Baltimore City · 21217
2315 EUTAW PL
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $90,467
- Land use
- Residential (R)
- Year built
- 1915
- Last sale
- Jul 3, 2019
Assessment
| Owner | HAMBLIN, CATHERINE A |
|---|---|
| Land use | Residential (R) |
| Total assessment | $90,467 (cycle 2026) |
| Last sale | Jul 3, 2019 — $206,900 |
| Year built | 1915 |
| Zoning | R-7 |
| Vacant | — |
Permits
12| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | Furnish and installation of ducted split system and duct supply and return | $22,800 | Oct 16, 2025 |
| COM2024 | AA CONV: Full Description Loaded as Comment | — | Oct 22, 2024 |
| COM2024 | ROUGH IN DRAIN VENT WATER LINES FOR 2 FULL BATHS, ONE KITCHEN LAUNDRY AND MOP SINK IN BASEMENT. RUN STACK AND WATER LINES TO FIRST FLOOR FOR FUTURE. RUN VENTS UP TO ATTIC. WE WILL INSTALL TWO SUMP PUMPS. RETURN TO TRIM OUT- AS PER CODE. REPLACE SEWER LINE, INSTALL TWO CLEANOUTS AS PER CODE. | $18,000 | Apr 18, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2023-76274:THIS WORK IS AN EXTENSION OF COM2023-73847 AND COM2022-76956. THE ORIGINAL PERMIT APPLICATION DID NOT INCLUDE A BASEMENT APARTMENT, BECAUSE WE HAD NOT YET SECURED ZONING APPROVAL. SINCE THEN, A ZONING BILL WAS PASSED TO CONVERT THE PROPERTY FROM SINGLE-FAMILY TO A TWO-UNIT BUILDING. THE LEGISLATION FILE # IS 22-0221. THE ENACTMENT # IS 22-174. THE BILL WAS SIGNED BY THE MAYOR ON NOVEMBER 21, 2022. WE ARE SUBMITTING THIS NEW PERMIT APPLICATION TO ADD A BASEMENT APARTMENT. JUST LIKE OUR EXISTING PERMIT FOR THE MAIN HOUSE, THIS AMENDMENT SHOULD NOT INCLUDE HVAC, PLUMBING OR ELECTRICAL WORK. THAT WORK WILL BE PERFORMED BY SUBCONTRACTORS, WHO WILL PULL THEIR OWN PERMITS. I AM UPLOADING THE ORIGINAL SET OF PLANS FOR YOUR REFERENCE. I AM ALSO UPLOADING AMENDED VERSIONS OF SHEETS A1 AND A9 THAT NOW INCLUDE THE BASEMENT APARTMENT. NO OTHER SHEETS OF THE ORIGINAL PERMITS HAVE BEEN MODIFIED. THE NEW SHEETS ARE SIGNED AND SEALED. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *TWO PLAN SHEETS WERE PREVIOUSLY APPROVED, *APPROVING FOR INTERIOR WORK ON BASEMENT APT ONLY) Original Permit Description:(COM2023-76274) THIS WORK IS AN EXTENSION OF COM2023-73847 AND COM2022-76956. THE ORIGINAL PERMIT APPLICATION DID NOT INCLUDE A BASEMENT APARTMENT, BECAUSE WE HAD NOT YET SECURED ZONING APPROVAL. SINCE THEN, A ZONING BILL WAS PASSED TO CONVERT THE PROPERTY FROM SINGLE-FAMILY TO A TWO-UNIT BUILDING. THE LEGISLATION FILE # IS 22-0221. THE ENACTMENT # IS 22-174. THE BILL WAS SIGNED BY THE MAYOR ON NOVEMBER 21, 2022. WE ARE SUBMITTING THIS NEW PERMIT APPLICATION TO ADD A BASEMENT