Baltimore City · 21217
811 NEWINGTON AVE
Property watching is a Pro feature. Join the waitlist to get new permits, violations, and inspections on this property in a daily email digest.
Already have Pro access? Sign in.
- Total assessment
- $442,900
- Land use
- Residential (R)
- Year built
- 1900
- Last sale
- Feb 4, 2026
Assessment
| Owner | GILLIAM, MEGAN |
|---|---|
| Land use | Residential (R) |
| Total assessment | $442,900 (cycle 2026) |
| Last sale | Feb 4, 2026 — $495,000 |
| Year built | 1900 |
| Zoning | R-8 |
| Vacant | — |
Permits
13| Type | Description | Cost | Issued |
|---|---|---|---|
| BRCM | SCOPE OF WORK: ------ EXTERIOR ALTERATIONS -------- - We are doing a 9.66 KW DC roof mount solar installation. It's a Solar PV system comprises of 21 CANADIAN SOLAR CS6.1-54TM-460H 460W PV MODULES,06 HOYMILES HM-1500NT MICRO INVERTER @240V, 1438W, 5.99A.Our system size in DC and AC would be 9.66 KW DC and 8.63 KW AC. Over the roof, we are installing the junction box and then from that point the wires are coming down to the combiner. Roof Grounding is done and we use 06 AWG Bare copper wire for that. For the wires coming down from roof, we use 10 AWG THWN-2, COPPER wire for the grounding and from combiner till the line side connection we use the 08 AWG THWN-2 COPPER wire. We would be installing a 125A AC combiner(in which both strings would be combined).In the combiner box we are installing two 30A double pole breakers, one for each string, along we are installing two disconnects, one is 60A Non Fused Disconnect that would be installed outside beside the utility meter and one 60A Fused disconnect(with 50A Fuses) that would be installed beside the Main service panel and as far as the solar interconnection is concerned we are doing a line side connection in the Main Service Panel. Moreover, we are adding one more branch circuit in which we are placing the 30A(double pole) breaker of the SPD(Surge Protection Device),wire size for this one is 8 AWG. We are using 10AWG wire for the AC run over the roof and then from the Junction box till the AC combiner Box. After combiner box, we are using 06 AWG wire in our engineering plans. We are using ILSCO IPC 250MCM-1 CONN line side taps in order to make the line side connection. AS PER PLANS AND AS PER CODE. | $15,900 | Apr 28, 2026 |
| BRCM | Scope of work: Exterior alterations to include: Solar panel installation: 9.660 KW DC Roof Mount Solar Installation, as per code as per plans/specifications | $15,900 | Mar 25, 2026 |
| BRCM | REMOVE/REPLACE 8 WINDOWS; NO STRUCTURAL CHANGES | $17,070 | Mar 3, 2026 |
| USE2024 | USE AS A SINGLE-FAMILY DWELLING. | — | Nov 6, 2024 |
| COM2024 | REINSTATE ORIGINAL PERMIT. (ORIGINAL PERMIT:COM2024-52956: INSTALL (1) 200 AMPS ELECTRIC SERVICE (>600 V), (36) # BRANCH CIRCUITS/FEEDERS , (1) 90 AMPS SUB FEEDERS FOR ADDITIONAL METERS ONLY AS PER CODE.) Original Permit Description:(COM2024-52956) INSTALL (1) 200 AMPS ELECTRIC SERVICE (>600 V), (36) # BRANCH CIRCUITS/FEEDERS , (1) 90 AMPS SUB FEEDERS FOR ADDITIONAL METERS ONLY AS PER CODE. | — | Sep 26, 2024 |
