Baltimore City · 21217

2611 FRANCIS ST

Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.

Total assessment
$85,300
Land use
Residential (R)
Year built
1880
Last sale
Dec 9, 2002

Assessment

OwnerLITTLEJOHN, ADDIE
Land useResidential (R)
Total assessment$85,300 (cycle 2026)
Last saleDec 9, 2002 — $7,200
Year built1880
ZoningR-8
Vacant

Permits

4
TypeDescriptionCostIssued
BRCMScope of work: Installation of interior stair lift as per code and as per specifications$2,310May 8, 2025
BUSEUSE PROPERTY AS SINGLE FAMILY DWELLINGApr 21, 2025
COM2024 ******* LOAN GRANT ******** SCOPE OF WORK: ------ INTERIOR ALTERATIONS ------ . REMOVE INTERIOR WALLS, FLOOR JOIST AND STAIR. . REMOVE ALL EXISTING SUBFLOORS AND FINISH FLOORS IN HOUSE, ALONG WITH ALL PANELING AND DROP CEILINGS. REMOVE EVERYTHING FROM BASEMENT. · RENOVATE SECOND FLOOR WITH TWO BEDROOMS, BATH AND LAUNDRY ROOM. · NEW STAIR FROM BASEMENT TO SECOND FLOOR · RENOVATE FIRST FLOOR WITH NEW STAIR, KITCHEN . NEW 3/4 SUB-FLOORING WILL BE INSTALLED ON ALL INTERIOR FLOORS. FRAME INTERIOR WALLS AND INSULATE ACCORDING TO DRAWINGS AND CODES. . INSTALL NEW WATERPROOF FLOORING ON ALLFLOORS EXCEPT BATHROOM. ------ EXTERIOR ALTERATIONS ------ · REMOVE AND REPLACE EXTERIOR STEPS AT FRONT AND REAR . · RENOVATE ROOF WITH NEW BEAMS SCOPE:DEMO EXISTING ROOFING MEMBRANE AND APPROX. 30 SQ FT FOBAD DECKING. INSTALL APPROX. 01 SHEETS OF FIRE RATED 34/ PLYWOOD. INSTALL FIRE RETARDANT BASE SHEET WITH METAL CAP NAILS. INSTALL A WHITE GRANULATED FIRESTONE MODIFIED RUBBER COOL ROOF. ALL WALLS WILL BE FLASHED AND ALL VENT PIPES FIELD WRAPPED. DRIP EDGE WILL BE INSTALLED ON THE EDGE OF ALL WALLS. NEW FACIA BOARD WILL BE INSTALLED ON THE REAR OF BUILDING. THIS BOARD WILL BE WRAPPED WITH WHITE ALUMINUM COIL STOCK METAL. A FIVE-INCH K STYLE GUTTER WILL BE INSTALLED ALONG WITH 2X3 DOWNSPOUTS. REPLACE 12 WINDOWS WITH DOUBLE HUNG THAN 35 ALL WINDOWS WILL ALSO HAVE LOW "E" GLASS. ALL WINDOWS WILL BE CAPPED WITH ALUMINUM. ALL BAD WOOD IN FRAMES WILL BE REPLACED. REPLACE ALL LOOSE BRICK IN REAR WALL. POINT UP ALL LOOSE MORTAR IN REAR WALL. THE EXISTING CONCRETE STEPS WILL BE REMOVED AND REPLACED WITH NEW CONCRETE STEPS. THE REAR STEPS WILL BE REMOVED AND NEW TREARED STEPS INSTALLED. ------ TRADE WORK ------ . INSTALL 200 AMP SERVICE. 22 CIRCUITS AND 25 FIXTURES AND DEVICES TO REWIRE ENTIRE HOUSE TO BRING UP TO CODE; INSTALL NEW FURNACE AND STOVE WITH GAS TEST; SYSTEM TO CODE WITH DUCT WORK; INSTALL ALL NEW PLUMBING; INSTALL BATHROOM 5 FIXTURES, TOILET, VANITY, TUB; WATER AND WASRE RECONSTRUCT; ELECTRIC HOT WATER HEATER; CERAMIC SHOWER AND FLOOR AREA; AS PER PLANS AND AS PER CODE.$151,500Jan 23, 2025
COM2024SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: DEMO EXISTING NON-LOAD BEARING WALLS AND ROOFING MEMBRANE. INSTALL NEW FIRESTONE COOL ROOF OVER EXISTING DECK AS PER MANUFACTURES SPECS, *NO STRUCTURAL ALTERATIONS TO BE DONE, AS PER CODE$8,000Jan 2, 2025

Violations

0

No violations on record.

Inspections

0

No inspections on record.

Nearby recent activity

Records marked with * are matched by address, not a direct account link. Data is informational only.

Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;

Official sources: Maryland SDAT, Baltimore City permits.