APARTMENT. JUST LIKE OUR EXISTING PERMIT FOR THE MAIN HOUSE, THIS AMENDMENT SHOULD NOT INCLUDE HVAC, PLUMBING OR ELECTRICAL WORK. THAT WORK WILL BE PERFORMED BY SUBCONTRACTORS, WHO WILL PULL THEIR OWN PERMITS. I AM UPLOADING THE ORIGINAL SET OF PLANS FOR YOUR REFERENCE. I AM ALSO UPLOADING AMENDED VERSIONS OF SHEETS A1 AND A9 THAT NOW INCLUDE THE BASEMENT APARTMENT. NO OTHER SHEETS OF THE ORIGINAL PERMITS HAVE BEEN MODIFIED. THE NEW SHEETS ARE SIGNED AND SEALED. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *TWO PLAN SHEETS WERE PREVIOUSLY APPROVED, *APPROVING FOR INTERIOR WORK ON BASEMENT APT ONLY | — | Apr 12, 2024 |
| COM2024 | AA CONV: Full Description Loaded as Comment | — | Apr 10, 2024 |
| COM2023 | THIS WORK IS AN EXTENSION OF COM2023-73847 AND COM2022-76956. THE ORIGINAL PERMIT APPLICATION DID NOT INCLUDE A BASEMENT APARTMENT, BECAUSE WE HAD NOT YET SECURED ZONING APPROVAL. SINCE THEN, A ZONING BILL WAS PASSED TO CONVERT THE PROPERTY FROM SINGLE-FAMILY TO A TWO-UNIT BUILDING. THE LEGISLATION FILE # IS 22-0221. THE ENACTMENT # IS 22-174. THE BILL WAS SIGNED BY THE MAYOR ON NOVEMBER 21, 2022. WE ARE SUBMITTING THIS NEW PERMIT APPLICATION TO ADD A BASEMENT APARTMENT. JUST LIKE OUR EXISTING PERMIT FOR THE MAIN HOUSE, THIS AMENDMENT SHOULD NOT INCLUDE HVAC, PLUMBING OR ELECTRICAL WORK. THAT WORK WILL BE PERFORMED BY SUBCONTRACTORS, WHO WILL PULL THEIR OWN PERMITS. I AM UPLOADING THE ORIGINAL SET OF PLANS FOR YOUR REFERENCE. I AM ALSO UPLOADING AMENDED VERSIONS OF SHEETS A1 AND A9 THAT NOW INCLUDE THE BASEMENT APARTMENT. NO OTHER SHEETS OF THE ORIGINAL PERMITS HAVE BEEN MODIFIED. THE NEW SHEETS ARE SIGNED AND SEALED. ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS. *TWO PLAN SHEETS WERE PREVIOUSLY APPROVED, *APPROVING FOR INTERIOR WORK ON BASEMENT APT ONLY | $100,000 | Sep 28, 2023 |
| COM2023 | AA CONV: Full Description Loaded as Comment | — | Jul 24, 2023 |
| COM2022 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY II) DEMOLITION: REMOVE, INSULATE AND REPLACE EXISTING CONCRETE SLAB IN BASEMENT (4''CONCRETE/4''GRAVEL/NO CURBING OR UNDERPINNING TO BE DONE), REPLACE OR REINFORCE EXISTING FLOOR JOISTS - ADD NEW STAIRCASE FOR BASEMENT ACCESS - REPLACE EXISTING MAIN STAIRCASE (STAIRCASE WILL BE TREAD: 9''MIN, RISE: 8 1/4''MAX AND WIDTH: 36''MIN)- ADD NEW INSULATION - REPLACE ALL EXISTING WINDOWS AND DOORS (WITHIN THE SAME SIZE AND LOCATION) - ADD NEW INTERIOR FRAMING THE PLANS AND A ROOF-TOP DECK, WILL APPLY FOR A SEPARATE PERMIT LATER FOR SOLAR PANELS, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE AND PER SUBMITTED PLANS.