WITH TRANSOM WINDOWS ABOVE. INSTALL 3 HAMPTON BAY BLACK OUTDOOR LED WALL SCONCES AT REAR BY DOORS. CONSTRUCT NEW REAR TWO-STORY DECK, WITH WOOD DECKING, WOOD RAILINGS, AND WOODEN STEPS TO GRADE. APPLICANT TO SUBMIT PROPOSED COLORS OF FEATURES (DOORS, SIDING) TO STAFF FOR REVIEW PRIOR TO INSTALLATION. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES AND BUILDING PERMITS DATED MARCH 1, 2021 EXCEPT WHERE THIS ATP SUPERCEDES. NO EXTERIOR ALTERATIONS ARE TO BE COMPLETED OUTSIDE OF THIS SCOPE; IF EXTERIOR SCOPE CHANGES; APPLICANT WILL NEED TO SUBMIT REVISIONS FOR CHAP REVIEW AND APPROVAL. | $165,000 | Apr 7, 2022 |
| BMZ2021 | to renovate the property for three dwelling unit | — | Sep 2, 2021 |
| COM2021 | FULL INTERIOR RENOVATION AND ALTERATION WITH REAR EXTERIOR OPEN DECK ADDITION AS PER PLANS AS PER CODE. | — | Jul 13, 2021 |
| COM2020 | SCOPE OF WORK: INTERIOR ALTERATIONS TO INCLUDE: INTERIOR DEMOLITION (CATEGORY I): REMOVAL OF NON-STRUCTURAL WALLS AND REMOVAL OF ALL ASSOCIATED DEBRIS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE, *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY, SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS/TENANT FITOUT | $8,000 | Jan 5, 2021 |
Violations
1| Kind | Category | Status | Date |
|---|---|---|---|
| vacant_building_notice | Vacant | open | Oct 7, 2021 |
Inspections
4| Type | Status |
|---|---|
| InitialECB | OPEN |
| InitialECB | OPEN |
| InitialECB | OPEN |
| InitialECB | OPEN |
Nearby recent activity
- violation: HCD-Sanitation PropertyJul 9, 2026 · 108 m · 2734 PARKWOOD AVE
- violation: HCD-Sanitation PropertyJul 9, 2026 · 143 m · 2851 WOODBROOK AVE
- violation: HCD-Sanitation PropertyJul 7, 2026 · 74 m
- violation: SW-HGWJul 7, 2026 · 135 m · 2825 WOODBROOK AVE
- violation: HCD-Sanitation PropertyJul 6, 2026 · 108 m · 2734 PARKWOOD AVE
- violation: SW-Dirty AlleyJul 6, 2026 · 108 m · 2734 PARKWOOD AVE
- violation: SW-Dirty AlleyJul 6, 2026 · 135 m · 2823 WOODBROOK AVE
- violation: HCD-Vacant BuildingJul 3, 2026 · 69 m · 2731 PARKWOOD AVE
- permit: BRCMJul 3, 2026 · 144 m · 2857 WOODBROOK AVE
- violation: HCD-CCE Building Permit ComplaintJul 2, 2026 · 67 m
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.