| COM2024 | Extend Original Permit.(original permit:COM2024-51066:SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: REMOVAL OF NON-STRUCTURAL WALLS AND REMOVAL OF ALL ASSOCIATED DEBRIS, REPLACEMENT OF SHEETROCK, INSTALLATION OF NEW KITCHEN CABINETS, INSTALL NEW FLOORING, INSTALL RUBBER ROOFING OVER EXISTING ROOF, REPLACEMENT OF EXTERIOR DOORS, INTERIOR DOORS AND WINDOWS (DOORS AND WINDOWS WITHIN EXISTING OPENINGS), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. ) Original Permit Description:(COM2024-51066) SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: REMOVAL OF NON-STRUCTURAL WALLS AND REMOVAL OF ALL ASSOCIATED DEBRIS, REPLACEMENT OF SHEETROCK, INSTALLATION OF NEW KITCHEN CABINETS, INSTALL NEW FLOORING, INSTALL RUBBER ROOFING OVER EXISTING ROOF, REPLACEMENT OF EXTERIOR DOORS, INTERIOR DOORS AND WINDOWS (DOORS AND WINDOWS WITHIN EXISTING OPENINGS), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. | — | Jul 23, 2024 |
| COM2024 | INSTALL (2) 90000 BTU FUEL-BURNING EQUIP, (16) # PLUMBING FIXTURES, (1) # SANITARY CONNECTION (RECONSTRUCTION0, (1) # WATER SERVICE PIPE (RECONSTRUCTION), (1) 50000 BTU FUEL-BURNING EQUIP AS PER CODE. | $2,500 | Jul 5, 2024 |
| COM2024 | EXTERIOR WORK: INSTALL 4'' CONCRETE PAVING ON TOP OF EXISTING 6'' PAD FOR PROPOSED DRIVEWAY AS PER CODE AND AS PER SKETCH | $1,500 | Jul 3, 2024 |
| COM2024 | INSTALL (6) 40 CFM EXHAUST SYSTEMS , (2) 24000 BTU AIR-CON SYSTEM, HEAT PUMP, (1) # NEW DISTRIBUTION SYSTEM (1-2 FAMILY), (2) 72000 BTU FUEL-BURNING EQUIP(FURNACE) AS PER CODE. | $8,500 | Jul 1, 2024 |
| COM2024 | SCOPE OF WORK: EXTERIOR ALTERATIONS TO INCLUDE: REMOVAL AND REPLACEMENT OF EXISTING PARKING DRIVEWAY OF 15'X58', IN THE SAME SIZE AND LOCATION, ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE (*NOTES: 1. ALL EXTERIOR WORK WILL BE DONE WITHIN PRIVATE PROPERTY LINES) | $5,000 | Jun 25, 2024 |
| COM2024 | INSTALL (1) 200 AMPS ELECTRIC SERVICE (>600 V), (36) # BRANCH CIRCUITS/FEEDERS , (1) 90 AMPS SUB FEEDERS FOR ADDITIONAL METERS ONLY AS PER CODE. | $11,000 | Jan 30, 2024 |
| COM2024 | SCOPE OF WORK: INTERIOR/EXTERIOR ALTERATIONS TO INCLUDE: INTERIOR (CATEGORY I) DEMOLITION: REMOVAL OF NON-STRUCTURAL WALLS AND REMOVAL OF ALL ASSOCIATED DEBRIS, REPLACEMENT OF SHEETROCK, INSTALLATION OF NEW KITCHEN CABINETS, INSTALL NEW FLOORING, INSTALL RUBBER ROOFING OVER EXISTING ROOF, REPLACEMENT OF EXTERIOR DOORS, INTERIOR DOORS AND WINDOWS (DOORS AND WINDOWS WITHIN EXISTING OPENINGS), ALL WORK WILL BE DONE ACCORDING TO BALTIMORE CITY CODE. | $95,000 | Jan 22, 2024 |
| COM2023 | INTERIOR DEMO OF 1500 SQ FT OF DRYWALL AS PER CODE | $2,500 | Sep 1, 2023 |
Violations
3| Kind | Category | Status | Fine | Balance | Date |
|---|---|---|---|---|---|
| citation | PM 305.2.2 | P | $50 | $0 | May 27, 2025 |
| citation | PM 305.2.2 | P | $50 | $0 | May 8, 2025 |
| citation | BC 114.14 | P | $500 | $0 | Feb 20, 2024 |
Inspections
0No inspections on record.
Nearby recent activity
- permit: BUSEJul 7, 2026 · 92 m · 813 WHITELOCK ST
- violation: SW-Dirty AlleyJul 4, 2026 · 99 m · 807 WHITELOCK ST
- violation: SW-Dirty AlleyJul 4, 2026 · 101 m · 811 WHITELOCK ST
- violation: HCD-Sanitation PropertyJul 3, 2026 · 142 m · 2325 CALLOW AVE
- violation: PM 305.2.2Jul 2, 2026 · 51 m · 2205 BROOKFIELD AVE
- violation: PM 306.1Jul 2, 2026 · 51 m · 2205 BROOKFIELD AVE
- violation: HCD-Maintenance StructureJun 29, 2026 · 43 m · 810 NEWINGTON AVE
- permit: BRCMJun 27, 2026 · 101 m · 825 WHITELOCK ST
- violation: SW-HGWJun 26, 2026 · 121 m · 833 WHITELOCK ST
- violation: SW-Dirty AlleyJun 18, 2026 · 57 m · 806 RESERVOIR ST
Records marked with * are matched by address, not a direct account link. Data is informational only.
Data freshness: city-311: 2026-07-12; city-ecb-citations: 2026-07-12; city-housing-inspections: 2026-07-12; city-permits: 2026-07-12; city-real-property: 2026-07-12; city-vbn: 2026-07-12; county-permits: 2026-07-12; sdat-properties: 2026-07-12;
Official sources: Maryland SDAT, Baltimore City permits.