*************** AS PER CHAP: EUTAW PL - MADISON AV HIST/ARCH PRES DISTRICT - APPROVED AS PER CHAP ATP: ON FAÇADE: REMOVE FLAKING AND PEELING WHITE PAINT FROM COLUMNS AND TRIM. REPAINT 1ST FLOOR WINDOW TRIM BLUE TO MATCH UPPER STORIES WINDOWS AND FRAMES. THIRD STORY BALCONY TO BE PAINTED SHERWIN WILLIAMS SW-7604. REFRAME AND REPAIR FRONT PORCH AND INSTALL NEW CERAMIC TILE TO REPLACE BROKEN WITH MEROLA TILE ARTE EVOQUE CARTHUSIAN. REPAIR AND REPAINT 3RD FLOOR BALCONY. REPAIR GALVANIZED METAL AND REPLACE TO MATCH WITH MIRATEC COMPOSITE TRIM AND PAINT TO MATCH. SCRAPE AND REPAINT CORNICE TO MATCH ORIGINAL COLOR. INSTALL NEW GUTTER AND DOWNSPOUT TO DRAIN TO FRONT YARD TO RIGHT SIDE OF THE EXISTING BALCONY. REPAIR TO MATCH STUCCO OF FRONT YARD RETAINING WALL. REMOVE BRICK CAP AND REPLACE WITH CEMENT CAP TO MATCH NEIGHBORS RETAINING WALL CAP. MATCH MISSING ENTRY SINGLE LITE DOOR AND INSTALL WITH NEW WOOD DOUBLE DOOR WITH SINGLE LITES TO FILL ORIGINAL OPENING AND DIMENSIONS AND REPLACE TRANSOM TO MATCH IN WOOD. REMOVE AND DISPOSE 2ND FLOOR BALCONY DOOR AND REPLACE WITH CUSTOM WOOD DOOR. RETAIN AND REPAIR LEADED TRANSOM. REMOVE FIRST FLOOR REPLACEMENT WINDOWS AND INSTALL NEW HH WOOD SIMULATED DIVIDED DOUBLE HUNG WINDOWS TO FIT ORIGINAL OPENINGS. REMOVE AND DISPOSE 3RD FLOOR WINDOWS WITH NEW ALPEN ZENITH FIBERGLASS WINDOWS IN ORIGINAL OPENINGS. REMOVE AND DISPOSE SEVERELY DETERIORATED 3RD FLOOR FRENCH WINDOWS WITH ALPEN FIBERGLASS DOUBLE CASEMENT WINDOWS TO FIT FRENCH WINDOW OPENINGS. INSTALL NEW ALPEN FIBERGLASS CASEMENT BASEMENT WINDOW. REPAIR, RETAIN OR REPLACE TO MATCH ANY BALTIMORE BULLNOSE TRIM IN FRONT ELEVATION; NEW WINDOWS SHOULD FIT WITHIN THE BRICKMOLD WITHOUT ADDITIONAL FRAMING. ON ROOF: REPAIR AND INSTALL NEW ROOF FRAMING AND NEW RUBBER MEMBRANE ROOF. INSTALL NEW SOLAR ATRIUM (NOT VISIBLE FROM STREET LEVEL) IN SAME LOCATION AS EXISTING SKYLIGHT. CONSTRUCT AND INSTALL NEW ROOF DECK SETBACK 8FT FROM FRONT ELEVATION. ON REAR ELEVATION: INSTALL NEW ALPEN SIMULATED DOUBLE HUNG WINDOWS IN SIDE AND REAR ELEVATIONS TO FIT ORIGINAL OPENINGS AND LOCATIONS. INSTALL NEW ALPEN FIBERGLASS WINDOW IN EXISTING BASEMENT OPENING. INSTALL NEW SINGLE LITE WOOD DOOR IN BASEMENT LEVEL OPENING THAT PROPERLY FITS THE OPENING. INSTALL NEW WOOD DECK AND STAIRS TO GROUND LEVEL WITH RAILING OFF 1ST FLOOR LEVEL. INSTALL NEW SINGLE LITE WOOD DOOR OFF 1ST FLOOR. INSTALL NEW ALPEN FIBERGLASS WINDOW IN 1ST FLOOR WINDOW OPENING TO FILL ORIGINAL OPENING. INSTALL NEW 2ND STORY WOOD DECK WITH RAILING. INSTALL NEW SINGLE LITE WOOD DOOR IN 2ND STORY ENTRY AND NEW ALPEN FIBERGLASS CASEMENT WINDOW. INSTALL NEW 3RD STORY WOOD DECK WITH RAILING. INSTALL WOOD FRAME AND FIBER CEMENT SIDING ON 2ND AND 3RD STORY WALL ELEVATIONS. INSTALL NEW SINGLE LITE WOOD DOOR IN 3RD STORY OPENING. INSTALL NEW ALPEN FIBERGLASS CASEMENT WINDOW IN 3RD STORY OPENING. INSTALL NEW SIDEWALK AND GRAVEL PARKING PAD IN REAR YARD. INSTALL NEW METAL SPIRAL STAIRCASE IN REAR SIDE BREEZEWAY. ALL WORK TO BE COMPLETED AS PER PLANS IN CHAP FILES EXCEPT WHERE THIS ATP SUPERSEDES. ASSIGNED TO CHAP 12/5. | $300,000 | Dec 19, 2022 |
| COM2021 | AS PER CHAP: ON REAR FAÇADE WHERE A NONHISTORIC ADDITIONS WAS REMOVED, REPAIR WALL BY REPLACING SEVERAL BRICK, REPOINTING WHERE NEEDED, FILL HOLES, AND CLEAN. NEW BRICK SHOULD MATCH ORIGINAL BRICK AS MUCH AS POSSIBLE. | $1,000 | Sep 3, 2021 |
| COM2020 | INSTALL (1) 100 AMPS ELECTRIC SERVICE UP TO 600V (#AMPS), (2) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | $800 | Jul 9, 2020 |
| COM2019 | remove and dispose existing non-historic porches and balconies as per code and per plans remove and dispose rear bay windows as per plans and per code brace and stabilize as per code on rear elevation as needed. *reconstructed rear elevation tbd scope of work: interior/exterior alterations to include: rear balconies will be removed (chap approval has already been obtained for the removal of the balconies. see attached atp). we will remove interior stucco, wood lathe, finished floors, and ceiling stucco and lathe. all work will be done according to baltimore city code. *this permit is for the removal only, separate permit will be pulled for reconstruction/renovations* | $12,000 | Oct 10, 2019 |
| COM2019 | *authorization to proceed* remove rear wood frame fire escape as per code and dispose of as per code secure rear egress openings as per code. | $1,200 | Aug 28, 2019 |
Violations
1| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 306.1 | O | $50 | $150 | Oct 1, 2018 |
Inspections
0No inspections on record.
Nearby recent activity
- violation: SW-Dirty AlleyJul 9, 2026 · 127 m · 2218 MORRIS ST
- violation: HCD-Sanitation PropertyJul 6, 2026 · 65 m · 2304 EUTAW PL
- violation: SW-Dirty AlleyJul 6, 2026 · 137 m · 2269 MADISON AVE
- violation: PM 305.2.2Jun 30, 2026 · 132 m · 2309 MADISON AVE
- violation: PM 305.3Jun 25, 2026 · 74 m · 2304 EUTAW PL
- violation: HCD-Sanitation PropertyJun 24, 2026 · 65 m · 2304 EUTAW PL
- permit: BRCMJun 24, 2026 · 105 m · 2235 EUTAW PL
- violation: HCD-Sanitation PropertyJun 16, 2026 · 141 m · 2309 MADISON AVE
- permit: BRCMJun 15, 2026 · 81 m · 2328 EUTAW PL
- permit: BRCMJun 12, 2026 · 124 m · 2355 EUTAW PL
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.